5392 E NAVARRO ST 90032

Certificate Information: 5392 E NAVARRO ST 90032

Application / Permit
22010-10000-05775
Plan Check / Job No.
B22LA23960
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
(N) 25' X 32' 1-STORY ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). WORK DONE PER ENGINEERING.
Permit Issued
Issued on 10/28/2024
Issuing Office
Current Status
Issued on 10/28/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 12/13/2022 APPLICANT
Assigned to Plan Check Engineer 12/19/2022 MADISON ODELL
Corrections Issued 12/20/2022 MADISON ODELL
Applicant returned to address corrections 6/26/2023 HANS SANTIAGO
Applicant returned to address corrections 10/1/2024 MADISON ODELL
Applicant returned to address corrections 10/5/2024 MADISON ODELL
Plan Check Approved 10/15/2024 MADISON O'DELL
Issued 10/28/2024 APPLICANT

Permit Application Clearance Information

Grading Pre-Inspection Cleared 1/19/2023 KIRK LINKLATER
Address approval Cleared 7/27/2023 CHRISTINA BRACO
Eng Process Fee Ord 176,300 Cleared 8/3/2023 CHRISTINA BRACO
Sewer availability Cleared 8/3/2023 CHRISTINA BRACO
Construction near power lines Cleared 8/14/2024 RIDWAN HARDY
Construction within easement Cleared 8/14/2024 RIDWAN HARDY
Low Impact Development Cleared 9/13/2024 MARCO SANCHEZ
Roof/Waste drainage to street Cleared 9/19/2024 WALLIE JONG
GPI Written Notices Cleared 10/1/2024 MADISON ODELL

Contact Information

Architect Oshima,, Brian M; Lic. No.: C25849 10927 DOWNEY AVENUE      DOWNEY, CA 90241
Contractor Evolution Design & Development Inc; Lic. No.: 999377-B       ,
Engineer Lu,, Yi; Lic. No.: S5678 P O BOX 2754      PALOS VERDES PENINSULA, CA 90274

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 10/30/2024 Corrections Issued WILLIAM SIERRA
Excavation/Setback/Form/Re-Bar 11/1/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 11/22/2024 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 11/22/2024 Corrections Issued LILIANA PORTILLO
BUILDING-Rough-Frame 11/26/2024 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 11/26/2024 Corrections Issued LILIANA PORTILLO
Insulation 11/26/2024 Partial Approval LILIANA PORTILLO
PLUMBING-Rough 11/26/2024 Partial Approval LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 12/18/2024 Corrections Issued WILLIAM SIERRA
Wood Frame 12/18/2024 Not Ready for Inspection WILLIAM SIERRA
BUILDING-Rough-Frame 1/29/2025 Not Ready for Inspection LILIANA PORTILLO
ELECTRICAL-Rough 1/29/2025 Corrections Issued LILIANA PORTILLO
HVAC-Rough 1/29/2025 Corrections Issued LILIANA PORTILLO
PLUMBING-Rough 1/29/2025 Corrections Issued LILIANA PORTILLO
Verify Sprinkler Sign Off 1/29/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 2/21/2025 Corrections Issued LILIANA PORTILLO
ELECTRICAL-Rough 2/21/2025 Approved LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 2/21/2025 Approved LILIANA PORTILLO
HVAC-Rough 2/21/2025 Approved LILIANA PORTILLO
PLUMBING-Rough 2/21/2025 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 3/4/2025 Approved LILIANA PORTILLO
Insulation 3/4/2025 Corrections Issued LILIANA PORTILLO
Interior/Exterior Lathing 3/4/2025 Partial Approval LILIANA PORTILLO
Drywall Nailing 3/20/2025 Partial Approval REGINA MENDEZ
Interior/Exterior Lathing 3/26/2025 Approved JOSH MEISTER
ELECTRICAL-Final 5/30/2025 Not Ready for Inspection LILIANA PORTILLO
Final 5/30/2025 Not Ready for Inspection LILIANA PORTILLO
Footing/Foundation/Slab 5/30/2025 Approved LILIANA PORTILLO
HVAC-Final 5/30/2025 Not Ready for Inspection LILIANA PORTILLO
PLUMBING-Final 5/30/2025 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 5/30/2025 SGSOV Not Ready LILIANA PORTILLO
Service/Power Release 5/30/2025 Not Ready for Inspection LILIANA PORTILLO
Smoke Detectors 5/30/2025 Not Ready for Inspection LILIANA PORTILLO