Excavation/Setback/Form/Re-Bar
|
8/2/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/3/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/8/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
8/9/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
8/10/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/10/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
8/10/2023
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/11/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Steel/Welding
|
8/11/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
8/11/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/14/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
8/17/2023
|
Partial Approval
|
NICK DANERI
|
|
METHANE-Rough
|
8/23/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
8/29/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
8/30/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
8/31/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
9/1/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
9/7/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
9/8/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
9/11/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
9/12/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
9/13/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
9/14/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
9/18/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
9/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
9/20/2023
|
Partial Approval
|
GREGORY POMISH
|
|
METHANE-Rough
|
9/20/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/21/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
9/21/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
9/22/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
9/25/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
9/26/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
9/28/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
9/29/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
10/2/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
10/3/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
10/4/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
10/5/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
10/6/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
10/10/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Masonry
|
10/10/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/10/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
10/10/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
10/10/2023
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
10/11/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
10/11/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
10/11/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/12/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
10/12/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
10/12/2023
|
Partial Approval
|
GREGORY POMISH
|
|
METHANE-Rough
|
10/12/2023
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Pre-Inspection
|
10/12/2023
|
Partial Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
10/13/2023
|
Conditional Approval
|
NICK DANERI
|
|
Green Building Rough
|
10/13/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Masonry Wall/Backfill
|
10/13/2023
|
Partial Approval
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
10/13/2023
|
Partial Approval
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
10/13/2023
|
Not Ready for Inspection
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
10/16/2023
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Masonry
|
10/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
10/18/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
10/19/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
10/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
10/20/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
10/23/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
10/24/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
10/26/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
10/27/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
10/31/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Masonry
|
11/1/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
11/2/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
11/3/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Masonry Wall/Backfill
|
11/3/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
11/7/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
11/8/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
11/9/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
11/13/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
11/14/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
11/20/2023
|
Partial Approval
|
GREGORY POMISH
|
|
METHANE-Barrier
|
11/20/2023
|
Partial Approval
|
GREGORY POMISH
|
|
METHANE-Subgrade
|
11/20/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/21/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
11/28/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Excavation/Setback/Form/Re-Bar
|
11/28/2023
|
Partial Approval
|
GREGORY POMISH
|
|
METHANE-Barrier
|
11/28/2023
|
Approved
|
GREGORY POMISH
|
|
METHANE-Subgrade
|
11/28/2023
|
Approved
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
11/29/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
12/4/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
12/5/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
12/7/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
12/8/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
12/12/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
12/14/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/14/2023
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
12/18/2023
|
Conditional Approval
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
12/18/2023
|
Partial Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/20/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
12/26/2023
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
1/2/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
1/3/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
1/4/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
1/5/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
1/8/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
1/9/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
1/10/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
1/11/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/11/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
1/11/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
1/11/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Reinf. Concrete
|
1/12/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
1/12/2024
|
Conditional Approval
|
GREGORY POMISH
|
|
Wood Frame
|
1/12/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/17/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Wood Frame
|
1/17/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
1/19/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/19/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Steel/Welding
|
1/23/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Steel/Welding
|
1/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/29/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
2/2/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/22/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
2/22/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
3/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/1/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
3/1/2024
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
3/7/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
3/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Light Gage Steel Frame
|
3/8/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/12/2024
|
Partial Approval
|
JAMES POWERS
|
|
Drywall Nailing
|
3/13/2024
|
Partial Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/15/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
3/19/2024
|
Conditional Approval
|
NICK DANERI
|
|
Wood Frame
|
3/19/2024
|
Partial Inspection
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/26/2024
|
Partial Approval
|
NICK DANERI
|
|
Wood Frame
|
3/26/2024
|
Corrections Issued
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
4/2/2024
|
Partial Approval
|
JAMES POWERS
|
|
Wood Frame
|
4/2/2024
|
Not Ready for Inspection
|
JAMES POWERS
|
|
Insulation
|
4/4/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
4/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/5/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Insulation
|
4/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
4/9/2024
|
Partial Approval
|
NICK DANERI
|
|
Insulation
|
4/9/2024
|
Partial Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/25/2024
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
4/25/2024
|
Corrections Issued
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/26/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
METHANE-Rough
|
4/26/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/29/2024
|
Partial Approval
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
4/29/2024
|
Partial Approval
|
NICK DANERI
|
|
Drywall Nailing
|
5/10/2024
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Drywall Nailing
|
5/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Excavation/Setback/Form/Re-Bar
|
5/13/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/13/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Drywall Nailing
|
5/15/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Interior/Exterior Lathing
|
5/21/2024
|
Partial Approval
|
NICK DANERI
|
|
T-Bar Ceiling
|
5/21/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Interior/Exterior Lathing
|
5/29/2024
|
Approved
|
NICK DANERI
|
|
T-Bar Ceiling
|
5/29/2024
|
Corrections Issued
|
NICK DANERI
|
|
Special/Order Compliance
|
6/7/2024
|
Corrections Issued
|
NICK DANERI
|
|
Special/Order Compliance
|
6/28/2024
|
Corrections Issued
|
NICK DANERI
|
|
T-Bar Ceiling
|
7/3/2024
|
Not Ready for Inspection
|
RAMAZANALI ALMASI
|
|
Special/Order Compliance
|
7/11/2024
|
Partial Approval
|
NICK DANERI
|
|
T-Bar Ceiling
|
7/11/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Drywall Nailing
|
7/15/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
7/24/2024
|
Partial Approval
|
NICK DANERI
|
|
T-Bar Ceiling
|
7/24/2024
|
Partial Inspection
|
NICK DANERI
|
|
Special/Order Compliance
|
7/26/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/31/2024
|
Conditional Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/2/2024
|
Partial Inspection
|
DANIEL VARNUM
|
|
Drywall Nailing
|
8/6/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Footing/Foundation/Slab
|
8/6/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Special/Order Compliance
|
8/14/2024
|
Partial Inspection
|
NICK DANERI
|
|
T-Bar Ceiling
|
8/14/2024
|
Partial Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
8/19/2024
|
Partial Inspection
|
NICK DANERI
|
|
Special/Order Compliance
|
8/26/2024
|
Partial Approval
|
NICK DANERI
|
|
Light Gage Steel Frame
|
8/28/2024
|
Partial Approval
|
NICK DANERI
|
|
Final
|
10/7/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Footing/Foundation/Slab
|
10/7/2024
|
Approved
|
NICK DANERI
|
|
Green Building Final
|
10/7/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Green Building Rough
|
10/7/2024
|
Approved
|
NICK DANERI
|
|
METHANE-Final
|
10/7/2024
|
Approved
|
NICK DANERI
|
|
METHANE-Rough
|
10/7/2024
|
Approved
|
NICK DANERI
|
|
Reinforced Masonry Frame
|
10/7/2024
|
Approved
|
NICK DANERI
|
|
SGSOV-Seismic Gas S/O Valve
|
10/7/2024
|
SGSOV Approved
|
NICK DANERI
|
|
Smoke Detectors
|
10/7/2024
|
Approved
|
NICK DANERI
|
|
Verify Sprinkler Sign Off
|
10/7/2024
|
Approved
|
NICK DANERI
|
|
Final
|
10/11/2024
|
Partial Inspection
|
NICK DANERI
|
|
Green Building Final
|
10/11/2024
|
Not Ready for Inspection
|
NICK DANERI
|
|
Final
|
11/1/2024
|
OK to Issue CofO
|
NICK DANERI
|
|
Green Building Final
|
11/1/2024
|
Approved
|
NICK DANERI
|