3520 N BOUNDARY AVE 1-24 90032

Certificate Information: 3520 N BOUNDARY AVE 1-24 90032

Application / Permit
22010-10000-06138
Plan Check / Job No.
B22LA25172
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 3-STORY 100% AFFORDABLE APARTMENT BUILDING WITH BASEMENT LEVEL (BUILDINGS C). Fire sprinkler NFPA 13 thorughout. 1 0F 8
Permit Issued
Issued on 3/19/2025
Issuing Office
Metro
Current Status
Issued on 3/19/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/13/2022 APPLICANT
Assigned to Plan Check Engineer 12/29/2022 FARSHAD ALIMOHAMADI
Corrections Issued 1/10/2023 FARSHAD ALIMOHAMADI
Quality Review Completed 1/11/2023 KEN GILL
Building Plans Picked Up 1/23/2023 APPLICANT
Disabled Access Plans Picked Up 3/29/2023 APPLICANT
Green Plans Picked Up 6/1/2023 APPLICANT
Applicant returned to address corrections 4/9/2024 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 7/12/2024 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 7/24/2024 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 10/23/2024 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 10/24/2024 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 10/25/2024 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 10/29/2024 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 1/22/2025 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 2/21/2025 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 3/11/2025 FARSHAD ALIMOHAMADI
Applicant returned to address corrections 3/18/2025 FARSHAD ALIMOHAMADI
Plan Check Approved 3/19/2025 FARSHAD ALIMOHAMADI
Issued 3/19/2025 APPLICANT

Permit Application Clearance Information

BHO/Hillside ordinance Cleared 1/16/2024 ADRIAN SANCHEZ
BHO/Hillside ordinance Cleared 1/16/2024 ADRIAN SANCHEZ
BHO/Hillside ordinance Cleared 1/16/2024 ADRIAN SANCHEZ
Address approval Cleared 1/18/2024 CHRISTINA BRACO
Building over 36-ft Cleared 4/9/2024 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 4/9/2024 CALOSHA APPROVED
Public Housing Cleared 4/25/2024 GLEN OLIVER
Eng Process Fee Ord 176,300 Cleared 5/21/2024 DAVID VO
CPC Cleared 5/23/2024 JAZMIN ROQUE
Miscellaneous Cleared 5/23/2024 JAZMIN ROQUE
Miscellaneous Cleared 5/23/2024 JAZMIN ROQUE
ZA Case Cleared 5/23/2024 JAZMIN ROQUE
Hydrant and Access approval Cleared 5/31/2024 LAVEON RIDER
Driveway location Cleared 6/3/2024 JIMMY VIVAR
Driveway location Cleared 6/3/2024 JIMMY VIVAR
Internal circulation Cleared 6/3/2024 JIMMY VIVAR
Internal circulation Cleared 6/3/2024 JIMMY VIVAR
Green Code Cleared 7/16/2024 MICHAEL MARTINEZ
GPI Written Notices Cleared 10/24/2024 FARSHAD ALIMOHAMADI
Grading Pre-Inspection Cleared 10/24/2024 FARSHAD ALIMOHAMADI
Sewer availability Cleared 11/5/2024 JUSTIN BICOL
Highway dedication Cleared 11/9/2024 STEVE MELGAR
Permit Cleared 11/9/2024 STEVE MELGAR
Fire Marshal Fire Life Safety Cleared 1/12/2025 ANDREW KO
"D" conditions Cleared 1/22/2025 JAZMIN ROQUE
"Q" conditions Cleared 1/22/2025 JAZMIN ROQUE
Frnt yard landscape/Water mgmt Cleared 1/22/2025 JAZMIN ROQUE
Opn space landscape/Water mgmt Cleared 1/22/2025 JAZMIN ROQUE
Site Plan review Cleared 1/22/2025 JAZMIN ROQUE
ZI Cleared 1/22/2025 JAZMIN ROQUE
DAS Clearance Cleared 1/28/2025 FARSHAD ALIMOHAMADI
Miscellaneous Cleared 2/11/2025 TERRY PHAN
Construction near power lines Cleared 2/19/2025 RIDWAN HARDY
Low Impact Development Cleared 2/23/2025 MARTIN FRAGOSO
Stormwater Pollution Mitigatn Cleared 2/23/2025 MARTIN FRAGOSO
Roof/Waste drainage to street Cleared 2/24/2025 DAVID LOPEZ
DCP conditions approval Cleared 2/27/2025 KE ZHANG
Density Bonus Cleared 2/27/2025 KE ZHANG
SB8 RUD Cleared 2/27/2025 KE ZHANG
CPC Cleared 3/6/2025 JAZMIN ROQUE
Disturb/Remove Protected Trees Cleared 3/11/2025 ADALBERTO VERA
Trees in Parkway Cleared 3/11/2025 PEDRO ZUNIGA

