400 E ADAMS BLVD 1-84 90011

Certificate Information: 400 E ADAMS BLVD 1-84 90011

Application / Permit
22010-10000-00985
Plan Check / Job No.
B22LA03589
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
New 5-story with roof deck, 84-unit (9% ELI = 8) affordable housing apartment with 4-levels of Type VA apartment, over 1-story Type IA parking/lobby, using LAMC 12.22A.31 TOC Tier 2 incentives. Type VA construction portion of the building is per State Approved plans.
Permit Issued
Issued on 10/6/2023
Issuing Office
Current Status
Issued on 10/6/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/10/2022 APPLICANT
Assigned to Plan Check Engineer 3/17/2022 RODOLFO ARIAS
Corrections Issued 3/30/2022 RODOLFO ARIAS
Quality Review Completed 4/1/2022 EUGENE BARBEAU
Applicant returned to address corrections 4/28/2022 RODOLFO ARIAS
Plan Check Approved 9/28/2023 VU NGUYEN
Issued 10/6/2023 APPLICANT

Permit Application Clearance Information

Address approval Cleared 4/21/2022 JEANIE LAM
Community Plan Implem. Overlay Cleared 4/21/2022 JEANIE LAM
Community Plan Implem. Overlay Cleared 10/12/2022 RIDWAN HARDY
Construction near power lines Cleared 10/12/2022 RIDWAN HARDY
Eng Process Fee Ord 176,300 Cleared 11/1/2022 CINDY QI
Sewer availability Cleared 1/4/2023 CINDY QI
Miscellaneous Cleared 1/25/2023 MAXFIELD VERMY
Miscellaneous Cleared 1/25/2023 MAXFIELD VERMY
Miscellaneous Cleared 1/25/2023 MAXFIELD VERMY
Community Plan Implem. Overlay Cleared 1/26/2023 ADALBERTO VERA
Trees in Parkway Cleared 1/26/2023 ADALBERTO VERA
Community Plan Implem. Overlay Cleared 3/2/2023 TAIMOUR TANAVOLI
Driveway location Cleared 3/2/2023 TAIMOUR TANAVOLI
Bicycle Parking Cleared 3/10/2023 ANTHONY TRAN
Highway dedication Cleared 3/14/2023 CINDY QI
Permit Cleared 3/14/2023 CINDY QI
Low Impact Development Cleared 4/7/2023 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 4/13/2023 CINDY QI
DAS Clearance Cleared 6/7/2023 RODOLFO ARIAS
Green Code Cleared 6/23/2023 RODOLFO ARIAS
Work Adjacent to Public Way Cleared 7/18/2023 LARRY LEE
Fire Marshal Fire Life Safety Cleared 8/10/2023 MENOA AGHAJANI
Density Bonus 12.22.A.31 Cleared 8/30/2023 LOUIE MILLER
SB8 RUD Cleared 8/30/2023 LOUIE MILLER
Hydrant and Access approval Cleared 9/11/2023 JOHN CONNEALLY
Frnt yard landscape/Water mgmt Cleared 9/14/2023 MAXFIELD VERMY
Opn space landscape/Water mgmt Cleared 9/14/2023 MAXFIELD VERMY
Prkng lot landscape/Water mgmt Cleared 9/14/2023 MAXFIELD VERMY
Site Plan review Cleared 9/14/2023 MAXFIELD VERMY
Community Plan Implem. Overlay Cleared 9/21/2023 HELEN JADALI
Miscellaneous Cleared 9/21/2023 HELEN JADALI
Building over 36-ft Cleared 9/28/2023 CALOSHA APPROVED
Excavation more than 5-ft deep Cleared 9/28/2023 CALOSHA APPROVED

Contact Information

Architect Budetti,, Robert Peter; Lic. No.: C23757 601 N CEDROS AVE      SOLANO BEACH, CA 92075
Contractor Steiner Douglas Construction Inc; Lic. No.: 916002-B 1541 PARKWAY LOOP STE A      TUSTIN, CA 92780
Engineer Babayan,, Raffi Samuel; Lic. No.: C72168 7718 DAY STREET      LOS ANGELES, CA 91042
Engineer Risung,, Kai Magnus; Lic. No.: C92053 1435 WEST BEAR TRACK DRIVE      MERIDIAN, ID 83642

