479 1/2 W SOLANO AVE 90012

Certificate Information: 479 1/2 W SOLANO AVE 90012

Application / Permit
22010-10000-03443
Plan Check / Job No.
B22LA13685
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
eplan: proposed two story one detached ADU (front building) using adu10it-cube standard plan approved under B20LA22754. (Two ADUs per State Law, CA Govt. Code 65852.2(e)(1)(D) and applicable part2 of LAMC 12.22 A.33 (c)-(d), (g)) “The LID clearance has been deferred. Approval for LID requirements shall be obtained from LASAN prior to the finaling of the permit.”
Permit Issued
Issued on 4/25/2023
Issuing Office
Current Status
Issued on 4/25/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 7/25/2022 APPLICANT
Assigned to Plan Check Engineer 7/29/2022 AUNG SOE
Corrections Issued 8/1/2022 AUNG SOE
Applicant returned to address corrections 3/15/2023 AUNG SOE
Applicant returned to address corrections 3/23/2023 AUNG SOE
Plan Check Approved 4/21/2023 JOE VO
Issued 4/25/2023 APPLICANT

Permit Application Clearance Information

Address approval Cleared 8/16/2022 JEANETTE VONG
Sewer availability Cleared 9/13/2022 JEANETTE VONG
Grading Pre-Inspection Cleared 9/16/2022 KIRK LINKLATER
Distance to fire station Cleared 9/17/2022 RUEL COLE
Eng Process Fee Ord 176,300 Cleared 9/17/2022 JEANETTE VONG
Hydrant and Access approval Cleared 9/17/2022 RUEL COLE
Tenant Habitability Plan Cleared 9/22/2022 RICARDO BOHORQUEZ
Roof/Waste drainage to street Cleared 9/23/2022 JEANETTE VONG

Contact Information

Architect Taalman,, Linda Evelyn; Lic. No.: C30187 2902 ROWENA AVENUE      LOS ANGELES, CA 90039
Architect Taalman,, Linda Evelyn; Lic. No.: NA30187       ,
Contractor Owner-Builder       ,
Engineer Polon,, Gordon Leonard; Lic. No.: C28564 709 19TH STREET      SANTA MONICA, CA 90402

Inspector Information

OSVALDO PARAMO, (213) 202-9854 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

Service/Power Release 6/22/2026   
Final 6/22/2026   

Inspection Request History

Pre-Inspection 11/21/2023 Partial Inspection OSVALDO PARAMO
Excavation/Setback/Form/Re-Bar 3/28/2024 Partial Approval OSVALDO PARAMO
Footing/Foundation/Slab 3/28/2024 Corrections Issued OSVALDO PARAMO
PLUMBING-Rough 5/24/2024 Partial Approval ALIZAH MAYAGOITIA
Footing/Foundation/Slab 5/29/2024 Partial Approval OSVALDO PARAMO
Footing/Foundation/Slab 7/22/2024 Approved OSVALDO PARAMO
Deputy Drilled-In Anchors 10/25/2024 Conditional Approval OSVALDO PARAMO
Underground Mechanical 12/19/2024 Partial Approval OSVALDO PARAMO
ELECTRICAL-Rough 1/23/2025 Conditional Approval OSVALDO PARAMO
PLUMBING-Rough 2/5/2025 Approved ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 2/20/2025 Corrections Issued ALIZAH MAYAGOITIA
MERV13>=Rough 2/20/2025 Approved ALIZAH MAYAGOITIA
Rough-Elec/Plmb/HVAC 2/20/2025 Approved ALIZAH MAYAGOITIA
Verify Sprinkler Sign Off 2/20/2025 Approved ALIZAH MAYAGOITIA
Insulation 3/20/2025 Approved ALIZAH MAYAGOITIA
Interior/Exterior Lathing 3/20/2025 Partial Approval ALIZAH MAYAGOITIA
Shower Pan 3/20/2025 Corrections Issued ALIZAH MAYAGOITIA
Interior/Exterior Lathing 3/27/2025 Approved ANTHONY RAMOS
Shower Pan 3/27/2025 Not Ready for Inspection ANTHONY RAMOS
Shower Pan 4/2/2025 Approved DAVID WILLIAMS
Drywall Nailing 4/4/2025 Approved LILIANA PORTILLO
PLUMBING-Rough 10/27/2025 Approved ALIZAH MAYAGOITIA
Sewer 10/27/2025 Partial Approval ALIZAH MAYAGOITIA
PLUMBING-Rough 12/4/2025 Approved ALIZAH MAYAGOITIA
ELECTRICAL-Final 4/24/2026 Approved RONNIE MEDINA
BUILDING-Rough-Frame 5/22/2026 Approved OSVALDO PARAMO
Final 5/22/2026 Corrections Issued OSVALDO PARAMO
MERV13>=Final 5/22/2026 Approved OSVALDO PARAMO
SGSOV-Seismic Gas S/O Valve 5/22/2026 SGSOV Approved OSVALDO PARAMO
Service/Power Release 5/22/2026 Not Ready for Inspection OSVALDO PARAMO
Smoke Detectors 5/22/2026 Approved OSVALDO PARAMO