3720 N LOMITAS DR 90032

Certificate Information: 3720 N LOMITAS DR 90032

Application / Permit
22010-10000-03213
Plan Check / Job No.
B22LA12489
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
(n) 1-story ADU per 12.22 A.33(c)(d) R3 Occupancy NFPA 13D throughout 2 of 4
Permit Issued
Issued on 8/17/2023
Issuing Office
Metro
Current Status
CofO Issued on 7/14/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/28/2022 APPLICANT
Assigned to Plan Check Engineer 7/28/2022 KELVIN CHUONG
Corrections Issued 8/11/2022 KELVIN CHUONG
Quality Review Completed 8/11/2022 KEN GILL
Building Plans Picked Up 8/12/2022 APPLICANT
Applicant returned to address corrections 8/4/2023 KELVIN CHUONG
Applicant returned to address corrections 8/15/2023 KELVIN CHUONG
Plan Check Approved 8/17/2023 KELVIN CHUONG
Issued 8/17/2023 APPLICANT
CofO in Progress 7/8/2025 LILIANA PORTILLO
CofO Issued 7/14/2025 DEROLD HAUFF
Permit Finaled 7/14/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 8/30/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 8/30/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 8/30/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 8/30/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 8/30/2022 STEVE MELGAR
BHO/Hillside ordinance Cleared 8/30/2022 STEVE MELGAR
Eng Process Fee Ord 176,300 Cleared 8/30/2022 STEVE MELGAR
Sewer availability Cleared 8/30/2022 STEVE MELGAR
Hydrant and Access approval Cleared 11/23/2022 LAVEON RIDER
Low Impact Development Cleared 4/18/2023 ROGELIO CORTES
Disturb/Remove Protected Trees Cleared 4/23/2023 ADALBERTO VERA
"D" conditions Cleared 5/12/2023 JAZMIN ROQUE
"Q" conditions Cleared 5/12/2023 JAZMIN ROQUE
Roof/Waste drainage to street Cleared 5/12/2023 ADRIAN SANCHEZ
ZI Cleared 5/12/2023 JAZMIN ROQUE
GPI Written Notices Cleared 8/15/2023 KELVIN CHUONG
Grading Pre-Inspection Cleared 8/15/2023 KELVIN CHUONG

Contact Information

Contractor Owner-Builder       ,
Engineer Alson,, Ken; Lic. No.: C41697 9744 MAPLE ST 201      BELLFLOWER, CA 90706
Engineer Hamilton,, John O; Lic. No.: C53284 P O BOX 866      HAWTHORNE, CA 90251
Engineer Koh,, Timothy; Lic. No.: L8669 9853 MAPLE STREET      BELLFLOWER, CA 90706
Engineer Lee,, Allen C; Lic. No.: GE2781 11823 SLAUSON AVE STE 46      SANTA FE SPRINGS, CA 90670

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 5/6/2024 Not Ready for Inspection LILIANA PORTILLO
Footing/Foundation/Slab 5/7/2024 Partial Approval LILIANA PORTILLO
Masonry Wall/Backfill 5/14/2024 Partial Approval BRENDAN MORELLI
Footing/Foundation/Slab 5/28/2024 Partial Approval LILIANA PORTILLO
Underground Mechanical 6/6/2024 Partial Approval LILIANA PORTILLO
Footing/Foundation/Slab 6/12/2024 Approved LILIANA PORTILLO
ELECTRICAL-Rough 10/16/2024 Approved LILIANA PORTILLO
Floor/Roof Diaphrgm/Shear Wall 10/16/2024 Corrections Issued LILIANA PORTILLO
HVAC-Rough 10/16/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 10/18/2024 Conditional Approval LILIANA PORTILLO
PLUMBING-Rough 10/18/2024 Approved LILIANA PORTILLO
Verify Sprinkler Sign Off 10/18/2024 Approved LILIANA PORTILLO
Insulation 10/22/2024 Corrections Issued LILIANA PORTILLO
Interior/Exterior Lathing 10/22/2024 Partial Approval LILIANA PORTILLO
Drywall Nailing 10/28/2024 Not Ready for Inspection JOSH MEISTER
Green Building Rough 10/28/2024 Approved JOSH MEISTER
Shower Pan 10/28/2024 Approved JOSH MEISTER
Drywall Nailing 10/31/2024 Not Ready for Inspection LILIANA PORTILLO
Interior/Exterior Lathing 10/31/2024 Approved LILIANA PORTILLO
BUILDING-Rough-Frame 6/24/2025 Approved LILIANA PORTILLO
Drywall Nailing 6/24/2025 Approved LILIANA PORTILLO
Final 6/24/2025 Corrections Issued LILIANA PORTILLO
Green Building Final 6/24/2025 Not Ready for Inspection LILIANA PORTILLO
SGSOV-Seismic Gas S/O Valve 6/24/2025 SGSOV Not Required LILIANA PORTILLO
Service/Power Release 6/24/2025 Not Ready for Inspection LILIANA PORTILLO
Smoke Detectors 6/24/2025 Approved LILIANA PORTILLO
ELECTRICAL-Final 7/7/2025 Approved LILIANA PORTILLO
Final 7/7/2025 OK to Issue CofO LILIANA PORTILLO
Green Building Final 7/7/2025 Approved LILIANA PORTILLO
HVAC-Final 7/7/2025 Approved LILIANA PORTILLO
PLUMBING-Final 7/7/2025 Approved LILIANA PORTILLO
Service/Power Release 7/7/2025 Approved LILIANA PORTILLO