Inspector Information

ALFREDO LOPEZ, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI
JAMES POWERS, (213) 482-0361 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/8/2023 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 12/11/2023 Partial Approval JAMES POWERS
Deputy Methane Barrier 12/13/2023 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/13/2023 Not Ready for Inspection LARRY ARNICK
Excavation/Setback/Form/Re-Bar 12/15/2023 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 12/18/2023 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 1/5/2024 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 1/9/2024 Partial Approval JAMES POWERS
Reinforced Concrete Frame 1/9/2024 Partial Approval JAMES POWERS
Deputy Methane Barrier 1/10/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 1/12/2024 Partial Approval JAMES POWERS
Deputy Methane Barrier 1/18/2024 Conditional Approval LARRY ARNICK
Excavation/Setback/Form/Re-Bar 1/18/2024 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 1/29/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 1/30/2024 Partial Approval LARRY ARNICK
Deputy Reinf. Concrete 1/31/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Methane Barrier 2/13/2024 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 2/15/2024 Partial Approval NICK DANERI
Deputy Reinf. Masonry 2/27/2024 Partial Approval JAMES POWERS
Masonry Wall/Backfill 2/27/2024 Partial Approval JAMES POWERS
Deputy Methane Barrier 2/29/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/11/2024 Partial Approval JAMES POWERS
Masonry Wall/Backfill 3/12/2024 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/12/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 3/18/2024 Partial Approval JAMES POWERS
Reinforced Concrete Frame 3/27/2024 Partial Approval JAMES POWERS
Reinforced Masonry Frame 3/27/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/10/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 4/10/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 4/10/2024 Partial Approval JAMES POWERS
METHANE-Barrier 4/10/2024 Not Ready for Inspection JAMES POWERS
METHANE-Subgrade 4/10/2024 Not Ready for Inspection JAMES POWERS
Deputy Reinf. Concrete 4/12/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/17/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 4/17/2024 Partial Approval JAMES POWERS
Reinforced Concrete Frame 4/17/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 4/18/2024 Partial Approval JAMES POWERS
Masonry Wall/Backfill 4/29/2024 Partial Inspection JEFFREY FULTON
Deputy Reinf. Masonry 5/7/2024 Partial Approval JAMES POWERS
Masonry Wall/Backfill 5/8/2024 Partial Approval JAMES POWERS
Reinforced Masonry Frame 5/8/2024 Partial Approval JAMES POWERS
Deputy Reinf. Masonry 5/17/2024 Conditional Approval NICK DANERI
METHANE-Subgrade 5/17/2024 Conditional Approval NICK DANERI
Masonry Wall/Backfill 5/17/2024 Partial Approval NICK DANERI
Deputy Methane Barrier 6/3/2024 Partial Approval JAMES POWERS
Deputy Methane Barrier 6/4/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/11/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 6/11/2024 Partial Approval JAMES POWERS
METHANE-Barrier 6/11/2024 Approved JAMES POWERS
METHANE-Subgrade 6/11/2024 Approved JAMES POWERS
Deputy Reinf. Concrete 6/13/2024 Partial Approval JAMES POWERS
Footing/Foundation/Slab 7/26/2024 Not Ready for Inspection JAMES POWERS
Deputy Methane Barrier 8/6/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/12/2024 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 8/13/2024 Not Ready for Inspection JAMES POWERS
Footing/Foundation/Slab 8/13/2024 Partial Approval JAMES POWERS
Reinforced Concrete Frame 8/13/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 8/15/2024 Partial Approval JAMES POWERS
