714 S GRAND VIEW ST 1-100 90057

Certificate Information: 714 S GRAND VIEW ST 1-100 90057

Application / Permit
22010-10000-04015
Plan Check / Job No.
B22LA15994
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
NEW 5 STORY TYPE IIIA 100% 100 UNITS AFFORDABLE HOUSING APARTMENT OVER 1 LEVEL TYPE IA SUBTERRANEAN PARKING PER DIR-2018-4135-TOC-SPR, TIER 3 TOC WITH ADDITIONAL INCENTIVES
Permit Issued
Issued on 11/13/2023
Issuing Office
Metro
Current Status
Issued on 11/13/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 8/19/2022 APPLICANT
Assigned to Plan Check Engineer 8/25/2022 STARR CHEN
Corrections Issued 8/28/2022 STARR CHEN
Quality Review Completed 8/30/2022 EUGENE BARBEAU
Applicant returned to address corrections 10/4/2022 STARR CHEN
Plan Check Approved 11/13/2023 STARR CHEN
Issued 11/13/2023 APPLICANT

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 2/24/2023 WALLIE JONG
Address approval Cleared 3/9/2023 WALLIE JONG
Highway dedication Cleared 3/9/2023 WALLIE JONG
Historic Resource Verification Cleared 3/21/2023 MAX LODER
Miscellaneous Cleared 3/21/2023 DANIEL CORONADO
Miscellaneous Cleared 3/21/2023 DANIEL CORONADO
Site Plan review Cleared 3/21/2023 DANIEL CORONADO
Building over 36-ft Cleared 6/21/2023 CALOSHA APPROVED
Trees in Parkway Cleared 7/3/2023 ADALBERTO VERA
Hydrant and Access approval Cleared 7/11/2023 KURT CORRAL
Public Housing Cleared 7/31/2023 JORGE ALCANTAR
Redevelopment Project Area Cleared 8/1/2023 CARTER HOWE
Fire Marshal Fire Life Safety Cleared 9/5/2023 RONILO MULAWIN
Green Code Cleared 9/21/2023 AARON COSTA
Sewer availability Cleared 10/17/2023 WALLIE JONG
DAS Clearance Cleared 10/18/2023 STARR CHEN
Density Bonus 12.22.A.31 Cleared 11/2/2023 RICHARD TRUONG
SB8 RUD Cleared 11/2/2023 RICHARD TRUONG
Frnt yard landscape/Water mgmt Cleared 11/3/2023 DANIEL CORONADO
Miscellaneous Cleared 11/3/2023 DANIEL CORONADO
Opn space landscape/Water mgmt Cleared 11/3/2023 DANIEL CORONADO
Low Impact Development Cleared 11/13/2023 AMMAR ELTAWIL
Permit Cleared 11/13/2023 BIJAN ZADEH
Roof/Waste drainage to street Cleared 11/13/2023 BIJAN ZADEH

Contact Information

Architect Flores,, Raeven I; Lic. No.: C32188 234 SOUTH CIRCLE DRIVE      SAN GABRIEL, CA 91776
Contractor United Building Company Inc; Lic. No.: 1034972-B 250 N. HARBOR DRIVE   SUITE 311    REDONDO BEACH, CA 90277
Engineer Berliner,, Neal David; Lic. No.: GE2576 4913 MONUMENT ST      SIMI VALLEY, CA 93063
Engineer Eddington,, Ronald Bruce; Lic. No.: S3376 6001 HELVA LANE      CARMICHAEL, CA 95608
Engineer Holland,, Rachel M; Lic. No.: C73183 2659 COREY PLACE      SAN RAMON, CA 94583
Engineer Khoury,, Samir Michael; Lic. No.: C30567 5049 E LOMITA AVE      ORANGE, CA 92869
Engineer Zangoli,, Fabio; Lic. No.: S6191 13245 FIJI WY UNIT J      MARINA DEL REY, CA 90292
Landscape Architect Slawson,, Kevin; Lic. No.: LA6118 119 SPANISH LACE      IRVINE, CA 92620

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 3/20/2024 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 3/20/2024 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 3/20/2024 Partial Approval RAFAEL ESPINOZA
Deputy Grading 3/21/2024 Conditional Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 3/21/2024 Partial Approval RAFAEL ESPINOZA
Pre-Inspection 3/21/2024 Approved RAFAEL ESPINOZA
Deputy Grading 3/27/2024 Conditional Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 3/27/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/5/2024 Conditional Approval NICK DANERI
Deputy Shotcrete 4/5/2024 Conditional Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/5/2024 Partial Approval NICK DANERI
Excavation/Setback/Form/Re-Bar 4/8/2024 Partial Inspection RAFAEL ESPINOZA
Deputy Grading 4/17/2024 Conditional Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 4/17/2024 Conditional Approval RAFAEL ESPINOZA
