6066 W OLYMPIC BLVD 1-120 90036

Certificate Information: 6066 W OLYMPIC BLVD 1-120 90036

Application / Permit
22010-10000-06040
Plan Check / Job No.
B22LA24985
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
eplan New Mixed Use Building. 2 Levels of Type IA Construction - Below Grade Parking, Type IA Construction - Ground Floor Retail (3692 SF), Parking and amenities under (5) Levels of Type IIIA Construction 120 Residential Units. 12 units restricted to Extremely Low Income Households per 12.22.A.31. 1 of 3
Permit Issued
Issued on 3/4/2025
Issuing Office
West Los Angeles
Current Status
Issued on 3/4/2025
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/13/2022 APPLICANT
Assigned to Plan Check Engineer 1/19/2023 TSE MING HUANG
Corrections Issued 2/1/2023 TSE MING HUANG
Quality Review Completed 2/3/2023 EUGENE BARBEAU
Applicant returned to address corrections 12/4/2023 TSE MING HUANG
Applicant returned to address corrections 12/12/2023 TSE MING HUANG
Applicant returned to address corrections 1/17/2024 TSE MING HUANG
Plan Check Approved 10/28/2024 TSE MING HUANG
Issued 3/4/2025 APPLICANT

Permit Application Clearance Information

Address approval Cleared 9/15/2023 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 9/18/2023 JEANIE LAM
Trees in Parkway Cleared 12/19/2023 ADALBERTO VERA
Bicycle Parking Cleared 1/3/2024 KATHERINE MENDOZA
Encroachment in public way Cleared 1/3/2024 KATHERINE MENDOZA
Driveway location Cleared 1/4/2024 COLLINS ALLAN
DAS Clearance Cleared 1/16/2024 Joe Vo
Building over 36-ft Cleared 1/24/2024 CALOSHA APPROVED
Green Code Cleared 1/30/2024 Joe Vo
Sewer availability Cleared 2/5/2024 JEANIE LAM
Hydrant and Access approval Cleared 2/29/2024 KURT CORRAL
Highway dedication Cleared 3/7/2024 WALLIE JONG
Permit Cleared 3/7/2024 WALLIE JONG
CPC Cleared 3/19/2024 DALIA MOKAYED
Comm Cor/Mini-Mall Cleared 3/19/2024 DALIA MOKAYED
Comm Cor/Mini-Mall Cleared 3/19/2024 DALIA MOKAYED
Miscellaneous Cleared 3/19/2024 DALIA MOKAYED
Excavation more than 5-ft deep Cleared 3/21/2024 CALOSHA APPROVED
Stormwater Pollution Mitigatn Cleared 4/23/2024 AMMAR ELTAWIL
Roof/Waste drainage to street Cleared 4/25/2024 WALLIE JONG
Fire Marshal Fire Life Safety Cleared 4/29/2024 ANDREW KO
Work Adjacent to Public Way Cleared 8/27/2024 JOSE RODRIGUEZ
ZA Case Cleared 9/5/2024 RICARDO MARTINEZ
ZA Case Cleared 9/5/2024 RICARDO MARTINEZ
ZA Case Cleared 9/5/2024 RICARDO MARTINEZ
ZA Case Cleared 9/5/2024 RICARDO MARTINEZ
Comm Cor/Mini-Mall Cleared 9/16/2024 DALIA MOKAYED
Frnt yard landscape/Water mgmt Cleared 9/16/2024 DALIA MOKAYED
Opn space landscape/Water mgmt Cleared 9/16/2024 DALIA MOKAYED
Density Bonus 12.22.A.31 Cleared 10/3/2024 MICHAEL ZIRBES
SB8 RUD Cleared 10/3/2024 MICHAEL ZIRBES
Miscellaneous Cleared 10/7/2024 DALIA MOKAYED

Contact Information

Architect Kim,, Mark Sung-Eun; Lic. No.: C31002 1900 MAIN ST. STE 800      IRVINE, CA 92612
Contractor Frymer Construction; Lic. No.: 860661-B 11675 NATIONAL BLVD      LOS ANGELES, CA 90064
Engineer Derkalousdian,, Hrair Harry; Lic. No.: C79694 3622 VIRGINIA STREET      GLENDALE, CA 91214
Engineer Labib,, Youhanna T.; Lic. No.: S4549 319 MAIN STREET      EL SEGUNDO, CA 90245
Geologist Kirkgard,, Susan Franzen; Lic. No.: EG1754 1481 STONEBROOK STREET      AZUSA, CA 91702

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Light Gage Steel Frame 6/8/2026   

