Pre-Inspection
|
8/30/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/31/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/1/2023
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/10/2023
|
Partial Approval
|
TED RIES
|
|
Deputy Drilled-In Anchors
|
10/18/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
10/18/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
10/18/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/18/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
10/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
10/25/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/25/2023
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/25/2023
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
11/1/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/7/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/7/2023
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
11/7/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/8/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/8/2023
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
11/8/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
11/15/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/15/2023
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
11/15/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
11/15/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
11/15/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/21/2023
|
No Access for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/21/2023
|
No Access for Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
11/29/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/29/2023
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
11/29/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
11/29/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
11/29/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
11/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
12/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
12/5/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
12/11/2023
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
12/11/2023
|
Partial Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
12/11/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
12/11/2023
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
12/22/2023
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
12/22/2023
|
Partial Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
12/22/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
12/22/2023
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
12/27/2023
|
Conditional Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
12/27/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
12/29/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
1/5/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/5/2024
|
Partial Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
1/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
1/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
1/9/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
1/10/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
1/10/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
1/10/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
1/10/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
1/19/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
1/19/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
1/19/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/23/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/23/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
1/23/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
1/23/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
1/30/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
1/30/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
1/30/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
1/30/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
1/31/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
1/31/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/9/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
2/9/2024
|
Partial Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
2/9/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
2/9/2024
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
2/13/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
2/13/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
2/22/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
2/22/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
2/22/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
2/22/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
2/23/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
2/23/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
3/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
3/1/2024
|
Partial Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/1/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
3/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
3/5/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
3/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
3/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
3/11/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
3/12/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
3/12/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
3/12/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
3/12/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
3/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
3/13/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
3/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
3/18/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
3/19/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
3/19/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
3/20/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
3/21/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
3/21/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
3/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Pre-Stress Concrete
|
3/27/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
3/27/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
3/27/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
3/27/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
3/29/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
3/29/2024
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
4/4/2024
|
Partial Approval
|
NICK DANERI
|
|
Green Building Rough
|
4/8/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/8/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/8/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/15/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/15/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/15/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/15/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/16/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
4/16/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
4/22/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
4/22/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
4/24/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
4/24/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
4/24/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
4/24/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
4/30/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
4/30/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/30/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/30/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
5/2/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
5/2/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
5/9/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
5/9/2024
|
Partial Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
5/9/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/9/2024
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
5/13/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
5/13/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
5/13/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Pre-Stress Concrete
|
5/24/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
5/24/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Pre-Stress Concrete
|
5/28/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
5/28/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
5/28/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
5/28/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/4/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
6/4/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/6/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
6/6/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/11/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
6/11/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Light Gage Steel Frame
|
6/12/2024
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Deputy Drilled-In Anchors
|
6/14/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/14/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
6/14/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
6/18/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/18/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
6/18/2024
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
6/18/2024
|
Partial Inspection
|
NICK DANERI
|
|
Light Gage Steel Frame
|
6/18/2024
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
6/18/2024
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
6/18/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
6/20/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/20/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
6/20/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
6/20/2024
|
Partial Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
6/20/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/21/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/24/2024
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
6/24/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
6/27/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
6/27/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
7/3/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
7/3/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
7/3/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/10/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
7/10/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
7/17/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
7/17/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
7/18/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Deputy Reinf. Concrete
|
7/24/2024
|
Conditional Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
7/24/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Light Gage Steel Frame
|
7/24/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
7/25/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
7/25/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
7/29/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
7/29/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
7/29/2024
|
No Access for Inspection
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
7/29/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
7/30/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
7/30/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
7/30/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
7/31/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
7/31/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
7/31/2024
|
Conditional Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
7/31/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
8/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
8/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/1/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/6/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/7/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/7/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/8/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/8/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/12/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
8/13/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/14/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/14/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/15/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/15/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/20/2024
|
Conditional Approval
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
8/20/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/21/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/21/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/22/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/22/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/28/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/28/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/29/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Light Gage Steel Frame
|
9/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
9/5/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
9/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
9/12/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
9/13/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
9/19/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/20/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
9/26/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
9/27/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
9/30/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Other (see comments)
|
10/7/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
10/7/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Other (see comments)
|
10/9/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/15/2024
|
Conditional Approval
|
NICK DANERI
|
|
Insulation
|
10/15/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
10/15/2024
|
Partial Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
10/21/2024
|
Approved
|
NICK DANERI
|
|
Insulation
|
10/23/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
10/23/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
10/29/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
11/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
11/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Drywall Nailing
|
11/1/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
11/7/2024
|
Partial Inspection
|
NICK DANERI
|
|
Light Gage Steel Frame
|
11/7/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
11/15/2024
|
Partial Inspection
|
RAMAZANALI ALMASI
|
|
Drywall Nailing
|
11/19/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
11/26/2024
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Drywall Nailing
|
12/2/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
12/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
12/6/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
12/11/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
1/2/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
1/3/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
1/6/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Drywall Nailing
|
1/7/2025
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
1/7/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
1/9/2025
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
1/9/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
1/10/2025
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
1/10/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
1/15/2025
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
1/15/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
1/21/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
1/24/2025
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
1/24/2025
|
Partial Approval
|
NICK DANERI
|
|
T-Bar Ceiling
|
1/27/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
1/29/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
1/29/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
1/30/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/3/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/5/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/7/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
2/20/2025
|
Partial Approval
|
PAUL BAZERKANIAN
|
|
Drywall Nailing
|
3/3/2025
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
3/3/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
3/6/2025
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
3/7/2025
|
Partial Approval
|
NICK DANERI
|
|
Piling/Pier/Caisson
|
3/19/2025
|
Partial Inspection
|
NICK DANERI
|
|
T-Bar Ceiling
|
3/27/2025
|
Partial Approval
|
NICK DANERI
|
|
Pre-Inspection
|
5/15/2025
|
Partial Approval
|
NICK DANERI
|
|
Pre-Inspection
|
5/20/2025
|
Partial Inspection
|
NICK DANERI
|
|
Pre-Inspection
|
5/28/2025
|
Partial Inspection
|
NICK DANERI
|
|
Final
|
6/5/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Footing/Foundation/Slab
|
6/5/2025
|
Approved
|
JOEY BUCHANAN
|
|
Green Building Final
|
6/5/2025
|
Approved
|
JOEY BUCHANAN
|
|
Green Building Rough
|
6/5/2025
|
Approved
|
JOEY BUCHANAN
|
|
Reinforced Concrete Frame
|
6/5/2025
|
Approved
|
JOEY BUCHANAN
|
|
SGSOV-Seismic Gas S/O Valve
|
6/5/2025
|
SGSOV Approved
|
JOEY BUCHANAN
|
|
Smoke Detectors
|
6/5/2025
|
Approved
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
6/5/2025
|
Approved
|
JOEY BUCHANAN
|
|
Verify Sprinkler Sign Off
|
6/5/2025
|
Approved
|
JOEY BUCHANAN
|
|
Non Compliance
|
7/15/2025
|
Not Required
|
JOEY BUCHANAN
|
|
Non Compliance
|
7/28/2025
|
Not Required
|
JOEY BUCHANAN
|
|
Special/Order Compliance
|
1/13/2026
|
Approved
|
JOEY BUCHANAN
|
|
Final
|
1/26/2026
|
Conditional Approval
|
JOEY BUCHANAN
|