Piling/Pier/Caisson 4/17/2024 Partial Approval RAFAEL ESPINOZA
Deputy Grading 6/6/2024 Conditional Approval RUSSELL BONVOULOIR
Deputy Grading 6/7/2024 Conditional Approval RUSSELL BONVOULOIR
Piling/Pier/Caisson 6/11/2024 Partial Inspection RAFAEL ESPINOZA
Deputy Grading 6/12/2024 Conditional Approval RUSSELL BONVOULOIR
Deputy Reinf. Concrete 7/2/2024 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 7/2/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/9/2024 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 7/9/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/11/2024 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 7/11/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/17/2024 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/17/2024 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/18/2024 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/18/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/22/2024 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 7/22/2024 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 7/22/2024 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/22/2024 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/24/2024 Conditional Approval RAFAEL ESPINOZA
Green Building Rough 7/24/2024 Not Ready for Inspection RAFAEL ESPINOZA
Reinforced Concrete Frame 7/24/2024 Partial Approval RAFAEL ESPINOZA
Verify Sprinkler Sign Off 7/24/2024 Not Ready for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/25/2024 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/25/2024 Corrections Issued RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/30/2024 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/30/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 7/31/2024 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 7/31/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 8/1/2024 Conditional Approval RAFAEL ESPINOZA
Reinforced Concrete Frame 8/1/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 9/20/2024 Conditional Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 9/20/2024 Partial Approval RAFAEL ESPINOZA
Green Building Rough 9/27/2024 Not Ready for Inspection RAFAEL CORTES
Reinforced Concrete Frame 9/27/2024 Partial Approval RAFAEL CORTES
Verify Sprinkler Sign Off 9/27/2024 Not Ready for Inspection RAFAEL CORTES
Deputy Reinf. Concrete 10/22/2024 Conditional Approval RAFAEL CORTES
Deputy Reinf. Concrete 10/24/2024 Conditional Approval RAFAEL CORTES
Footing/Foundation/Slab 10/24/2024 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 10/25/2024 Partial Approval EDWIN GREGORYONA
Green Building Rough 10/25/2024 Not Ready for Inspection EDWIN GREGORYONA
Reinforced Concrete Frame 10/25/2024 Partial Approval EDWIN GREGORYONA
Verify Sprinkler Sign Off 10/25/2024 Not Ready for Inspection EDWIN GREGORYONA
Deputy Grading 11/5/2024 Conditional Approval RAFAEL CORTES
Light Gage Steel Frame 11/5/2024 Not Ready for Inspection RAFAEL CORTES
Deputy Grading 11/6/2024 Conditional Approval RAFAEL CORTES
Deputy Reinf. Concrete 11/6/2024 Conditional Approval RAFAEL CORTES
Light Gage Steel Frame 11/6/2024 Not Ready for Inspection RAFAEL CORTES
Deputy Grading 11/7/2024 Conditional Approval RAFAEL CORTES
Deputy Reinf. Concrete 11/7/2024 Conditional Approval RAFAEL CORTES
Light Gage Steel Frame 11/7/2024 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 11/19/2024 Not Ready for Inspection RAFAEL CORTES
Deputy Reinf. Concrete 11/20/2024 Conditional Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 11/20/2024 Partial Approval RAFAEL CORTES
Deputy Grading 11/26/2024 Conditional Approval RAFAEL CORTES
Light Gage Steel Frame 11/26/2024 Partial Approval RAFAEL CORTES
Deputy Grading 12/2/2024 Conditional Approval RAFAEL CORTES
Footing/Foundation/Slab 12/3/2024 Partial Approval RAFAEL CORTES
Deputy Grading 12/4/2024 Conditional Approval RUSSELL BONVOULOIR