Inspection Request History

Excavation/Setback/Form/Re-Bar 8/28/2025 Approved DARRYL ARNOLD
Footing/Foundation/Slab 9/10/2025 Partial Inspection EDWIN GREGORYONA
METHANE-Barrier 9/10/2025 Partial Inspection EDWIN GREGORYONA
METHANE-Subgrade 9/10/2025 Partial Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 9/19/2025 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 9/19/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 9/19/2025 Not Ready for Inspection EDWIN GREGORYONA
Footing/Foundation/Slab 9/24/2025 Not Ready for Inspection DARRYL ARNOLD
METHANE-Barrier 9/24/2025 Conditional Approval DARRYL ARNOLD
METHANE-Subgrade 9/24/2025 Not Ready for Inspection DARRYL ARNOLD
Excavation/Setback/Form/Re-Bar 9/25/2025 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 10/1/2025 Partial Approval JOEY BUCHANAN
Deputy Reinf. Concrete 10/16/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 10/16/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Barrier 10/16/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Subgrade 10/16/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Reinf. Concrete 10/17/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/17/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 10/23/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 10/23/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 10/31/2025 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 10/31/2025 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/31/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 10/31/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 10/31/2025 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 10/31/2025 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/31/2025 Not Ready for Inspection EDWIN GREGORYONA
Masonry Wall/Backfill 11/3/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 11/17/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 11/17/2025 Partial Approval EDWIN GREGORYONA
METHANE-Barrier 11/17/2025 Approved EDWIN GREGORYONA
METHANE-Subgrade 11/17/2025 Approved EDWIN GREGORYONA
Deputy Reinf. Masonry 11/18/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 11/18/2025 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 11/20/2025 Partial Approval EDWIN GREGORYONA
Green Building Rough 11/20/2025 Not Ready for Inspection EDWIN GREGORYONA
METHANE-Rough 11/20/2025 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Masonry Frame 11/20/2025 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 11/20/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Shotcrete 12/10/2025 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 12/10/2025 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Concrete 12/19/2025 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 12/19/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 12/19/2025 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 12/29/2025 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/5/2026 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/5/2026 Partial Approval EDWIN GREGORYONA
Deputy Reinf. Masonry 1/6/2026 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/6/2026 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 1/6/2026 Partial Inspection EDWIN GREGORYONA
Deputy Reinf. Masonry 1/8/2026 Partial Approval EDWIN GREGORYONA
Deputy Shotcrete 1/8/2026 Partial Approval EDWIN GREGORYONA
Footing/Foundation/Slab 1/23/2026 Partial Approval EDWIN GREGORYONA
Green Building Rough 1/28/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Rough 1/28/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Masonry Frame 1/28/2026 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 1/28/2026 Not Ready for Inspection MARTIN TAVITIAN
Deputy Reinf. Concrete 2/2/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 2/2/2026 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 2/6/2026 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 2/12/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 2/13/2026 Partial Approval MARTIN TAVITIAN
Green Building Rough 2/25/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Rough 2/25/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 2/25/2026 Partial Approval MARTIN TAVITIAN
Reinforced Masonry Frame 2/25/2026 Not Ready for Inspection MARTIN TAVITIAN
Verify Sprinkler Sign Off 2/25/2026 Not Ready for Inspection MARTIN TAVITIAN
Deputy Reinf. Concrete 3/3/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 3/3/2026 Partial Approval MARTIN TAVITIAN
Green Building Rough 3/11/2026 Not Ready for Inspection MARTIN TAVITIAN
METHANE-Rough 3/11/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Masonry Frame 3/11/2026 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 3/11/2026 Not Ready for Inspection MARTIN TAVITIAN
Deputy Shotcrete 3/16/2026 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 3/16/2026 Partial Approval MARTIN TAVITIAN
Deputy Shotcrete 3/17/2026 Partial Approval MARTIN TAVITIAN
Green Building Rough 3/17/2026 Approved MARTIN TAVITIAN
METHANE-Rough 3/17/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 3/17/2026 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 3/17/2026 Not Ready for Inspection MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 3/18/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 3/23/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 3/26/2026 Partial Approval MARTIN TAVITIAN
METHANE-Rough 3/26/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Masonry Frame 3/26/2026 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 3/26/2026 Not Ready for Inspection MARTIN TAVITIAN
Deputy Reinf. Masonry 3/27/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Masonry 4/2/2026 Approved MARTIN TAVITIAN
Deputy Reinf. Masonry 4/3/2026 Partial Approval MARTIN TAVITIAN
METHANE-Rough 4/6/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Masonry Frame 4/6/2026 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 4/6/2026 Not Ready for Inspection MARTIN TAVITIAN
Deputy Reinf. Masonry 4/7/2026 Partial Approval CHRISTOPHER BLACKWOOD
METHANE-Rough 4/22/2026 Not Ready for Inspection MARTIN TAVITIAN
Pre-Inspection 4/22/2026 Approved MARTIN TAVITIAN
Verify Sprinkler Sign Off 4/22/2026 Not Ready for Inspection MARTIN TAVITIAN
Pre-Inspection 5/7/2026 Approved MARTIN TAVITIAN
Footing/Foundation/Slab 5/22/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 5/26/2026 Partial Approval MARTIN TAVITIAN
Deputy Reinf. Concrete 5/28/2026 Partial Approval MARTIN TAVITIAN
METHANE-Rough 5/28/2026 Not Ready for Inspection MARTIN TAVITIAN
Reinforced Concrete Frame 5/28/2026 Partial Approval MARTIN TAVITIAN
Verify Sprinkler Sign Off 5/28/2026 Not Ready for Inspection MARTIN TAVITIAN
Deputy Reinf. Concrete 5/29/2026 Partial Approval MARTIN TAVITIAN
Footing/Foundation/Slab 5/29/2026 Partial Approval MARTIN TAVITIAN