233 S ROCKINGHAM AVE 90049

Certificate Information: 233 S ROCKINGHAM AVE 90049

Application / Permit
22010-10000-02578
Plan Check / Job No.
B22LA09528
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(23) Recreation Room
Work Description
NEW REC. ROOM, STORAGE, POOL EQUIMENT ROOM WITH POOL ABOVE. Supplemental per permit#21030-10000-07383. Revisions for this permit to include changes to grading quantities to accommodate newly proposed pool structure.
Permit Issued
Issued on 12/15/2022
Issuing Office
Current Status
CofO in Progress on 4/23/2026
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 5/19/2022 APPLICANT
Assigned to Plan Check Engineer 6/17/2022 JOE VO
Corrections Issued 6/21/2022 JOE VO
Quality Review Completed 6/23/2022 GARO TELMI
Plan Check Approved 12/8/2022 JOE VO
Issued 12/15/2022 APPLICANT
CofO in Progress 4/23/2026 HERBERT GIRON
CofO in Progress 4/23/2026 HERBERT GIRON
CofO in Progress 4/23/2026 HERBERT GIRON

Permit Application Clearance Information

Hydrant and Access approval Cleared 9/1/2022 LAVEON RIDER
Eng Process Fee Ord 176,300 Cleared 9/8/2022 CATHERINE ADROVER
Sewer availability Cleared 9/8/2022 CATHERINE ADROVER
Specific Plan Cleared 9/27/2022 FREDDY GARCIA
Low Impact Development Cleared 11/4/2022 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 11/9/2022 AHMED AMARRAGY
Miscellaneous Cleared 12/8/2022 JOE VO

Contact Information

Contractor Owner-Builder       ,
Engineer Daugherty,, Daniel Thomas; Lic. No.: C76588 31129 VIA COLINAS STE 707      WESTLAKE VILLAGE, CA 91362
Engineer Garcia,, Lionel J; Lic. No.: C58475 24702 NARBONNE AVE      LOMITA, CA 90717
Engineer Garcia,, Lionel J; Lic. No.: S4653 24702 NARBONNE AVE      LOMITA, CA 90717
Geologist Daugherty,, Daniel Thomas; Lic. No.: EG2569 31129 VIA COLINAS SUITE 707      WESTLAKE VILLAGE, CA 91362

