2146-2148 W 78TH PL 90047

Certificate Information: 2146-2148 W 78TH PL 90047

Application / Permit
22010-10000-01492
Plan Check / Job No.
B22LA05147
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
*EPLAN* CONVERT (E) ATTACHED 2-CAR GARAGE TO JADU (420 SF) PER ENGINEER DESIGN IN EXISTING SINGLE FMAILY DWELLING (Junior ADU per State Law, CA Govt. Code 65852.2(e)(1)(A) and 5852.229)
Permit Issued
Issued on 6/10/2024
Issuing Office
Current Status
CofO Issued on 7/5/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/23/2022 APPLICANT
Assigned to Plan Check Engineer 3/24/2022 VIVIAN LAO
Corrections Issued 3/24/2022 VIVIAN LAO
Applicant returned to address corrections 5/3/2024 NGHI SU
Applicant returned to address corrections 5/23/2024 GEORGE ALVAREZ
Applicant returned to address corrections 6/6/2024 AUNG SOE
Plan Check Approved 6/7/2024 AUNG SOE
Issued 6/10/2024 APPLICANT
CofO in Progress 7/2/2025 MICHAEL LEWIS
Permit Finaled 7/5/2025 DEROLD HAUFF
CofO Issued 7/5/2025 DEROLD HAUFF
Permit Finaled 7/5/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 4/18/2022 AMAAN MALIK
Roof/Waste drainage to street Cleared 4/18/2022 AMAAN MALIK
Sewer availability Cleared 4/18/2022 AMAAN MALIK
Eng Process Fee Ord 176,300 Cleared 5/14/2024 ERIK BEASLEY

Contact Information

Contractor Owner-Builder       ,
Engineer Chu,, Tien Manh; Lic. No.: C72324 9542 PACIFIC AVE      ANAHEIM, CA 92804

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 7/23/2024 Corrections Issued JOSE MACIAS
Excavation/Setback/Form/Re-Bar 8/6/2024 Approved JOSE MACIAS
Footing/Foundation/Slab 8/6/2024 Not Ready for Inspection JOSE MACIAS
Reinforced Concrete Frame 8/6/2024 Not Ready for Inspection JOSE MACIAS
ELECTRICAL-Rough 9/25/2024 Not Ready for Inspection AMIR NAZARIAN
Footing/Foundation/Slab 9/25/2024 Not Ready for Inspection AMIR NAZARIAN
Insulation 9/25/2024 Not Ready for Inspection AMIR NAZARIAN
PLUMBING-Rough 9/25/2024 Corrections Issued AMIR NAZARIAN
Reinforced Concrete Frame 9/25/2024 Not Ready for Inspection AMIR NAZARIAN
Insulation 9/30/2024 Not Ready for Inspection AMIR NAZARIAN
PLUMBING-Rough 9/30/2024 Approved AMIR NAZARIAN
ELECTRICAL-Rough 10/18/2024 Corrections Issued AMIR NAZARIAN
HVAC-Rough 10/18/2024 Corrections Issued AMIR NAZARIAN
PLUMBING-Final 10/18/2024 Not Ready for Inspection AMIR NAZARIAN
PLUMBING-Rough 10/18/2024 Corrections Issued AMIR NAZARIAN
BUILDING-Rough-Frame 10/28/2024 Corrections Issued AMIR NAZARIAN
ELECTRICAL-Final 10/28/2024 Not Ready for Inspection AMIR NAZARIAN
ELECTRICAL-Rough 10/28/2024 Approved AMIR NAZARIAN
HVAC-Final 10/28/2024 Not Ready for Inspection AMIR NAZARIAN
HVAC-Rough 10/28/2024 Approved AMIR NAZARIAN
Insulation 10/28/2024 Corrections Issued AMIR NAZARIAN
PLUMBING-Final 10/28/2024 Not Ready for Inspection AMIR NAZARIAN
BUILDING-Rough-Frame 11/19/2024 Approved AMIR NAZARIAN
Insulation 11/19/2024 Approved AMIR NAZARIAN
Shower Pan 11/19/2024 Corrections Issued AMIR NAZARIAN
Shower Pan 11/21/2024 Approved ALEX COLIN
Drywall Nailing 11/27/2024 Approved ALEX COLIN
Interior/Exterior Lathing 11/27/2024 Approved ALEX COLIN
Special/Order Compliance 12/5/2024 Approved JOSE MACIAS
Final 12/27/2024 Corrections Issued AMIR NAZARIAN
SGSOV-Seismic Gas S/O Valve 12/27/2024 SGSOV Approved AMIR NAZARIAN
Smoke Detectors 12/27/2024 Approved AMIR NAZARIAN
Final 12/31/2024 Corrections Issued AMIR NAZARIAN
ELECTRICAL-Final 1/3/2025 Approved AMIR NAZARIAN
Final 1/3/2025 Partial Approval AMIR NAZARIAN
Grounding or Bonding 1/3/2025 Approved AMIR NAZARIAN
Final 4/10/2025 Conditional Approval WAYNE REGESTER
Final 7/2/2025 OK to Issue CofO WAYNE REGESTER