Pre-Inspection 8/20/2024 Partial Approval JAMES POWERS
Drywall Nailing 8/21/2024 Not Ready for Inspection JAMES POWERS
Green Building Rough 8/21/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 8/21/2024 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 8/21/2024 Not Ready for Inspection JAMES POWERS
Wood Frame 8/21/2024 Partial Approval JAMES POWERS
Pre-Inspection 8/22/2024 Partial Approval JAMES POWERS
Special/Order Compliance 8/22/2024 Approved ALFREDO LOPEZ
Deputy Reinf. Concrete 8/23/2024 Partial Approval JAMES POWERS
Deputy Wood Construction 8/26/2024 Partial Approval JAMES POWERS
Deputy Wood Construction 8/27/2024 Partial Approval JAMES POWERS
Deputy Wood Construction 9/9/2024 Partial Approval JAMES POWERS
Deputy Wood Construction 9/30/2024 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 9/30/2024 Partial Approval JAMES POWERS
Green Building Rough 9/30/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 9/30/2024 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 9/30/2024 Not Ready for Inspection JAMES POWERS
Green Building Rough 10/7/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 10/7/2024 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 10/7/2024 Not Ready for Inspection JAMES POWERS
Wood Frame 10/7/2024 Partial Approval JAMES POWERS
Drywall Nailing 10/18/2024 Not Ready for Inspection JAMES POWERS
Green Building Rough 10/18/2024 Not Ready for Inspection JAMES POWERS
Light Gage Steel Frame 10/18/2024 Not Ready for Inspection JAMES POWERS
METHANE-Rough 10/18/2024 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 10/18/2024 Not Ready for Inspection JAMES POWERS
Wood Frame 10/18/2024 Not Ready for Inspection JAMES POWERS
Drywall Nailing 10/21/2024 Not Ready for Inspection JAMES POWERS
Wood Frame 10/21/2024 Partial Approval JAMES POWERS
Drywall Nailing 10/25/2024 Partial Approval JAMES POWERS
Light Gage Steel Frame 10/25/2024 Not Ready for Inspection JAMES POWERS
Interior/Exterior Lathing 1/23/2025 Partial Approval JAMES POWERS
Drywall Nailing 1/31/2025 Partial Approval JAMES POWERS
Insulation 1/31/2025 Partial Approval JAMES POWERS
Drywall Nailing 2/5/2025 Partial Approval JAMES POWERS
Drywall Nailing 2/20/2025 Partial Approval ALFREDO LOPEZ
Drywall Nailing 2/24/2025 Not Ready for Inspection NICK DANERI
Light Gage Steel Frame 2/24/2025 Not Ready for Inspection NICK DANERI
Drywall Nailing 2/27/2025 Partial Approval JAMES POWERS
Green Building Rough 2/27/2025 Approved JAMES POWERS
Light Gage Steel Frame 2/27/2025 Partial Approval JAMES POWERS
METHANE-Rough 2/27/2025 Approved JAMES POWERS
Verify Sprinkler Sign Off 2/27/2025 Not Ready for Inspection JAMES POWERS
Wood Frame 2/27/2025 Partial Approval JAMES POWERS
Drywall Nailing 3/5/2025 Not Ready for Inspection JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 3/5/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 3/5/2025 Not Ready for Inspection JAMES POWERS
Verify Sprinkler Sign Off 3/5/2025 Not Ready for Inspection JAMES POWERS
Wood Frame 3/5/2025 Partial Approval JAMES POWERS
Deputy Wood Construction 3/14/2025 Partial Approval JAMES POWERS
Floor/Roof Diaphrgm/Shear Wall 3/17/2025 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 5/22/2025 Partial Approval JAMES POWERS
Masonry Wall/Backfill 6/4/2025 Partial Approval JAMES POWERS
Structural Steel Frame 6/11/2025 Partial Approval JAMES POWERS
Excavation/Setback/Form/Re-Bar 6/25/2025 Partial Approval JAMES POWERS
Structural Steel Frame 6/25/2025 Approved JAMES POWERS
Light Gage Steel Frame 9/24/2025 Partial Approval JAMES POWERS
Drywall Nailing 9/29/2025 Partial Approval JAMES POWERS
Light Gage Steel Frame 9/29/2025 Partial Approval JAMES POWERS
Drywall Nailing 10/2/2025 Partial Approval JAMES POWERS