Deputy Steel/Welding
|
2/15/2024
|
Conditional Approval
|
KENNETH ROBERTS
|
|
Deputy Steel/Welding
|
2/22/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Pre-Inspection
|
2/29/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/11/2024
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Steel/Welding
|
3/11/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/26/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Steel/Welding
|
3/29/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
3/29/2024
|
Partial Inspection
|
BRIAN KELLY
|
|
Excavation/Setback/Form/Re-Bar
|
4/18/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
4/22/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
5/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
5/22/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/23/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/24/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/28/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/28/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/29/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
5/29/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
5/30/2024
|
Approved
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
6/5/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
6/5/2024
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/6/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/7/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/7/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/11/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
6/12/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/13/2024
|
Approved
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
6/13/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/14/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/17/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/18/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/20/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/21/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/25/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/25/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/26/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
6/26/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/27/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
6/27/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
6/28/2024
|
Approved
|
ROBERT DAVIS
|
|
Piling/Pier/Caisson
|
6/28/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/1/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
7/1/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/2/2024
|
Approved
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
7/2/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/3/2024
|
Approved
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
7/3/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/8/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/9/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/9/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/10/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/10/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/11/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/11/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/12/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/12/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/15/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
7/15/2024
|
No Access for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
7/15/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
7/15/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
7/16/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/17/2024
|
Approved
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
7/17/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/18/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/18/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
7/19/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/19/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/23/2024
|
Approved
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
7/23/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/24/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/26/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
7/29/2024
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Shotcrete
|
7/30/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
7/30/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
8/1/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
8/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
8/12/2024
|
Partial Approval
|
DANIEL VARNUM
|
|
Deputy Shotcrete
|
8/13/2024
|
Conditional Approval
|
CAMERON CHABAN
|
|
Deputy Reinf. Concrete
|
8/28/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
8/28/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/30/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
9/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
9/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
9/12/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
9/13/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
9/25/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
9/25/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
9/25/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
10/17/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
10/18/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
10/23/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/24/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Green Building Rough
|
10/30/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
10/30/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
10/30/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
11/4/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
11/5/2024
|
Approved
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
11/5/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
11/6/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
11/14/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
11/15/2024
|
Approved
|
ROBERT DAVIS
|
|
Green Building Rough
|
11/15/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Insulation
|
11/15/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
11/15/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
11/15/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
11/18/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/19/2024
|
Conditional Approval
|
JEFFREY DURAN
|
|
Deputy Reinf. Concrete
|
11/20/2024
|
Conditional Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
11/22/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
11/22/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
11/22/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
12/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
12/4/2024
|
Corrections Issued
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
12/4/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
12/5/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
12/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
12/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
12/9/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
12/12/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
12/12/2024
|
Partial Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
12/12/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
12/13/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
12/16/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
12/26/2024
|
Partial Approval
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
12/30/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
12/30/2024
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
1/6/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
1/6/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
1/6/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/7/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Order to Comply
|
1/7/2025
|
Not Required
|
ROBERT DAVIS
|
|
Green Building Rough
|
1/9/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
1/9/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
1/9/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/15/2025
|
Approved
|
ROBERT DAVIS
|
|
Green Building Rough
|
1/15/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
1/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
1/15/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Shotcrete
|
1/16/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Pre-Inspection
|
1/16/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
1/22/2025
|
Approved
|
ROBERT DAVIS
|
|
Green Building Rough
|
1/23/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
1/23/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
1/23/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Green Building Rough
|
3/6/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
3/6/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
3/6/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
3/7/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Green Building Rough
|
3/13/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
3/13/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
3/13/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
3/14/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Deputy Reinf. Concrete
|
3/17/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/7/2025
|
Conditional Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/24/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/28/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/1/2025
|
Corrections Issued
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/6/2025
|
No Access for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/8/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
5/8/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/13/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/16/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
5/28/2025
|
Partial Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
6/3/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/5/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/9/2025
|
Partial Approval
|
DANIEL VARNUM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
6/18/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/23/2025
|
Corrections Issued
|
ROBERT DAVIS
|
|
Drywall Nailing
|
6/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
6/27/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
7/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/8/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
7/8/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
7/8/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
7/9/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
7/11/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
7/15/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/17/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
7/22/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/30/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
8/5/2025
|
Approved
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/6/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/14/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Insulation
|
8/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
8/20/2025
|
Partial Inspection
|
BRIAN KELLY
|
|
Wood Frame
|
8/26/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
9/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
9/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
9/11/2025
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Wood Frame
|
9/17/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
9/18/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
9/19/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
9/23/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/24/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
9/26/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Drywall Nailing
|
9/29/2025
|
Partial Approval
|
BRIAN KELLY
|
|
Drywall Nailing
|
9/30/2025
|
Corrections Issued
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
10/3/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Drywall Nailing
|
10/7/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
10/10/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
10/16/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
10/22/2025
|
Partial Inspection
|
BRIAN KELLY
|
|
Drywall Nailing
|
10/24/2025
|
Partial Inspection
|
BRIAN KELLY
|
|
Light Gage Steel Frame
|
10/31/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Insulation
|
11/4/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Interior/Exterior Lathing
|
11/7/2025
|
Partial Approval
|
BRIAN KELLY
|
|
Drywall Nailing
|
11/12/2025
|
Partial Approval
|
GREGORY POMISH
|
|
Special/Order Compliance
|
11/19/2025
|
Partial Inspection
|
BRIAN KELLY
|
|
Light Gage Steel Frame
|
11/26/2025
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Light Gage Steel Frame
|
12/1/2025
|
Partial Approval
|
BRIAN KELLY
|
|
Drywall Nailing
|
12/2/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
12/5/2025
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
12/17/2025
|
Partial Approval
|
BRIAN KELLY
|
|
Excavation/Setback/Form/Re-Bar
|
12/19/2025
|
Partial Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
1/5/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Light Gage Steel Frame
|
1/21/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Drywall Nailing
|
1/27/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Drywall Nailing
|
1/29/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
2/3/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Interior/Exterior Lathing
|
2/10/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Wood Frame
|
3/2/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
3/6/2026
|
Partial Inspection
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
3/18/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Drywall Nailing
|
4/7/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
4/16/2026
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Special/Order Compliance
|
4/20/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
4/29/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Excavation/Setback/Form/Re-Bar
|
5/1/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
6/3/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
6/23/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
6/24/2026
|
Corrections Issued
|
ROBERT DAVIS
|
|
Final
|
6/25/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Footing/Foundation/Slab
|
6/25/2026
|
Approved
|
ROBERT DAVIS
|
|
Green Building Final
|
6/25/2026
|
Partial Approval
|
ROBERT DAVIS
|
|
Green Building Rough
|
6/25/2026
|
Approved
|
ROBERT DAVIS
|
|
Reinforced Concrete Frame
|
6/25/2026
|
Approved
|
ROBERT DAVIS
|
|
Reinforced Masonry Frame
|
6/25/2026
|
Approved
|
ROBERT DAVIS
|
|
SGSOV-Seismic Gas S/O Valve
|
6/25/2026
|
SGSOV No Gas
|
ROBERT DAVIS
|
|
Smoke Detectors
|
6/25/2026
|
Not Ready for Inspection
|
ROBERT DAVIS
|
|
Verify Sprinkler Sign Off
|
6/25/2026
|
Approved
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
6/26/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
7/6/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
7/14/2026
|
Partial Inspection
|
ROBERT DAVIS
|
|
Special/Order Compliance
|
7/15/2026
|
Corrections Issued
|
ROBERT DAVIS
|