Deputy Reinf. Concrete
|
12/24/2024
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/22/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
1/23/2025
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
1/23/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
1/24/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
1/27/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
1/28/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
2/26/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
2/27/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/28/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Footing/Foundation/Slab
|
2/28/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
3/3/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
3/4/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/5/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
3/5/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/6/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
3/7/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
3/19/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
3/20/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
3/21/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/25/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
3/26/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/27/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/28/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/1/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/2/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
4/3/2025
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/4/2025
|
Approved
|
FARHAD DADBIN
|
|
Deputy Reinf. Concrete
|
4/4/2025
|
Partial Approval
|
VASIL MIHALEV
|
|
Footing/Foundation/Slab
|
4/4/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/7/2025
|
Approved
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/16/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
4/18/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/22/2025
|
Approved
|
DERRICK SPENCER
|
|
Green Building Rough
|
4/22/2025
|
Approved
|
DERRICK SPENCER
|
|
Reinforced Concrete Frame
|
4/22/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Verify Sprinkler Sign Off
|
4/22/2025
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
4/23/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
4/24/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
4/24/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
4/25/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Footing/Foundation/Slab
|
4/25/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
4/28/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
4/29/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
4/29/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Footing/Foundation/Slab
|
4/29/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
4/29/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
4/30/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/1/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/2/2025
|
Approved
|
NICK LAROCCA
|
|
Reinforced Concrete Frame
|
5/5/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
5/12/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/14/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/15/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
5/15/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/16/2025
|
Conditional Approval
|
HENRY BAGHDASSARIAN
|
|
Deputy Reinf. Concrete
|
5/19/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/20/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/21/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/22/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/23/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/27/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
5/28/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Footing/Foundation/Slab
|
5/29/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
6/2/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/3/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/4/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/5/2025
|
Conditional Approval
|
VASIL MIHALEV
|
|
Reinforced Concrete Frame
|
6/5/2025
|
Partial Approval
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
6/6/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/9/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/10/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/12/2025
|
Approved
|
NICK LAROCCA
|
|
Deputy Reinf. Concrete
|
6/13/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/13/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/16/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
6/18/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/20/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/23/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/23/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/24/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Reinforced Masonry Frame
|
6/24/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/25/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
6/25/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/26/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/27/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
6/27/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/30/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
6/30/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/1/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/1/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Reinforced Masonry Frame
|
7/1/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/2/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
7/2/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/2/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/3/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/7/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/7/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/7/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
7/7/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/8/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/9/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/10/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/14/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
7/14/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/15/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/16/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
7/16/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
7/17/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
7/17/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
7/17/2025
|
No Access for Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
7/18/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
7/18/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
7/21/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/21/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
7/21/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/22/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/23/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
7/24/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
7/24/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Masonry Frame
|
7/24/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
7/25/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
7/25/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
7/28/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/28/2025
|
Partial Inspection
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
7/28/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
7/29/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
7/29/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
7/29/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
7/30/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
7/30/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Masonry Frame
|
7/30/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
7/31/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
7/31/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
7/31/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/1/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/1/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/1/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/4/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/4/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/4/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/5/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/5/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/6/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/6/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/6/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
8/6/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/7/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/7/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/7/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/8/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
8/8/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/11/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Footing/Foundation/Slab
|
8/11/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/12/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/12/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/13/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/13/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
8/13/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/13/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Reinforced Concrete Frame
|
8/13/2025
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/14/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/14/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/15/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/15/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/18/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/18/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/19/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
8/19/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/20/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/20/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
8/21/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/22/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
8/22/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/22/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/25/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
8/25/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Footing/Foundation/Slab
|
8/25/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/26/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
8/26/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
8/26/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/27/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
8/27/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/28/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
8/28/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Reinforced Concrete Frame
|
8/28/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
8/29/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
8/29/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/2/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Shotcrete
|
9/2/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
9/2/2025
|
Partial Approval
|
VASIL MIHALEV
|
|
Reinforced Concrete Frame
|
9/2/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
9/3/2025
|
Approved
|
DERRICK SPENCER
|
|
Deputy Shotcrete
|
9/3/2025
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/4/2025
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/5/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
9/5/2025
|
Partial Approval
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
9/8/2025
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
9/8/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Footing/Foundation/Slab
|
9/8/2025
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/9/2025
|
Approved
|
VASIL MIHALEV
|
|
Excavation/Setback/Form/Re-Bar
|
9/9/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
9/10/2025
|
Approved
|
VASIL MIHALEV
|
|
Excavation/Setback/Form/Re-Bar
|
9/10/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
9/11/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
9/11/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/12/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
9/12/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
9/15/2025
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
9/15/2025
|
Partial Approval
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/16/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
9/16/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/17/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
9/17/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
9/17/2025
|
Not Ready for Inspection
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/18/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
9/18/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/19/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Shotcrete
|
9/19/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
9/22/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
9/22/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/23/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
9/23/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
9/23/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/24/2025
|
Partial Approval
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
9/25/2025
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
9/26/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
9/30/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/1/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/2/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/2/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/3/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/6/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/7/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/7/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/8/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/9/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/10/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/14/2025
|
Partial Inspection
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/16/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/21/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/21/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/22/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
10/23/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/23/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/24/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/27/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/27/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/28/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/29/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/29/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/30/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/30/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
10/31/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
10/31/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/3/2025
|
Approved