Deputy Grading 12/5/2024 Conditional Approval RUSSELL BONVOULOIR
Deputy Grading 12/6/2024 Conditional Approval RUSSELL BONVOULOIR
Floor/Roof Diaphrgm/Shear Wall 12/6/2024 Corrections Issued RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 12/9/2024 Partial Approval RAFAEL CORTES
Deputy Grading 12/10/2024 Conditional Approval RAFAEL CORTES
Deputy Grading 12/10/2024 Conditional Approval RUSSELL BONVOULOIR
Deputy Drilled-In Anchors 12/11/2024 Conditional Approval RAFAEL CORTES
Deputy Reinf. Concrete 12/11/2024 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 12/11/2024 Partial Approval RAFAEL CORTES
Deputy Grading 12/12/2024 Conditional Approval RUSSELL BONVOULOIR
Deputy Grading 12/16/2024 Conditional Approval RUSSELL BONVOULOIR
Deputy Grading 12/17/2024 Conditional Approval RUSSELL BONVOULOIR
Deputy Grading 12/18/2024 Approved JONATHAN HOM
Deputy Grading 12/19/2024 Approved JONATHAN HOM
Deputy Grading 12/23/2024 Approved JONATHAN HOM
Floor/Roof Diaphrgm/Shear Wall 12/23/2024 No Access for Inspection RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/24/2024 Approved JONATHAN HOM
Floor/Roof Diaphrgm/Shear Wall 2/3/2025 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 2/12/2025 No Access for Inspection RAFAEL CORTES
Deputy Drilled-In Anchors 2/19/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Masonry 2/19/2025 Conditional Approval RAFAEL CORTES
Deputy Steel/Welding 2/19/2025 Conditional Approval RAFAEL CORTES
Light Gage Steel Frame 2/19/2025 Partial Approval RAFAEL CORTES
Deputy Drilled-In Anchors 2/27/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Concrete 2/27/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Masonry 2/27/2025 Conditional Approval RAFAEL CORTES
Deputy Steel/Welding 2/27/2025 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 2/27/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 3/4/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 3/13/2025 Partial Approval RAFAEL CORTES
Footing/Foundation/Slab 3/14/2025 Partial Approval RAFAEL CORTES
Deputy Steel/Welding 3/24/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Concrete 3/25/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Masonry 3/25/2025 Conditional Approval RAFAEL CORTES
Deputy Steel/Welding 3/25/2025 Conditional Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 3/25/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 3/27/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Masonry 3/27/2025 Conditional Approval RAFAEL CORTES
Deputy Steel/Welding 3/27/2025 Conditional Approval RAFAEL CORTES
Footing/Foundation/Slab 3/27/2025 Not Ready for Inspection RAFAEL CORTES
Light Gage Steel Frame 4/2/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 4/3/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Masonry 4/3/2025 Conditional Approval RAFAEL CORTES
Final 4/3/2025 Not Ready for Inspection RAFAEL CORTES
Footing/Foundation/Slab 4/3/2025 Partial Approval RAFAEL CORTES
Green Building Final 4/3/2025 Not Ready for Inspection RAFAEL CORTES
Green Building Rough 4/3/2025 Not Ready for Inspection RAFAEL CORTES
Reinforced Concrete Frame 4/3/2025 Partial Approval RAFAEL CORTES
Reinforced Masonry Frame 4/3/2025 Partial Approval RAFAEL CORTES
SGSOV-Seismic Gas S/O Valve 4/3/2025 SGSOV Not Ready RAFAEL CORTES
Smoke Detectors 4/3/2025 Not Ready for Inspection RAFAEL CORTES
Verify Sprinkler Sign Off 4/3/2025 Not Ready for Inspection RAFAEL CORTES
Deputy Reinf. Concrete 4/4/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Masonry 4/4/2025 Conditional Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 4/4/2025 No Access for Inspection RAFAEL CORTES
Masonry Wall/Backfill 4/4/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 4/11/2025 Partial Approval RAFAEL CORTES
Deputy Drilled-In Anchors 4/15/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Masonry 4/15/2025 Conditional Approval RAFAEL CORTES
