Deputy Grading
|
3/20/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
3/20/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
3/20/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
3/21/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Piling/Pier/Caisson
|
3/21/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Pre-Inspection
|
3/21/2024
|
Approved
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
3/27/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Piling/Pier/Caisson
|
3/27/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/5/2024
|
Conditional Approval
|
NICK DANERI
|
|
Deputy Shotcrete
|
4/5/2024
|
Conditional Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/5/2024
|
Partial Approval
|
NICK DANERI
|
|
Excavation/Setback/Form/Re-Bar
|
4/8/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
4/17/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
4/17/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Piling/Pier/Caisson
|
4/17/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
6/6/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Grading
|
6/7/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Piling/Pier/Caisson
|
6/11/2024
|
Partial Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Grading
|
6/12/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Reinf. Concrete
|
7/2/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/2/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/9/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/9/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/11/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
7/11/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/17/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/17/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/18/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/18/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/22/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
7/22/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/22/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/22/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/24/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
7/24/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/24/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Verify Sprinkler Sign Off
|
7/24/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/25/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/25/2024
|
Corrections Issued
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/30/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/30/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
7/31/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
7/31/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
8/1/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Reinforced Concrete Frame
|
8/1/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
9/20/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
9/20/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Green Building Rough
|
9/27/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
9/27/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Verify Sprinkler Sign Off
|
9/27/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
10/22/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
10/24/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Footing/Foundation/Slab
|
10/24/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
10/25/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Green Building Rough
|
10/25/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Reinforced Concrete Frame
|
10/25/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Verify Sprinkler Sign Off
|
10/25/2024
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Deputy Grading
|
11/5/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
11/5/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Deputy Grading
|
11/6/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
11/6/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
11/6/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Deputy Grading
|
11/7/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
11/7/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
11/7/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/19/2024
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
11/20/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
11/20/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Grading
|
11/26/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
11/26/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Grading
|
12/2/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Footing/Foundation/Slab
|
12/3/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Grading
|
12/4/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Grading
|
12/5/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Grading
|
12/6/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/6/2024
|
Corrections Issued
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/9/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Grading
|
12/10/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Grading
|
12/10/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Drilled-In Anchors
|
12/11/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
12/11/2024
|
Conditional Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
12/11/2024
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Grading
|
12/12/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Grading
|
12/16/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Grading
|
12/17/2024
|
Conditional Approval
|
RUSSELL BONVOULOIR
|
|
Deputy Grading
|
12/18/2024
|
Approved
|
JONATHAN HOM
|
|
Deputy Grading
|
12/19/2024
|
Approved
|
JONATHAN HOM
|
|
Deputy Grading
|
12/23/2024
|
Approved
|
JONATHAN HOM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
12/23/2024
|
No Access for Inspection
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/24/2024
|
Approved
|
JONATHAN HOM
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/3/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
2/12/2025
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Deputy Drilled-In Anchors
|
2/19/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
2/19/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
2/19/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
2/19/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Drilled-In Anchors
|
2/27/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
2/27/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
2/27/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
2/27/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
2/27/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/4/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/13/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Footing/Foundation/Slab
|
3/14/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
3/24/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
3/25/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
3/25/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
3/25/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
3/25/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
3/27/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
3/27/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
3/27/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Footing/Foundation/Slab
|
3/27/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
4/2/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
4/3/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
4/3/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Final
|
4/3/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Footing/Foundation/Slab
|
4/3/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Green Building Final
|
4/3/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Green Building Rough
|
4/3/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
4/3/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Reinforced Masonry Frame
|
4/3/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
SGSOV-Seismic Gas S/O Valve
|
4/3/2025
|
SGSOV Not Ready
|
RAFAEL CORTES
|
|
Smoke Detectors
|
4/3/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Verify Sprinkler Sign Off
|
4/3/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
4/4/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
4/4/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/4/2025
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Masonry Wall/Backfill
|
4/4/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/11/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Drilled-In Anchors
|
4/15/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
4/15/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Structural Steel Frame
|
4/15/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Masonry
|
4/18/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/18/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
4/25/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/2/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/7/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/12/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Deputy Drilled-In Anchors
|
5/13/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
5/13/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/13/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/14/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Pre-Inspection
|
5/15/2025
|
Approved
|
RAFAEL CORTES
|
|
Insulation
|
5/16/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2025
|
Partial Inspection
|
RAFAEL CORTES
|
|
Drywall Nailing
|
5/23/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
5/27/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/27/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/29/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/2/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/3/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Insulation
|
6/5/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Drywall Nailing
|
6/6/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
6/6/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
6/9/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
6/11/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/11/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Insulation
|
6/18/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/24/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Insulation
