1214 N CAHUENGA BLVD 90038

Certificate Information: 1214 N CAHUENGA BLVD 90038

Application / Permit
22010-10000-04258
Plan Check / Job No.
B22LA17065
Group
Building
Type
Bldg-Addition
Sub-Type
Commercial
Primary Use
(13) Office
Work Description
EPLAN. NEW FOUR-STORY, TYPE II-B OFFICE BUILDING OVER ONE-LEVEL TYPE I-A SUBTERRANEAN PARKING GARAGE (BUILDING A) ADDITION TO EXISTING THREE-STORY BUILDING OVER ONE-LEVEL TYPE I-A BASEMENT (BUILDING B). BUILDING HAS ONE CONTINUOUS BASEMENT LEVEL
Permit Issued
Issued on 11/4/2024
Issuing Office
Metro
Current Status
Issued on 11/4/2024
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 9/16/2022 APPLICANT
Assigned to Plan Check Engineer 9/22/2022 GARO TELMI
Corrections Issued 10/12/2022 GARO TELMI
Quality Review Completed 10/20/2022 CHAD DOI
Applicant returned to address corrections 12/15/2022 GARO TELMI
Applicant returned to address corrections 1/9/2023 GARO TELMI
Applicant returned to address corrections 2/1/2023 GARO TELMI
Applicant returned to address corrections 12/12/2023 GARO TELMI
Applicant returned to address corrections 1/23/2024 GARO TELMI
Applicant returned to address corrections 3/5/2024 GARO TELMI
Applicant returned to address corrections 4/12/2024 GARO TELMI
Applicant returned to address corrections 4/29/2024 GARO TELMI
Applicant returned to address corrections 5/17/2024 GARO TELMI
Applicant returned to address corrections 5/22/2024 GARO TELMI
Applicant returned to address corrections 5/28/2024 GARO TELMI
Applicant returned to address corrections 8/22/2024 GARO TELMI
Applicant returned to address corrections 9/4/2024 GARO TELMI
Applicant returned to address corrections 9/5/2024 GARO TELMI
Applicant returned to address corrections 9/11/2024 GARO TELMI
Applicant returned to address corrections 9/16/2024 GARO TELMI
Applicant returned to address corrections 10/2/2024 GARO TELMI
Applicant returned to address corrections 10/3/2024 GARO TELMI
Plan Check Approved 11/1/2024 GARO TELMI
Issued 11/4/2024 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 11/9/2022 STEVE MELGAR
Address approval Cleared 11/28/2022 STEVE MELGAR
Bicycle Parking Cleared 12/16/2022 JEREMY CHOK
Trees in Parkway Cleared 3/22/2023 ADALBERTO VERA
Building over 36-ft Cleared 5/15/2023 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 5/15/2023 CALOSHA APPROVED
Green Code Cleared 8/10/2023 AARON COSTA
Hydrant and Access approval Cleared 9/1/2023 KURT CORRAL
Green Code Cleared 2/13/2024 AARON COSTA
Highway dedication Cleared 2/14/2024 TREVOR QUAN
Work Adjacent to Public Way Cleared 2/28/2024 LARRY LEE
Sewer availability Cleared 2/29/2024 CELINA MORENO
Driveway location Cleared 4/9/2024 TAIMOUR TANAVOLI
Internal circulation Cleared 4/9/2024 TAIMOUR TANAVOLI
Transportation Demand Ord. Cleared 4/9/2024 TAIMOUR TANAVOLI
Permit Cleared 5/15/2024 ALBERT TAM
ZA Case Cleared 7/18/2024 SPENCER WEJROWSKI
DAS Clearance Cleared 9/10/2024 Joe Vo
Low Impact Development Cleared 10/2/2024 ANDRES COVARRUBIAS
CPC Cleared 10/10/2024 RUBEN VASQUEZ
Frnt yard landscape/Water mgmt Cleared 10/10/2024 RUBEN VASQUEZ
Miscellaneous Cleared 10/10/2024 RUBEN VASQUEZ
Miscellaneous Cleared 10/10/2024 RUBEN VASQUEZ
Roof/Waste drainage to street Cleared 10/10/2024 LINDA MARGARET
Site Plan review Cleared 10/10/2024 RUBEN VASQUEZ
"D" conditions Cleared 10/17/2024 RUBEN VASQUEZ
"Q" conditions Cleared 10/17/2024 RUBEN VASQUEZ
"T" removal Cleared 10/17/2024 RUBEN VASQUEZ
CPC Cleared 10/17/2024 RUBEN VASQUEZ

Contact Information

Architect House,, James Douglas; Lic. No.: C15526 10125 WASHINGTON BLVD      CULVER CITY, CA 90232
Contractor Kprs Construction Services Inc; Lic. No.: 751130-B       ,
Contractor Kprs Construction Services Llc; Lic. No.: 751130-B       ,
Engineer Smith,, Chris Wayne; Lic. No.: S6106 11921 WINDWARD AVE      LOS ANGELES, CA 90066
Engineer Varela,, Gregorio; Lic. No.: C81201 1108 S ADAMS ST      GLENDALE, CA 91205