|
DERRICK SPENCER
|
|
Excavation/Setback/Form/Re-Bar
|
11/3/2025
|
Not Ready for Inspection
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
11/4/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/6/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
11/6/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/7/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/10/2025
|
Approved
|
VASIL MIHALEV
|
|
Deputy Reinf. Concrete
|
11/12/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/13/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
11/13/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/14/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/17/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/18/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
11/19/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
11/20/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
11/20/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/21/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Other (see comments)
|
11/24/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
11/24/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
11/25/2025
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
11/25/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
11/26/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/1/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/1/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/2/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/2/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/3/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/4/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/5/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/8/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/8/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/9/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/10/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/10/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/11/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
12/16/2025
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
12/19/2025
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/5/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/8/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/9/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
1/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/12/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/13/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
1/13/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/14/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
1/14/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/15/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
1/15/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/15/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/16/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
1/16/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/16/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
1/16/2026
|
Partial Inspection
|
ROGELIO REYNA
|
|
Deputy Reinf. Concrete
|
1/20/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
1/20/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/21/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
1/21/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/21/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/22/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
1/22/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Pre-Inspection
|
1/22/2026
|
Approved
|
ROGELIO REYNA
|
|
Deputy Reinf. Concrete
|
1/23/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
1/23/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/26/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/27/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
1/27/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/28/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/29/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
1/30/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/2/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/2/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/5/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/9/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/10/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
2/11/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/11/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
2/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/12/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
2/13/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
2/13/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
2/17/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
2/18/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Special/Order Compliance
|
2/18/2026
|
Conditional Approval
|
DANIEL ARMENTA
|
|
Deputy Reinf. Concrete
|
2/19/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/19/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/20/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/23/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/25/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/26/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
2/26/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
2/27/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
2/27/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/2/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
3/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/4/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
3/5/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/5/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
3/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/10/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/17/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
3/18/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/19/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/19/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/20/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/25/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
3/27/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
3/31/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
3/31/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
3/31/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/1/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/2/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/2/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/2/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/2/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Shotcrete
|
4/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/7/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/7/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/7/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/7/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/7/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/8/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/8/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/8/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/8/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/9/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/9/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/9/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/9/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/9/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Reinforced Masonry Frame
|
4/9/2026
|
Not Ready for Inspection
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/10/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/10/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/10/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/13/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/13/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/13/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/14/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/14/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/14/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/14/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/14/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/15/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/15/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/15/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/15/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/16/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/16/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/17/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
4/17/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
4/20/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Drilled-In Anchors
|
4/21/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/21/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/21/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/21/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/21/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/22/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/22/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/22/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
4/22/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/22/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/23/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/23/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/23/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/24/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/24/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/24/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/27/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/27/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/27/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/27/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/28/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/28/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/28/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/29/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/29/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/29/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
4/29/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
4/30/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
4/30/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
4/30/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/5/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/5/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/5/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/5/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/6/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/7/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/7/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/7/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/7/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/8/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/8/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/11/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/13/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/13/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/14/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/14/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/15/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
5/15/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Drilled-In Anchors
|
5/19/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/19/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/19/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/20/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/20/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/20/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/20/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/21/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Concrete
|
5/21/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Reinf. Masonry
|
5/21/2026
|
Approved
|
DERRICK SPENCER
|
|
Deputy Drilled-In Anchors
|
5/22/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/22/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/22/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/26/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/26/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/26/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/26/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/27/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
5/27/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/28/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
5/29/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
5/29/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
5/29/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
5/29/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/1/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/2/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/2/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/2/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/2/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/3/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/4/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/5/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/8/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/8/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/8/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/8/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/9/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/9/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/9/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/9/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/10/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/10/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/10/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/11/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/11/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/11/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/12/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/13/2026
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
6/13/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/15/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
6/16/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Drilled-In Anchors
|
6/17/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Concrete
|
6/17/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Reinf. Masonry
|
6/17/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Deputy Steel/Welding
|
6/17/2026
|
Conditional Approval
|
DANIEL VARNUM
|
|
Excavation/Setback/Form/Re-Bar
|
6/17/2026
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Drilled-In Anchors
|
6/18/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/18/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/18/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Deputy Steel/Welding
|
6/18/2026
|
Conditional Approval
|
PAUL DAVIDSON
|
|
Excavation/Setback/Form/Re-Bar
|
6/18/2026
|
Partial Approval
|
PAUL DAVIDSON
|
|
Deputy Drilled-In Anchors
|
6/22/2026
|
No Result Entered
|
PAUL DAVIDSON
|
|
Deputy Reinf. Concrete
|
6/22/2026
|
No Result Entered
|
PAUL DAVIDSON
|
|
Deputy Reinf. Masonry
|
6/22/2026
|
No Result Entered
|
PAUL DAVIDSON
|