940 S MUIRFIELD ROAD 90019

Certificate Information: 940 S MUIRFIELD ROAD 90019

Application / Permit
22010-10000-05506
Plan Check / Job No.
B22LA22858
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
new 21'1"x41'-9" detached ADU at rear of the lot per engineer design and details (800 SF max New Construction per State Law, CA Govt. Code 65852.2(e)(1)(B) and applicable part2 of LAMC 12.22 A.33 (c)-(d), (g))
Permit Issued
Issued on 12/1/2023
Issuing Office
Metro
Current Status
CofO Issued on 9/20/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/10/2022 APPLICANT
Assigned to Plan Check Engineer 11/17/2022 AUNG SOE
Corrections Issued 11/21/2022 AUNG SOE
Building Plans Picked Up 11/29/2022 APPLICANT
Applicant returned to address corrections 10/23/2023 LUKE GONZALES
Plan Check Approved 11/21/2023 VICTOR CHEN
Issued 12/1/2023 APPLICANT
CofO in Progress 9/15/2025 JEFFREY MEAD
Permit Finaled 9/20/2025 DEROLD HAUFF
CofO Issued 9/20/2025 DEROLD HAUFF
Permit Finaled 9/20/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 1/24/2023 ADRIAN SANCHEZ
Construction near power lines Cleared 5/7/2023 RIDWAN HARDY
Low Impact Development Cleared 7/14/2023 SAMUEL LINN
Roof/Waste drainage to street Cleared 7/19/2023 ADRIAN SANCHEZ
Eng Process Fee Ord 176,300 Cleared 10/17/2023 DAVID LOPEZ
Sewer availability Cleared 10/17/2023 DAVID LOPEZ

Contact Information

Architect Scrafano,, Elissa F; Lic. No.: C26071 163 N SYCAMORE      LOS ANGELES, CA 90036
Contractor A R M Builders Inc; Lic. No.: 915352-B 1080 S LA CIENEGA #311      LOS ANGELES, CA 90035
Engineer Brown,, Patrick John; Lic. No.: C45526 7 STARLING      LAGUNA BEACH, CA 92656
Engineer Manalo,, Philip Casis; Lic. No.: S3823 9547 WYSTONE AVE      NORTHRIDGE, CA 91324
Engineer Yamashita,, Mark Alan; Lic. No.: L7155 6718 BIANCA AVE      LAKE BALBOA, CA 91406

Inspector Information

JEFFREY MEAD, (213) 202-3240 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 12/21/2023 No Access for Inspection JOAQUIN GREENOUGH
METHANE-Barrier 12/21/2023 No Access for Inspection JOAQUIN GREENOUGH
METHANE-Subgrade 12/21/2023 No Access for Inspection JOAQUIN GREENOUGH
Excavation/Setback/Form/Re-Bar 12/27/2023 Partial Approval JEFFREY MEAD
Footing/Foundation/Slab 12/27/2023 Partial Approval JEFFREY MEAD
METHANE-Barrier 12/27/2023 Approved JEFFREY MEAD
METHANE-Subgrade 12/27/2023 Approved JEFFREY MEAD
Deputy Reinf. Concrete 12/29/2023 Conditional Approval JOAQUIN GREENOUGH
Underground Mechanical 1/9/2024 Approved JEFFREY MEAD
Excavation/Setback/Form/Re-Bar 1/23/2024 Approved JEFFREY MEAD
Footing/Foundation/Slab 1/23/2024 Approved JEFFREY MEAD
Floor/Roof Diaphrgm/Shear Wall 2/12/2024 Approved AMIR NAZARIAN
ELECTRICAL-Rough 3/20/2024 No Access for Inspection JEFFREY MEAD
HVAC-Rough 3/20/2024 No Access for Inspection JEFFREY MEAD
METHANE-Rough 3/20/2024 No Access for Inspection JEFFREY MEAD
ELECTRICAL-Rough 3/21/2024 Approved JEFFREY MEAD
Floor/Roof Diaphrgm/Shear Wall 3/21/2024 Partial Approval JEFFREY MEAD
Green Building Rough 3/21/2024 Approved JEFFREY MEAD
HVAC-Rough 3/28/2024 Not Ready for Inspection JEFFREY MEAD
Interior/Exterior Lathing 3/28/2024 Approved JEFFREY MEAD
PLUMBING-Rough 3/28/2024 Approved JEFFREY MEAD
HVAC-Rough 4/4/2024 Approved JEFFREY MEAD
Wood Frame 4/4/2024 Approved JEFFREY MEAD
Insulation 8/27/2024 Corrections Issued JEFFREY MEAD
Insulation 9/23/2024 Approved JEFFREY MEAD
Interior/Exterior Lathing 9/26/2024 Approved JEFFREY MEAD
Deputy Wood Construction 11/7/2024 Conditional Approval NICHOLAS LOPEZ
Drywall Nailing 12/31/2024 Approved JEFFREY MEAD
Interior/Exterior Lathing 1/23/2025 Approved JOSE MACIAS
Underground Mechanical 5/14/2025 Approved JEFFREY MEAD
HVAC-Final 6/9/2025 Corrections Issued JEFFREY MEAD
HVAC-Final 6/16/2025 Approved JEFFREY MEAD
PLUMBING-Final 6/16/2025 Approved JEFFREY MEAD
Service/Power Release 6/16/2025 Approved JEFFREY MEAD
BUILDING-Rough-Frame 9/12/2025 Approved JEFFREY MEAD
ELECTRICAL-Final 9/12/2025 Approved JEFFREY MEAD
Final 9/12/2025 OK to Issue CofO JEFFREY MEAD
Green Building Final 9/12/2025 Approved JEFFREY MEAD
HVAC-Final 9/12/2025 Approved JEFFREY MEAD
METHANE-Final 9/12/2025 Approved JEFFREY MEAD
METHANE-Rough 9/12/2025 Approved JEFFREY MEAD
PLUMBING-Final 9/12/2025 Approved JEFFREY MEAD
SGSOV-Seismic Gas S/O Valve 9/12/2025 SGSOV Approved JEFFREY MEAD
Smoke Detectors 9/12/2025 Approved JEFFREY MEAD
Verify Sprinkler Sign Off 9/12/2025 Approved JEFFREY MEAD