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 11/7/2024 Partial Inspection TIMOTHY POWELL
Footing/Foundation/Slab 11/13/2024 Partial Approval CHRISTOPHER BLACKWOOD
Green Building Rough 11/19/2024 Not Ready for Inspection TIMOTHY POWELL
Reinforced Concrete Frame 11/19/2024 Partial Approval TIMOTHY POWELL
Green Building Rough 12/2/2024 Not Ready for Inspection TIMOTHY POWELL
Reinforced Concrete Frame 12/2/2024 Partial Approval TIMOTHY POWELL
Footing/Foundation/Slab 12/11/2024 Partial Approval CHRISTOPHER BLACKWOOD
Footing/Foundation/Slab 12/18/2024 Partial Approval TIMOTHY POWELL
Green Building Rough 12/31/2024 Not Ready for Inspection CHRISTOPHER BLACKWOOD
Reinforced Concrete Frame 12/31/2024 Partial Approval CHRISTOPHER BLACKWOOD
Excavation/Setback/Form/Re-Bar 1/7/2025 Partial Approval RAMAZANALI ALMASI
Green Building Rough 1/23/2025 Partial Approval EDWIN GREGORYONA
Reinforced Concrete Frame 1/23/2025 Partial Approval EDWIN GREGORYONA
Excavation/Setback/Form/Re-Bar 1/29/2025 Partial Approval TIMOTHY POWELL
Footing/Foundation/Slab 2/24/2025 Approved TIMOTHY POWELL
Green Building Rough 3/3/2025 Not Ready for Inspection TIMOTHY POWELL
Reinforced Concrete Frame 3/3/2025 Partial Approval TIMOTHY POWELL
Green Building Rough 3/5/2025 Not Ready for Inspection TIMOTHY POWELL
Reinforced Masonry Frame 3/5/2025 Partial Approval TIMOTHY POWELL
Green Building Rough 3/10/2025 Not Ready for Inspection LUIS CCAMACHO
Reinforced Concrete Frame 3/10/2025 Partial Approval LUIS CCAMACHO
Piling/Pier/Caisson 3/20/2025 Partial Approval MARTIN TAVITIAN
Piling/Pier/Caisson 3/21/2025 Partial Approval MARTIN TAVITIAN
Pre-Inspection 4/2/2025 Not Ready for Inspection TIMOTHY POWELL
Green Building Rough 4/7/2025 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 4/7/2025 Partial Approval MARTIN TAVITIAN
Piling/Pier/Caisson 4/14/2025 Partial Approval TIMOTHY POWELL
Piling/Pier/Caisson 4/15/2025 Partial Approval TIMOTHY POWELL
Reinforced Concrete Frame 4/21/2025 Partial Approval MARTIN TAVITIAN
Reinforced Concrete Frame 5/13/2025 Partial Approval TIMOTHY POWELL
Reinforced Concrete Frame 5/20/2025 Partial Approval TIMOTHY POWELL
Piling/Pier/Caisson 5/23/2025 Not Ready for Inspection TIMOTHY POWELL
Reinforced Masonry Frame 5/29/2025 Partial Approval TIMOTHY POWELL
Reinforced Concrete Frame 6/10/2025 Partial Approval MARTIN TAVITIAN
Pre-Inspection 6/11/2025 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 6/16/2025 Not Ready for Inspection MARTIN TAVITIAN
Pre-Inspection 6/18/2025 Approved MARTIN TAVITIAN
Reinforced Concrete Frame 7/14/2025 Partial Approval MARTIN TAVITIAN
Reinforced Concrete Frame 7/23/2025 Partial Approval CHRISTOPHER BLACKWOOD
Deputy Reinf. Concrete 7/31/2025 Partial Approval CHRISTOPHER BLACKWOOD
Deputy Shotcrete 7/31/2025 Partial Approval CHRISTOPHER BLACKWOOD
Light Gage Steel Frame 7/31/2025 Corrections Issued CHRISTOPHER BLACKWOOD
Light Gage Steel Frame 8/12/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 8/26/2025 Partial Approval PAUL BAZERKANIAN
Light Gage Steel Frame 8/27/2025 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 8/27/2025 Not Ready for Inspection DAVID BURKHEAD
Pre-Inspection 8/29/2025 Partial Approval LUIS CCAMACHO
Pre-Inspection 9/3/2025 Partial Approval PAUL BAZERKANIAN
Reinforced Concrete Frame 9/8/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 9/11/2025 Partial Approval LUIS CCAMACHO
Light Gage Steel Frame 9/19/2025 Partial Approval MARTIN TAVITIAN
Light Gage Steel Frame 9/25/2025 Partial Approval MARTIN TAVITIAN
Drywall Nailing 9/29/2025 Not Ready for Inspection LUIS CCAMACHO
Reinforced Concrete Frame 9/29/2025 Partial Approval LUIS CCAMACHO
Reinforced Masonry Frame 10/1/2025 Partial Approval MARTIN TAVITIAN
Insulation 10/6/2025 Partial Approval MARTIN TAVITIAN
Excavation/Setback/Form/Re-Bar 10/15/2025 Partial Approval MARTIN TAVITIAN
Insulation 10/15/2025 Partial Approval MARTIN TAVITIAN
Reinforced Concrete Frame 11/7/2025 Partial Approval MARTIN TAVITIAN
Deputy Drilled-In Anchors 1/23/2026 Conditional Approval JEFFREY FULTON
Deputy Reinf. Concrete 1/23/2026 Conditional Approval JEFFREY FULTON
Reinforced Concrete Frame 1/28/2026 Partial Approval DAVID BURKHEAD