4519 N ST CLAIR AVE 91604

Certificate Information: 4519 N ST CLAIR AVE 91604

Application / Permit
22010-20000-00015
Plan Check / Job No.
B22VN00048
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
PROPOSE TWO STORY SFD WITH ATTACHED GARAGE AT FIRST FLOOR OVER HABITABLE BASEMENT _ BUILDING SHALL BE FULLY SPRINKLER THROUGH OUT WITH NFPA 13D [SEE COMMENTS].
Permit Issued
Issued on 7/15/2022
Issuing Office
Current Status
CofO Issued on 3/27/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/3/2022 APPLICANT
Assigned to Plan Check Engineer 2/3/2022 DAWN MC NULTY
Corrections Issued 2/11/2022 DAWN MC NULTY
Quality Review Completed 2/22/2022 STEVEN KIM
Building Plans Picked Up 2/22/2022 APPLICANT
Applicant returned to address corrections 6/3/2022 DAWN MC NULTY
Applicant returned to address corrections 6/28/2022 DAWN MC NULTY
Plan Check Approved 7/15/2022 DAWN MC NULTY
Issued 7/15/2022 APPLICANT
CofO in Progress 2/26/2024 CHRISTOPHE COCHRAN
Permit Finaled 3/27/2024 DANIEL ORRANTE
CofO Issued 3/27/2024 DANIEL ORRANTE
Permit Finaled 3/27/2024 DANIEL ORRANTE

Permit Application Clearance Information

Miscellaneous Cleared 2/10/2022 DAWN MC NULTY
Address approval Cleared 3/16/2022 CARLOS AGUILERA
Permit Cleared 3/16/2022 CARLOS AGUILERA
Hydrant and Access approval Cleared 3/20/2022 CINDY JOSSELYN
Eng Process Fee Ord 176,300 Cleared 3/21/2022 CARLOS AGUILERA
Sewer availability Cleared 3/21/2022 CARLOS AGUILERA
Work Adjacent to Public Way Cleared 3/21/2022 CARLOS AGUILERA
ZI Cleared 4/21/2022 PABLO ESTRADA
Trees in Parkway Cleared 4/28/2022 ADALBERTO VERA
Low Impact Development Cleared 4/29/2022 CHRIS VONG
Roof/Waste drainage to street Cleared 4/29/2022 CARLOS AGUILERA
Excavation more than 5-ft deep Cleared 6/6/2022 CALOSHA APPROVED

Contact Information

Contractor Kovacs Design Build; Lic. No.: 1088610-B 5745 KATHERINE AVE      SHERMAN OAKS, CA 91401
Engineer Cefali,, David Allen; Lic. No.: S3658 4344 LAUREL CANYON BLVD_STE 3      STUDIO CITY, CA 91604
Engineer Garcia,, Francisco Diaz; Lic. No.: C88029 2919 BURBANK BLVD STE D      BURBANK, CA 91505
Engineer Haddad,, Raymond M; Lic. No.: GE2985 17106 CEREDO PL      GRANADA HILLS, CA 91344
Engineer Messiha,, Hany Gamil; Lic. No.: C56766 19648 MULBERRY DR      WALNUT, CA 91789