|
6/24/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
6/24/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Drilled-In Anchors
|
6/25/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
6/25/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Wood Construction
|
6/25/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
6/25/2025
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
6/26/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Insulation
|
6/26/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Steel/Welding
|
6/27/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Deputy Wood Construction
|
6/27/2025
|
Conditional Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
6/27/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
6/30/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Steel/Welding
|
7/1/2025
|
No Result Entered
|
NICK DANERI
|
|
Insulation
|
7/1/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
7/2/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Insulation
|
7/2/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Insulation
|
7/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
7/3/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
7/7/2025
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Insulation
|
7/7/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Wood Construction
|
7/8/2025
|
Conditional Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/8/2025
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
7/8/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/10/2025
|
Partial Approval
|
LARRY ARNICK
|
|
Insulation
|
7/11/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/14/2025
|
Not Ready for Inspection
|
JOEY BUCHANAN
|
|
Insulation
|
7/14/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Interior/Exterior Lathing
|
7/14/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Drywall Nailing
|
7/15/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/15/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
7/15/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
7/17/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
7/17/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
7/17/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
7/21/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/23/2025
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Insulation
|
7/23/2025
|
Not Ready for Inspection
|
JEROME BLACKWOOD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/24/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Insulation
|
7/24/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Wood Frame
|
7/28/2025
|
Not Ready for Inspection
|
EDWIN GREGORYONA
|
|
Deputy Wood Construction
|
7/29/2025
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
7/29/2025
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Insulation
|
7/29/2025
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Wood Frame
|
7/29/2025
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
7/30/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/30/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
7/30/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
7/31/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
7/31/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/4/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Insulation
|
8/4/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/5/2025
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Insulation
|
8/5/2025
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/7/2025
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/8/2025
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
8/8/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/11/2025
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
8/11/2025
|
Partial Approval
|
JOEY BUCHANAN
|
|
Insulation
|
8/12/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
8/15/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
8/19/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
8/19/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Insulation
|
8/20/2025
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
8/22/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Insulation
|
8/25/2025
|
Partial Approval
|
ALFREDO LOPEZ
|
|
Drywall Nailing
|
8/26/2025
|
Partial Approval
|
JEROME BLACKWOOD
|
|
Drywall Nailing
|
8/27/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Insulation
|
8/27/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
8/28/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
8/28/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/2/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
9/5/2025
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Insulation
|
9/5/2025
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/5/2025
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Light Gage Steel Frame
|
9/8/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
9/11/2025
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/15/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Wood Frame
|
9/15/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Drywall Nailing
|
9/17/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
9/17/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Insulation
|
9/19/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
9/19/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Insulation
|
9/22/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
9/26/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Insulation
|
9/26/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
9/26/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Insulation
|
10/1/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
10/2/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Insulation
|
10/3/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Interior/Exterior Lathing
|
10/3/2025
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Wood Frame
|
10/3/2025
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
10/6/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/6/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
10/6/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Drilled-In Anchors
|
10/10/2025
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/10/2025
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Footing/Foundation/Slab
|
10/10/2025
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Interior/Exterior Lathing
|
10/10/2025
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Drywall Nailing
|
10/16/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Interior/Exterior Lathing
|
10/16/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Interior/Exterior Lathing
|
10/17/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Drywall Nailing
|
10/20/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
10/20/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/22/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
10/22/2025
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
10/23/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
10/27/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/3/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
11/5/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/5/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Wood Frame
|
11/18/2025
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Drywall Nailing
|
11/21/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Interior/Exterior Lathing
|
11/24/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
11/25/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Drywall Nailing
|
12/3/2025
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
12/5/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
12/19/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
12/23/2025
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/6/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/12/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
1/13/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
1/23/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
1/26/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Insulation
|
1/28/2026
|
Not Ready for Inspection
|
RONALD JIMENEZ
|
|
Special/Order Compliance
|
1/28/2026
|
Approved
|
RONALD JIMENEZ
|
|
Insulation
|
2/2/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/17/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Drywall Nailing
|
2/20/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Floor/Roof Diaphrgm/Shear Wall
|
2/20/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
2/24/2026
|
Partial Inspection
|
RAFAEL CORTES
|
|
Footing/Foundation/Slab
|
2/27/2026
|
Approved
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
3/9/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
3/13/2026
|
Conditional Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
3/13/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Interior/Exterior Lathing
|
3/18/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
3/24/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Special/Order Compliance
|
3/25/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Light Gage Steel Frame
|
3/27/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
4/3/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Reinforced Concrete Frame
|
4/3/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
4/14/2026
|
Not Ready for Inspection
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
4/14/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Deputy Reinf. Concrete
|
4/15/2026
|
Conditional Approval
|
RONALD JIMENEZ
|
|
Drywall Nailing
|
4/15/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Light Gage Steel Frame
|
4/15/2026
|
Partial Approval
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
4/22/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
5/4/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Interior/Exterior Lathing
|
5/11/2026
|
Partial Approval
|
RAFAEL CORTES
|
|
Excavation/Setback/Form/Re-Bar
|
5/14/2026
|
Partial Approval
|
MARTIN TAVITIAN
|
|
Green Building Rough
|
5/15/2026
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Reinforced Concrete Frame
|
5/15/2026
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Verify Sprinkler Sign Off
|
5/15/2026
|
No Access for Inspection
|
RAFAEL CORTES
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/22/2026
|
Approved
|
RONALD JIMENEZ
|
|
Excavation/Setback/Form/Re-Bar
|
6/3/2026
|
Partial Approval
|
RAFAEL CORTES
|