Structural Steel Frame 4/15/2025 Partial Approval RAFAEL CORTES
Deputy Reinf. Masonry 4/18/2025 Conditional Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 4/18/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 4/25/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 5/2/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 5/7/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 5/12/2025 Not Ready for Inspection RAFAEL CORTES
Deputy Drilled-In Anchors 5/13/2025 Conditional Approval RAFAEL CORTES
Deputy Reinf. Concrete 5/13/2025 Conditional Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 5/13/2025 Not Ready for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 5/14/2025 Not Ready for Inspection RAFAEL CORTES
Pre-Inspection 5/15/2025 Approved RAFAEL CORTES
Insulation 5/16/2025 Not Ready for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 5/22/2025 Partial Inspection RAFAEL CORTES
Drywall Nailing 5/23/2025 Partial Approval RAFAEL CORTES
Drywall Nailing 5/27/2025 Not Ready for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 5/27/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 5/29/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 6/2/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 6/3/2025 Partial Approval RAFAEL CORTES
Insulation 6/5/2025 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 6/6/2025 Not Ready for Inspection RAFAEL CORTES
Insulation 6/6/2025 Partial Approval RAFAEL CORTES
Drywall Nailing 6/9/2025 Partial Approval RAFAEL CORTES
Drywall Nailing 6/11/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 6/11/2025 Partial Approval RAFAEL CORTES
Insulation 6/18/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 6/24/2025 Partial Approval RAFAEL CORTES
Insulation 6/24/2025 Partial Approval RAFAEL CORTES
Wood Frame 6/24/2025 Partial Approval RAFAEL CORTES
Deputy Drilled-In Anchors 6/25/2025 Conditional Approval RAFAEL CORTES
Deputy Steel/Welding 6/25/2025 Conditional Approval RAFAEL CORTES
Deputy Wood Construction 6/25/2025 Conditional Approval RAFAEL CORTES
Light Gage Steel Frame 6/25/2025 No Access for Inspection RAFAEL CORTES
Deputy Steel/Welding 6/26/2025 Conditional Approval RAFAEL CORTES
Insulation 6/26/2025 Partial Approval RAFAEL CORTES
Deputy Steel/Welding 6/27/2025 Conditional Approval RAFAEL CORTES
Deputy Wood Construction 6/27/2025 Conditional Approval RAFAEL CORTES
Wood Frame 6/27/2025 Not Ready for Inspection RAFAEL CORTES
Wood Frame 6/30/2025 Partial Approval DAVID BURKHEAD
Deputy Steel/Welding 7/1/2025 No Result Entered NICK DANERI
Insulation 7/1/2025 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 7/2/2025 Conditional Approval DAVID BURKHEAD
Insulation 7/2/2025 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 7/3/2025 Not Ready for Inspection LARRY ARNICK
Insulation 7/3/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 7/3/2025 Not Ready for Inspection LARRY ARNICK
Deputy Wood Construction 7/7/2025 Conditional Approval DAVID BURKHEAD
Insulation 7/7/2025 Partial Approval DAVID BURKHEAD
Deputy Wood Construction 7/8/2025 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/8/2025 Not Ready for Inspection LARRY ARNICK
Wood Frame 7/8/2025 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 7/10/2025 Partial Approval LARRY ARNICK
Insulation 7/11/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/14/2025 Not Ready for Inspection JOEY BUCHANAN
Insulation 7/14/2025 Partial Approval JOEY BUCHANAN
Interior/Exterior Lathing 7/14/2025 Partial Approval JOEY BUCHANAN
Drywall Nailing 7/15/2025 Not Ready for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 7/15/2025 Not Ready for Inspection RAFAEL CORTES
Insulation 7/15/2025 Partial Approval RAFAEL CORTES
Drywall Nailing 7/17/2025 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 7/17/2025 Not Ready for Inspection RAFAEL CORTES