Contact Information

Architect Swift,, Daniel R; Lic. No.: C32860 4601 WESTOWN PARKWAY SUITE 208      WEST DES MOINES, IA 50266
Contractor Olson R D Construction Inc; Lic. No.: 953845-B 400 SPECTRUM CENTER DR   STE 1200    IRVINE, CA 92618
Engineer Clandening,, Kurtis James; Lic. No.: S3926 1518 18TH STREET #1      SANTA MONICA, CA 90404

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 3/21/2025 Approved RAFAEL CORTES
Deputy Reinf. Concrete 6/4/2025 Conditional Approval RAFAEL CORTES
Footing/Foundation/Slab 6/4/2025 Partial Approval RAFAEL CORTES
Reinforced Concrete Frame 7/1/2025 Partial Approval RONALD JIMENEZ
Footing/Foundation/Slab 7/8/2025 Partial Approval RONALD JIMENEZ
Piling/Pier/Caisson 7/8/2025 Partial Approval RONALD JIMENEZ
Footing/Foundation/Slab 7/22/2025 Partial Approval RAFAEL CORTES
Structural Steel Frame 8/21/2025 Not Ready for Inspection RAFAEL CORTES
Structural Steel Frame 8/26/2025 Partial Approval PAUL BAZERKANIAN
Excavation/Setback/Form/Re-Bar 9/15/2025 Partial Approval RAFAEL CORTES
Footing/Foundation/Slab 9/15/2025 Partial Approval RAFAEL CORTES
Footing/Foundation/Slab 10/2/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 11/4/2025 Partial Approval RAFAEL CORTES
Green Building Rough 11/4/2025 Not Ready for Inspection RAFAEL CORTES
Verify Sprinkler Sign Off 11/4/2025 Not Ready for Inspection RAFAEL CORTES
Wood Frame 11/4/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 11/21/2025 Partial Approval PAUL BAZERKANIAN
Floor/Roof Diaphrgm/Shear Wall 12/4/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 12/11/2025 Not Ready for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 12/15/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 1/6/2026 Not Ready for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 1/7/2026 Partial Approval RAFAEL CORTES
Green Building Rough 1/7/2026 Partial Approval RAFAEL CORTES
Verify Sprinkler Sign Off 1/7/2026 Not Ready for Inspection RAFAEL CORTES
Wood Frame 1/7/2026 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 1/9/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 1/26/2026 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 2/4/2026 Conditional Approval RAFAEL CORTES
Insulation 2/4/2026 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 2/6/2026 Not Ready for Inspection RONALD JIMENEZ
Green Building Rough 2/6/2026 Not Ready for Inspection RONALD JIMENEZ
Insulation 2/6/2026 Not Ready for Inspection RONALD JIMENEZ
Verify Sprinkler Sign Off 2/6/2026 Not Ready for Inspection RONALD JIMENEZ
Wood Frame 2/6/2026 Partial Approval RONALD JIMENEZ
Insulation 2/9/2026 Not Ready for Inspection RAFAEL CORTES
Wood Frame 2/9/2026 Partial Approval RAFAEL CORTES
Insulation 2/10/2026 Partial Approval RAFAEL CORTES
Insulation 2/13/2026 Partial Approval RONALD JIMENEZ
Drywall Nailing 2/24/2026 Not Ready for Inspection RAFAEL CORTES
Insulation 2/24/2026 Partial Approval RAFAEL CORTES
Insulation 2/27/2026 Partial Approval RAFAEL CORTES
Insulation 3/6/2026 Partial Approval RAFAEL CORTES
Interior/Exterior Lathing 3/9/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 3/13/2026 Partial Approval ALFREDO LOPEZ
Insulation 3/13/2026 Partial Approval ALFREDO LOPEZ
Drywall Nailing 3/19/2026 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 3/19/2026 Partial Approval RAFAEL CORTES
Insulation 3/20/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 3/25/2026 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 3/31/2026 Not Ready for Inspection RONALD JIMENEZ
Wood Frame 3/31/2026 Partial Approval RONALD JIMENEZ
Wood Frame 4/3/2026 Not Ready for Inspection RAFAEL CORTES
Insulation 4/7/2026 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 4/8/2026 Partial Approval RAFAEL CORTES
Wood Frame 4/8/2026 Partial Approval RAFAEL CORTES
Insulation 4/10/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 4/20/2026 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 4/23/2026 Partial Approval RAFAEL CORTES
Drywall Nailing 4/30/2026 Partial Approval RAFAEL CORTES
Interior/Exterior Lathing 4/30/2026 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 5/8/2026 Partial Approval PAUL BAZERKANIAN
Drywall Nailing 5/12/2026 Approved RAFAEL CORTES
Light Gage Steel Frame 5/21/2026 Not Ready for Inspection RAFAEL CORTES
Light Gage Steel Frame 5/26/2026 Partial Approval RAFAEL CORTES