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 8/5/2022 Conditional Approval CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 8/18/2022 Partial Approval CHRISTOPHE COCHRAN
Footing/Foundation/Slab 8/18/2022 Not Ready for Inspection CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 8/22/2022 Approved CHRISTOPHE COCHRAN
Footing/Foundation/Slab 8/22/2022 Partial Approval CHRISTOPHE COCHRAN
Underground Mechanical 9/6/2022 Approved CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 9/8/2022 Conditional Approval CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 9/9/2022 Partial Approval JOHN HAYES
Excavation/Setback/Form/Re-Bar 9/13/2022 Partial Approval JOHN HAYES
Deputy Reinf. Concrete 9/15/2022 Partial Approval MATT KELLERMAN
Footing/Foundation/Slab 10/12/2022 Partial Approval ROBERT GOLD
Footing/Foundation/Slab 10/19/2022 Partial Approval CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 10/31/2022 Partial Approval CHRISTOPHE COCHRAN
Wood Frame 10/31/2022 Partial Approval CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 11/21/2022 Partial Approval CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 12/7/2022 Not Ready for Inspection JOHN COLEMAN
Sewer 12/7/2022 Approved JOHN COLEMAN
Floor/Roof Diaphrgm/Shear Wall 12/14/2022 Corrections Issued CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 12/21/2022 Conditional Approval CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 12/27/2022 Approved CHRISTOPHE COCHRAN
Footing/Foundation/Slab 12/27/2022 Partial Approval CHRISTOPHE COCHRAN
Deputy Drilled-In Anchors 1/27/2023 Conditional Approval JUAN VALENZUELA
Deputy Wood Construction 1/27/2023 Conditional Approval JUAN VALENZUELA
Excavation/Setback/Form/Re-Bar 1/31/2023 Approved CHRISTOPHE COCHRAN
Floor/Roof Diaphrgm/Shear Wall 1/31/2023 Partial Approval CHRISTOPHE COCHRAN
Deputy Reinf. Concrete 2/6/2023 Conditional Approval DAVID MATSON
Deputy Steel/Welding 2/14/2023 Conditional Approval MICHAEL SMITH
Pre-Inspection 4/20/2023 Approved CHRISTOPHE COCHRAN
ELECTRICAL-Rough 6/16/2023 Approved CHRISTOPHE COCHRAN
HVAC-Rough 6/16/2023 Corrections Issued CHRISTOPHE COCHRAN
PLUMBING-Rough 6/16/2023 Corrections Issued CHRISTOPHE COCHRAN
Wood Frame 6/16/2023 Not Ready for Inspection CHRISTOPHE COCHRAN
BUILDING-Rough-Frame 7/3/2023 Approved CHRISTOPHE COCHRAN
Green Building Rough 7/3/2023 Approved CHRISTOPHE COCHRAN
HVAC-Rough 7/3/2023 Approved CHRISTOPHE COCHRAN
MERV13>=Rough 7/3/2023 Approved CHRISTOPHE COCHRAN
PLUMBING-Rough 7/3/2023 Approved CHRISTOPHE COCHRAN
Verify Sprinkler Sign Off 7/3/2023 Approved CHRISTOPHE COCHRAN
Insulation 7/12/2023 Approved CHRISTOPHE COCHRAN
Interior/Exterior Lathing 7/24/2023 Not Ready for Inspection CHRISTOPHE COCHRAN
Drywall Nailing 7/27/2023 Approved CHRISTOPHE COCHRAN
Shower Pan 8/8/2023 Approved CHRISTOPHE COCHRAN
Insulation 8/16/2023 Partial Approval CHRISTOPHE COCHRAN
Interior/Exterior Lathing 8/16/2023 Partial Approval CHRISTOPHE COCHRAN
Pre-Inspection 8/16/2023 Partial Approval CHRISTOPHE COCHRAN
Interior/Exterior Lathing 9/29/2023 Approved CHRISTOPHE COCHRAN
Excavation/Setback/Form/Re-Bar 10/13/2023 Partial Approval JOHN COLEMAN
ELECTRICAL-Final 1/17/2024 Not Ready for Inspection JOHN COLEMAN
Green Building Final 1/17/2024 Corrections Issued JOHN COLEMAN
HVAC-Final 1/17/2024 Not Ready for Inspection JOHN COLEMAN
PLUMBING-Final 1/17/2024 Approved JOHN COLEMAN
Smoke Detectors 1/17/2024 Approved JOHN COLEMAN
Final 2/8/2024 Corrections Issued CHRISTOPHE COCHRAN
Footing/Foundation/Slab 2/8/2024 Approved CHRISTOPHE COCHRAN
Green Building Final 2/8/2024 Approved CHRISTOPHE COCHRAN
MERV13>=Final 2/8/2024 Approved CHRISTOPHE COCHRAN
Reinforced Concrete Frame 2/8/2024 Approved CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 2/8/2024 SGSOV Approved CHRISTOPHE COCHRAN
Service/Power Release 2/8/2024 Not Ready for Inspection CHRISTOPHE COCHRAN
Final 2/26/2024 OK to Issue CofO CHRISTOPHE COCHRAN
Service/Power Release 2/26/2024 Approved CHRISTOPHE COCHRAN