426 3/4 N ALTA VISTA BLVD 90036

Certificate Information: 426 3/4 N ALTA VISTA BLVD 90036

Application / Permit
22010-10000-03173
Plan Check / Job No.
B22LA12380
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(1) Accessory Dwelling Unit
Work Description
(N) ADU ON TOP OF (N) TWO CAR DETACHED GARAGE PER LAMC 12.22 A.33 (c)-(d)
Permit Issued
Issued on 5/2/2024
Issuing Office
Current Status
CofO Issued on 10/10/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/5/2022 APPLICANT
Assigned to Plan Check Engineer 7/28/2022 SERGIO GUTIERREZ
Corrections Issued 8/2/2022 SERGIO GUTIERREZ
Quality Review Completed 8/4/2022 RODOLFO ARIAS
Applicant returned to address corrections 8/23/2023 SERGIO GUTIERREZ
Applicant returned to address corrections 10/17/2023 SERGIO GUTIERREZ
Applicant returned to address corrections 11/14/2023 SERGIO GUTIERREZ
Applicant returned to address corrections 1/19/2024 SERGIO GUTIERREZ
Applicant returned to address corrections 4/2/2024 SERGIO GUTIERREZ
Plan Check Approved 4/16/2024 SERGIO GUTIERREZ
Plan Check Approved 5/2/2024 SERGIO GUTIERREZ
Issued 5/2/2024 APPLICANT
CofO in Progress 10/9/2025 CHRISTOPHER BLACKWOOD
Permit Finaled 10/10/2025 ERNESTO CORRAL
CofO Issued 10/10/2025 ERNESTO CORRAL
Permit Finaled 10/10/2025 ERNESTO CORRAL

Permit Application Clearance Information

Construction near power lines Cleared 11/19/2022 RIDWAN HARDY
Construction within easement Cleared 11/19/2022 RIDWAN HARDY
Address approval Cleared 2/10/2023 JEANETTE VONG
Eng Process Fee Ord 176,300 Cleared 2/14/2023 JEANETTE VONG
Sewer availability Cleared 2/14/2023 JEANETTE VONG
Tenant Habitability Plan Cleared 4/24/2023 RICARDO BOHORQUEZ
Roof/Waste drainage to street Cleared 5/13/2023 STEVE MELGAR
Hydrant and Access approval Cleared 8/2/2023 LAVEON RIDER
Low Impact Development (LID) Cleared 4/4/2024 LUIS LUVANO

Contact Information

Contractor Cal - Quake Construction Inc; Lic. No.: 759817-B       ,
Contractor Perluss Sheldon K; Lic. No.: 759817-B       ,
Engineer Ni,, Zhang Yuan; Lic. No.: C68149 8232 GARVEY AVE 203      ROSEMEAD, CA 91770

Inspector Information

MARTIN TAVITIAN, (213) 482-7357 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/15/2024 Corrections Issued AMIR NAZARIAN
METHANE-Barrier 7/15/2024 Corrections Issued AMIR NAZARIAN
METHANE-Subgrade 7/15/2024 Corrections Issued AMIR NAZARIAN
Pre-Inspection 7/15/2024 Not Ready for Inspection AMIR NAZARIAN
Footing/Foundation/Slab 7/18/2024 Partial Approval AMIR NAZARIAN
METHANE-Barrier 7/18/2024 Approved AMIR NAZARIAN
METHANE-Subgrade 7/18/2024 Approved AMIR NAZARIAN
Pre-Inspection 7/18/2024 Not Ready for Inspection AMIR NAZARIAN
Green Building Rough 8/9/2024 Not Ready for Inspection AMIR NAZARIAN
Deputy Other (see comments) 8/13/2024 Conditional Approval BRENDAN MORELLI
Footing/Foundation/Slab 8/14/2024 Approved AMIR NAZARIAN
Special/Order Compliance 8/14/2024 Approved LUIS CASTRO
Floor/Roof Diaphrgm/Shear Wall 10/2/2024 Partial Approval JOSE MACIAS
METHANE-Rough 10/2/2024 Approved JOSE MACIAS
Deputy Wood Construction 10/4/2024 Conditional Approval NICHOLAS LOPEZ
Deputy Wood Construction 2/20/2025 Conditional Approval JOSE MACIAS
Floor/Roof Diaphrgm/Shear Wall 2/20/2025 Approved JOSE MACIAS
Pre-Inspection 5/14/2025 Partial Inspection BRENDAN MORELLI
Green Building Rough 5/21/2025 Not Ready for Inspection JOSE MACIAS
Verify Sprinkler Sign Off 5/21/2025 Not Ready for Inspection JOSE MACIAS
Wood Frame 5/21/2025 Not Ready for Inspection JOSE MACIAS
Green Building Rough 6/4/2025 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 6/4/2025 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 6/4/2025 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 6/10/2025 Not Ready for Inspection EDWIN GREGORYONA
Verify Sprinkler Sign Off 6/10/2025 Not Ready for Inspection EDWIN GREGORYONA
Wood Frame 6/10/2025 Partial Inspection EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/17/2025 Partial Approval CHRISTOPHER BLACKWOOD
Green Building Rough 6/17/2025 Not Ready for Inspection CHRISTOPHER BLACKWOOD
Verify Sprinkler Sign Off 6/17/2025 Approved CHRISTOPHER BLACKWOOD
Wood Frame 6/18/2025 Not Ready for Inspection CHRISTOPHER BLACKWOOD
Green Building Rough 6/20/2025 Approved EDWIN GREGORYONA
Wood Frame 6/20/2025 Approved EDWIN GREGORYONA
Insulation 6/24/2025 Approved CHRISTOPHER BLACKWOOD
Insulation 6/25/2025 Approved CHRISTOPHER BLACKWOOD
Drywall Nailing 6/27/2025 Partial Approval CHRISTOPHER BLACKWOOD
Drywall Nailing 7/1/2025 Approved CHRISTOPHER BLACKWOOD
Interior/Exterior Lathing 7/7/2025 Partial Approval CHRISTOPHER BLACKWOOD
Interior/Exterior Lathing 7/9/2025 Approved CHRISTOPHER BLACKWOOD
Final 8/29/2025 Partial Inspection MARTIN TAVITIAN
Green Building Final 8/29/2025 Approved MARTIN TAVITIAN
SGSOV-Seismic Gas S/O Valve 8/29/2025 SGSOV Approved MARTIN TAVITIAN
Smoke Detectors 8/29/2025 Approved MARTIN TAVITIAN
Final 10/3/2025 Conditional Approval CHRISTOPHER BLACKWOOD