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Grading 6/23/2023 No Access for Inspection KENNETH NAGLE
Excavation/Setback/Form/Re-Bar 8/7/2024 Approved ARAM AVEDISIAN
Footing/Foundation/Slab 8/7/2024 Approved ARAM AVEDISIAN
PLUMBING-Rough 8/26/2024 Partial Approval ARAM AVEDISIAN
Deputy Reinf. Concrete 9/13/2024 Conditional Approval JESUS RODRIGUEZ
Excavation/Setback/Form/Re-Bar 9/13/2024 Approved JESUS RODRIGUEZ
Deputy Reinf. Concrete 9/18/2024 Conditional Approval JESUS RODRIGUEZ
Floor/Roof Diaphrgm/Shear Wall 10/9/2024 Corrections Issued JESUS RODRIGUEZ
Green Building Rough 10/9/2024 Not Ready for Inspection JESUS RODRIGUEZ
Verify Sprinkler Sign Off 10/9/2024 Not Ready for Inspection JESUS RODRIGUEZ
Structural Steel Frame 10/17/2024 Approved JESUS RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/1/2024 Approved JESUS RODRIGUEZ
Deputy Drilled-In Anchors 11/14/2024 Conditional Approval JESUS RODRIGUEZ
Deputy Drilled-In Anchors 11/15/2024 Conditional Approval JESUS RODRIGUEZ
Deputy Reinf. Concrete 11/15/2024 Conditional Approval JESUS RODRIGUEZ
Excavation/Setback/Form/Re-Bar 11/18/2024 Approved JESUS RODRIGUEZ
PLUMBING-Rough 12/19/2024 Approved JESUS RODRIGUEZ
HVAC-Rough 4/14/2025 Not Ready for Inspection HERBERT GIRON
HVAC-Rough 5/9/2025 Corrections Issued TEMISTOCLES CAAL
ELECTRICAL-Rough 5/15/2025 Corrections Issued HERBERT GIRON
Pre-Inspection 5/20/2025 Partial Inspection HERBERT GIRON
Pre-Inspection 6/10/2025 Not Ready for Inspection MEL KHACHATOURIAN
HVAC-Final 6/25/2025 Partial Inspection HERBERT GIRON
Pre-Inspection 7/8/2025 Corrections Issued HERBERT GIRON
Pre-Inspection 7/15/2025 Partial Inspection HERBERT GIRON
ELECTRICAL-Rough 7/18/2025 Corrections Issued HERBERT GIRON
HVAC-Rough 7/18/2025 Approved HERBERT GIRON
Special/Order Compliance 7/18/2025 Corrections Issued HERBERT GIRON
ELECTRICAL-Rough 8/1/2025 Approved HERBERT GIRON
Special/Order Compliance 8/1/2025 Corrections Issued HERBERT GIRON
Pre-Inspection 8/6/2025 Partial Inspection HERBERT GIRON
Interior/Exterior Lathing 8/28/2025 Partial Approval HERBERT GIRON
Shower Pan 9/2/2025 Approved MICHAEL ALLEN
Shower Pan 9/8/2025 Approved HERBERT GIRON
BUILDING-Rough-Frame 9/9/2025 Corrections Issued HERBERT GIRON
Green Building Rough 9/9/2025 Approved HERBERT GIRON
Verify Sprinkler Sign Off 9/9/2025 Approved HERBERT GIRON
Interior/Exterior Lathing 9/10/2025 Partial Approval HERBERT GIRON
Structural Steel Frame 9/10/2025 Not Ready for Inspection HERBERT GIRON
BUILDING-Rough-Frame 9/12/2025 Conditional Approval HERBERT GIRON
Insulation 9/12/2025 Corrections Issued HERBERT GIRON
BUILDING-Rough-Frame 9/16/2025 Approved HERBERT GIRON
Interior/Exterior Lathing 9/17/2025 Partial Approval HERBERT GIRON
Drywall Nailing 9/18/2025 Partial Approval HERBERT GIRON
Insulation 9/18/2025 Not Ready for Inspection HERBERT GIRON
Drywall Nailing 9/19/2025 Not Ready for Inspection MICHAEL ALLEN
Insulation 9/22/2025 Approved HERBERT GIRON
Drywall Nailing 9/23/2025 Approved HERBERT GIRON
Gas Test 9/26/2025 Not Ready for Inspection HERBERT GIRON
Gas Test 10/1/2025 Not Ready for Inspection HERBERT GIRON
Gas Test 10/6/2025 Approved HERBERT GIRON
Enclosure/Fence 1/6/2026 Not Ready for Inspection HERBERT GIRON
Pre-Inspection 1/6/2026 Partial Inspection HERBERT GIRON
HVAC-Final 2/17/2026 Corrections Issued HERBERT GIRON
HVAC-Final 2/20/2026 Approved HERBERT GIRON
Pre-Inspection 2/26/2026 Partial Inspection HERBERT GIRON
PLUMBING-Final 3/5/2026 Partial Approval HERBERT GIRON
ELECTRICAL-Final 3/9/2026 Partial Inspection HERBERT GIRON
ELECTRICAL-Final 3/16/2026 Approved HERBERT GIRON
Smoke Detectors 3/16/2026 Approved HERBERT GIRON
PLUMBING-Final 3/25/2026 Not Ready for Inspection HERBERT GIRON
PLUMBING-Final 4/9/2026 Approved HERBERT GIRON
Final 4/21/2026 OK to Issue CofO HERBERT GIRON
Green Building Final 4/21/2026 Approved HERBERT GIRON
SGSOV-Seismic Gas S/O Valve 4/21/2026 SGSOV Approved HERBERT GIRON