Wood Frame 7/17/2025 Not Ready for Inspection RAFAEL CORTES
Wood Frame 7/21/2025 Not Ready for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 7/23/2025 Partial Approval JEROME BLACKWOOD
Insulation 7/23/2025 Not Ready for Inspection JEROME BLACKWOOD
Floor/Roof Diaphrgm/Shear Wall 7/24/2025 Partial Approval RONALD JIMENEZ
Insulation 7/24/2025 Partial Approval RONALD JIMENEZ
Wood Frame 7/28/2025 Not Ready for Inspection EDWIN GREGORYONA
Deputy Wood Construction 7/29/2025 Conditional Approval RONALD JIMENEZ
Drywall Nailing 7/29/2025 Not Ready for Inspection RONALD JIMENEZ
Insulation 7/29/2025 Not Ready for Inspection RONALD JIMENEZ
Wood Frame 7/29/2025 Not Ready for Inspection RONALD JIMENEZ
Drywall Nailing 7/30/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 7/30/2025 Not Ready for Inspection RAFAEL CORTES
Insulation 7/30/2025 Not Ready for Inspection RAFAEL CORTES
Insulation 7/31/2025 Partial Approval RAFAEL CORTES
Wood Frame 7/31/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 8/4/2025 Partial Approval RONALD JIMENEZ
Insulation 8/4/2025 Partial Approval RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 8/5/2025 Partial Approval JEROME BLACKWOOD
Insulation 8/5/2025 Partial Approval JEROME BLACKWOOD
Floor/Roof Diaphrgm/Shear Wall 8/7/2025 Partial Approval MARTIN TAVITIAN
Floor/Roof Diaphrgm/Shear Wall 8/8/2025 No Access for Inspection RAFAEL CORTES
Insulation 8/8/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 8/11/2025 No Access for Inspection RAFAEL CORTES
Insulation 8/11/2025 Partial Approval JOEY BUCHANAN
Insulation 8/12/2025 Partial Approval RAFAEL CORTES
Drywall Nailing 8/15/2025 Partial Approval RONALD JIMENEZ
Drywall Nailing 8/19/2025 Not Ready for Inspection RAFAEL CORTES
Special/Order Compliance 8/19/2025 Partial Approval RAFAEL CORTES
Insulation 8/20/2025 No Access for Inspection RAFAEL CORTES
Insulation 8/22/2025 Partial Approval RONALD JIMENEZ
Insulation 8/25/2025 Partial Approval ALFREDO LOPEZ
Drywall Nailing 8/26/2025 Partial Approval JEROME BLACKWOOD
Drywall Nailing 8/27/2025 Partial Approval RONALD JIMENEZ
Insulation 8/27/2025 Partial Approval RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 8/28/2025 Not Ready for Inspection RAFAEL CORTES
Insulation 8/28/2025 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 9/2/2025 Partial Approval RONALD JIMENEZ
Drywall Nailing 9/5/2025 Partial Approval RAFAEL ESPINOZA
Insulation 9/5/2025 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/5/2025 Partial Approval RAFAEL ESPINOZA
Light Gage Steel Frame 9/8/2025 Partial Approval RAFAEL CORTES
Wood Frame 9/11/2025 Not Ready for Inspection RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 9/15/2025 Partial Approval RAFAEL CORTES
Wood Frame 9/15/2025 Partial Approval RAFAEL CORTES
Drywall Nailing 9/17/2025 Not Ready for Inspection RAFAEL CORTES
Insulation 9/17/2025 Partial Approval RAFAEL CORTES
Insulation 9/19/2025 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 9/19/2025 Partial Approval RAFAEL CORTES
Insulation 9/22/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 9/26/2025 Partial Approval RONALD JIMENEZ
Insulation 9/26/2025 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 9/26/2025 Partial Approval RONALD JIMENEZ
Insulation 10/1/2025 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 10/2/2025 Partial Approval RONALD JIMENEZ
Insulation 10/3/2025 Not Ready for Inspection RAFAEL CORTES
Interior/Exterior Lathing 10/3/2025 No Access for Inspection RAFAEL CORTES
Wood Frame 10/3/2025 No Access for Inspection RAFAEL CORTES
Insulation 10/6/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 10/6/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 10/6/2025 Partial Approval EDWIN GREGORYONA
Deputy Drilled-In Anchors 10/10/2025 Conditional Approval RAFAEL ESPINOZA
Drywall Nailing 10/10/2025 Partial Approval RAFAEL ESPINOZA
