|
Pre-Inspection
|
4/4/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
4/19/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
6/16/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
6/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
6/21/2023
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
6/21/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Footing/Foundation/Slab
|
6/21/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
6/26/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
6/27/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/27/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
7/6/2023
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/6/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/13/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
7/26/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
7/28/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
7/28/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/3/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/3/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/4/2023
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/4/2023
|
Approved
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/4/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/7/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/7/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/8/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/8/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/9/2023
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/9/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
8/9/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/10/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/10/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/11/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
8/11/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
8/15/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
8/15/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
8/16/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
8/17/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
8/17/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Drilled-In Anchors
|
8/23/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
8/23/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
8/23/2023
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
8/23/2023
|
Partial Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
8/24/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/24/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
8/24/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
8/25/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
8/25/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Masonry
|
8/25/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/11/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
9/14/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Drilled-In Anchors
|
9/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
9/28/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/29/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
9/29/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/18/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
10/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
10/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Light Gage Steel Frame
|
10/30/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
11/9/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Structural Steel Frame
|
11/20/2023
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/1/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Wood Frame
|
12/1/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
12/4/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/4/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Wood Frame
|
12/4/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/12/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
12/15/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/15/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
12/15/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
12/19/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/20/2023
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
1/2/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/2/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
1/4/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
1/4/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/4/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
1/16/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/16/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Wood Construction
|
1/17/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/17/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/2/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/8/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
2/13/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/13/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
2/16/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/16/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/21/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
2/26/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Structural Steel Frame
|
2/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
2/28/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
2/28/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
3/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
3/11/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/11/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
3/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
3/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
3/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
3/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
3/28/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
3/28/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Drilled-In Anchors
|
4/2/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Insulation
|
4/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
4/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
4/3/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Wood Frame
|
4/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
4/8/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
4/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Masonry
|
4/9/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/9/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
4/9/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
4/10/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
4/11/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Drilled-In Anchors
|
4/18/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
4/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
4/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/23/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/23/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
4/25/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/25/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/25/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
4/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/1/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/6/2024
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Excavation/Setback/Form/Re-Bar
|
5/7/2024
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
5/8/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Drywall Nailing
|
5/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/9/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/9/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/9/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/10/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Insulation
|
5/10/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
5/10/2024
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
5/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
5/14/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
5/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
5/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
5/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
5/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
6/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
6/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/7/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
6/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
6/11/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/11/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
6/11/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
6/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
6/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
6/14/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
6/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
6/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
6/27/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Wood Frame
|
6/27/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Wood Frame
|
6/28/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
7/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
7/1/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
7/3/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/9/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
7/11/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
7/11/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
7/12/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
7/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
7/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
7/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
7/19/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Light Gage Steel Frame
|
7/23/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Drywall Nailing
|
7/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
7/26/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
7/30/2024
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Drywall Nailing
|
8/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
8/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
8/2/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
8/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
8/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
8/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
8/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
8/16/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
8/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
8/20/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Special/Order Compliance
|
8/23/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
9/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
9/27/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Drilled-In Anchors
|
9/30/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
9/30/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
9/30/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
9/30/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
10/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
10/2/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
10/3/2024
|
Not Ready for Inspection
|
JEROME BLACKWOOD
|
|
Light Gage Steel Frame
|
10/4/2024
|
Not Ready for Inspection
|
LUIS CCAMACHO
|
|
Deputy Reinf. Concrete
|
10/8/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
10/8/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
10/8/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
10/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
10/10/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Deputy Reinf. Masonry
|
10/10/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Excavation/Setback/Form/Re-Bar
|
10/10/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Deputy Pre-Stress Concrete
|
10/15/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
10/15/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
10/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Masonry Wall/Backfill
|
10/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/23/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
10/25/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
10/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
10/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
11/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
11/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/4/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/6/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/7/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/8/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
11/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
11/14/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
11/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
11/19/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
12/4/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
12/5/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
12/11/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
12/20/2024
|
Approved
|
LUIS CCAMACHO
|
|
Footing/Foundation/Slab
|
12/20/2024
|
Partial Approval
|
LUIS CCAMACHO
|
|
Excavation/Setback/Form/Re-Bar
|
12/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
1/23/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
2/3/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
2/4/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
2/19/2025
|
Partial Approval
|
TIMOTHY POWELL
|
|
Excavation/Setback/Form/Re-Bar
|
4/28/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Rough
|
4/28/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Reinforced Concrete Frame
|
4/28/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
4/28/2025
|
Not Ready for Inspection
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/29/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
4/29/2025
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Final
|
5/20/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
10/29/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Final
|
1/22/2026
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
1/22/2026
|
Approved
|
JEFFREY FULTON
|
|
Final
|
1/23/2026
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Rec and Parks Fee Memo
|
1/26/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
1/27/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
1/28/2026
|
Partial Approval
|
LARRY ARNICK
|
|
Special/Order Compliance
|
1/29/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
1/30/2026
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Special/Order Compliance
|
2/20/2026
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/23/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/24/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
2/26/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Final
|
2/27/2026
|
OK for TCO
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
2/27/2026
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Final
|
2/27/2026
|
Approved
|
DAVID BURKHEAD
|
|
Green Building Rough
|
2/27/2026
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
2/27/2026
|
Approved
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
2/27/2026
|
Approved
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
2/27/2026
|
SGSOV Approved
|
DAVID BURKHEAD
|
|
Smoke Detectors
|
2/27/2026
|
Approved
|
DAVID BURKHEAD
|
|
Final
|
3/24/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
7/28/2026
|
Approved
|
DAVID BURKHEAD
|