Deputy Reinf. Concrete
|
9/30/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/7/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
10/8/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/9/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/11/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/16/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/21/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
10/25/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/1/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/4/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/4/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
11/6/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/6/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
11/22/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/10/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/17/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
12/18/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/10/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/16/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/21/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/23/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
1/27/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/5/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
2/25/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
4/1/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/1/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
4/4/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/4/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
4/16/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/16/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
4/17/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
5/8/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
5/8/2025
|
Conditional Approval
|
NICK DANERI
|
|
Special/Order Compliance
|
5/8/2025
|
Partial Inspection
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
5/14/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Reinf. Concrete
|
5/14/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Steel/Welding
|
5/14/2025
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Drilled-In Anchors
|
6/2/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/2/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/2/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/3/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/3/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/3/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/4/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/4/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/4/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/5/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/5/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/5/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/6/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/6/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/6/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/9/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/9/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/9/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/10/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/10/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/10/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/11/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/11/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/11/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/12/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/12/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/12/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/13/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/13/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/13/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/16/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/16/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/16/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/17/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/17/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/17/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/18/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/18/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Steel/Welding
|
6/18/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Drilled-In Anchors
|
6/20/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
6/20/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
6/20/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
6/23/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
6/23/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
6/23/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
6/24/2025
|
Conditional Approval
|
JOEY BUCHANAN
|
|
Deputy Reinf. Concrete
|
6/25/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
6/25/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
6/30/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
6/30/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
7/17/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/17/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
7/17/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
7/18/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
7/18/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
7/18/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Light Gage Steel Frame
|
7/18/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Pre-Inspection
|
7/18/2025
|
Partial Inspection
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
8/18/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
8/18/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
8/18/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
9/3/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/3/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
9/12/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/12/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
9/12/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Reinforced Concrete Frame
|
9/12/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Verify Sprinkler Sign Off
|
9/12/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
9/29/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
9/29/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
10/7/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
10/7/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/7/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
10/14/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
10/14/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/14/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
10/15/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
10/15/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
10/15/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
11/3/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
11/3/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
11/5/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
11/5/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
11/5/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
11/5/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
11/7/2025
|
Conditional Approval
|
SCOTT SOBEL
|
|
Deputy Fireproofing
|
11/7/2025
|
Conditional Approval
|
SCOTT SOBEL
|
|
Deputy Reinf. Concrete
|
11/7/2025
|
Conditional Approval
|
SCOTT SOBEL
|
|
Deputy Steel/Welding
|
11/7/2025
|
Conditional Approval
|
SCOTT SOBEL
|
|
Deputy Drilled-In Anchors
|
11/10/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
11/10/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
11/10/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
11/10/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
11/19/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
11/19/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
11/19/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Drilled-In Anchors
|
11/21/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
11/21/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
11/21/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
11/21/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
12/1/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
12/1/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/1/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
12/3/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
12/3/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/3/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
12/5/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
12/5/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/5/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
12/9/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
12/9/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/9/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
12/11/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
12/11/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/11/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
12/30/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
12/30/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
12/30/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
1/5/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
1/5/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
1/5/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
1/13/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
1/13/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
1/16/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
1/16/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
1/16/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
1/20/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
1/20/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
1/20/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
1/21/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
1/21/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
1/21/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
1/27/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
1/27/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
1/27/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Fireproofing
|
1/28/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Reinf. Concrete
|
1/28/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
1/28/2026
|
Conditional Approval
|
LARRY ARNICK
|
|
Deputy Steel/Welding
|
2/18/2026
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Deputy Fireproofing
|
3/2/2026
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Steel/Welding
|
3/2/2026
|
Partial Approval
|
JAMES POWERS
|