Footing/Foundation/Slab 10/10/2025 Partial Approval RAFAEL ESPINOZA
Interior/Exterior Lathing 10/10/2025 Partial Approval RAFAEL ESPINOZA
Drywall Nailing 10/16/2025 Partial Approval RAFAEL CORTES
Interior/Exterior Lathing 10/16/2025 Partial Approval RAFAEL CORTES
Interior/Exterior Lathing 10/17/2025 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 10/20/2025 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 10/20/2025 Partial Approval RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 10/22/2025 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 10/22/2025 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 10/23/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 10/27/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/3/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 11/5/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 11/5/2025 Partial Approval EDWIN GREGORYONA
Wood Frame 11/18/2025 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 11/21/2025 Partial Approval EDWIN GREGORYONA
Interior/Exterior Lathing 11/24/2025 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 11/25/2025 Partial Approval EDWIN GREGORYONA
Drywall Nailing 12/3/2025 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 12/5/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 12/19/2025 Partial Approval EDWIN GREGORYONA
Insulation 12/23/2025 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 1/6/2026 Not Ready for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 1/12/2026 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 1/13/2026 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 1/23/2026 Partial Approval RAFAEL CORTES
Special/Order Compliance 1/26/2026 Not Ready for Inspection RAFAEL CORTES
Insulation 1/28/2026 Not Ready for Inspection RONALD JIMENEZ
Special/Order Compliance 1/28/2026 Approved RONALD JIMENEZ
Insulation 2/2/2026 Partial Approval RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 2/17/2026 Not Ready for Inspection RAFAEL CORTES
Drywall Nailing 2/20/2026 Partial Approval RONALD JIMENEZ
Floor/Roof Diaphrgm/Shear Wall 2/20/2026 Partial Approval RONALD JIMENEZ
Drywall Nailing 2/24/2026 Partial Inspection RAFAEL CORTES
Footing/Foundation/Slab 2/27/2026 Approved RONALD JIMENEZ
Excavation/Setback/Form/Re-Bar 3/9/2026 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 3/13/2026 Conditional Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 3/13/2026 Partial Approval RAFAEL CORTES
Interior/Exterior Lathing 3/18/2026 Partial Approval RAFAEL CORTES
Special/Order Compliance 3/24/2026 Partial Approval RAFAEL CORTES
Special/Order Compliance 3/25/2026 Partial Approval RAFAEL CORTES
Light Gage Steel Frame 3/27/2026 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 4/3/2026 Partial Approval RONALD JIMENEZ
Reinforced Concrete Frame 4/3/2026 Partial Approval RONALD JIMENEZ
Drywall Nailing 4/14/2026 Not Ready for Inspection RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 4/14/2026 Partial Approval RAFAEL CORTES
Deputy Reinf. Concrete 4/15/2026 Conditional Approval RONALD JIMENEZ
Drywall Nailing 4/15/2026 Partial Approval RONALD JIMENEZ
Light Gage Steel Frame 4/15/2026 Partial Approval RONALD JIMENEZ
Excavation/Setback/Form/Re-Bar 4/22/2026 Partial Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 5/4/2026 Partial Approval RAFAEL CORTES
Interior/Exterior Lathing 5/11/2026 Partial Approval RAFAEL CORTES
Excavation/Setback/Form/Re-Bar 5/14/2026 Partial Approval MARTIN TAVITIAN
Green Building Rough 5/15/2026 No Access for Inspection RAFAEL CORTES
Reinforced Concrete Frame 5/15/2026 No Access for Inspection RAFAEL CORTES
Verify Sprinkler Sign Off 5/15/2026 No Access for Inspection RAFAEL CORTES
Floor/Roof Diaphrgm/Shear Wall 5/22/2026 Approved RONALD JIMENEZ
Excavation/Setback/Form/Re-Bar 6/3/2026 Partial Approval RAFAEL CORTES