Pre-Inspection
|
11/14/2023
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Deputy Grading
|
11/16/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Grading
|
11/17/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Pre-Inspection
|
11/20/2023
|
Approved
|
DAVID BURKHEAD
|
|
Deputy Grading
|
11/29/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
11/29/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
11/30/2023
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Concrete
|
12/1/2023
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
Excavation/Setback/Form/Re-Bar
|
12/1/2023
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Concrete
|
12/18/2023
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
12/18/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
12/19/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
12/19/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
12/19/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
12/29/2023
|
Approved
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
12/29/2023
|
Partial Approval
|
DAVID BURKHEAD
|
|
METHANE-Barrier
|
12/29/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Subgrade
|
12/29/2023
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
1/3/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
1/8/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Masonry Wall/Backfill
|
1/8/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Masonry Frame
|
1/8/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Deputy Shotcrete
|
1/10/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
1/11/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Reinforced Masonry Frame
|
1/11/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Deputy Shotcrete
|
1/12/2024
|
Conditional Approval
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
1/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
1/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
1/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
1/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
1/12/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Excavation/Setback/Form/Re-Bar
|
1/15/2024
|
Off-Hour Fees Due
|
|
|
Excavation/Setback/Form/Re-Bar
|
1/15/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Reinf. Concrete
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Shotcrete
|
1/16/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
1/19/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Drilled-In Anchors
|
1/30/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
1/31/2024
|
Conditional Approval
|
RAFAEL ESPINOZA
|
|
METHANE-Barrier
|
1/31/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
METHANE-Subgrade
|
1/31/2024
|
Not Ready for Inspection
|
RAFAEL ESPINOZA
|
|
Masonry Wall/Backfill
|
1/31/2024
|
Partial Approval
|
RAFAEL ESPINOZA
|
|
Deputy Reinf. Masonry
|
2/9/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
2/13/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Deputy Reinf. Masonry
|
2/14/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Excavation/Setback/Form/Re-Bar
|
2/16/2024
|
Partial Approval
|
GREGORY POMISH
|
|
Green Building Rough
|
2/16/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
METHANE-Rough
|
2/16/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Reinforced Concrete Frame
|
2/16/2024
|
Partial Inspection
|
GREGORY POMISH
|
|
Verify Sprinkler Sign Off
|
2/16/2024
|
Not Ready for Inspection
|
GREGORY POMISH
|
|
Deputy Reinf. Concrete
|
2/21/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Masonry Wall/Backfill
|
2/29/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Reinf. Concrete
|
3/13/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
3/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Barrier
|
3/13/2024
|
Approved
|
JEFFREY FULTON
|
|
METHANE-Subgrade
|
3/13/2024
|
Approved
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
3/14/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
3/20/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
3/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
3/22/2024
|
Partial Approval
|
JAMES POWERS
|
|
Deputy Drilled-In Anchors
|
3/26/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Footing/Foundation/Slab
|
3/29/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Deputy Reinf. Concrete
|
4/16/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Excavation/Setback/Form/Re-Bar
|
4/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Footing/Foundation/Slab
|
4/25/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Green Building Rough
|
4/25/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
4/25/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Reinforced Concrete Frame
|
4/25/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
4/25/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
5/31/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
6/17/2024
|
Conditional Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/17/2024
|
Corrections Issued
|
LARRY ARNICK
|
|
Deputy Wood Construction
|
6/18/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
6/18/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/1/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
7/2/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/2/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
7/17/2024
|
Conditional Approval
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/17/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Deputy Wood Construction
|
7/19/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/19/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Deputy Wood Construction
|
7/25/2024
|
Conditional Approval
|
MICHAEL ROSENBERG
|
|
Floor/Roof Diaphrgm/Shear Wall
|
7/30/2024
|
Partial Approval
|
EDWIN GREGORYONA
|
|
Insulation
|
8/21/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
8/23/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
8/23/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
8/23/2024
|
Corrections Issued
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
8/23/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
8/23/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
9/5/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Wood Frame
|
9/5/2024
|
Corrections Issued
|
DAVID BURKHEAD
|
|
Green Building Rough
|
9/6/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
9/6/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
9/6/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
9/6/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
9/9/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/10/2024
|
Partial Inspection
|
TIMOTHY POWELL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/13/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
9/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
9/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
9/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
9/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
9/17/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
9/19/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Green Building Rough
|
9/19/2024
|
Not Ready for Inspection
|
TIMOTHY POWELL
|
|
Special/Order Compliance
|
9/19/2024
|
Partial Inspection
|
TIMOTHY POWELL
|
|
METHANE-Rough
|
9/23/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
9/23/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
9/23/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
9/24/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Floor/Roof Diaphrgm/Shear Wall
|
9/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
9/25/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
9/27/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
9/30/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
9/30/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
9/30/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
9/30/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
9/30/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Insulation
|
10/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/1/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
10/2/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wall Anchors
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/2/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
10/4/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
10/4/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
10/4/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
10/4/2024
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
10/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/9/2024
|
Partial Approval
|
LARRY ARNICK
|
|
Green Building Rough
|
10/9/2024
|
Not Ready for Inspection
|
LARRY ARNICK
|
|
Wood Frame
|
10/10/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Floor/Roof Diaphrgm/Shear Wall
|
10/11/2024
|
Partial Approval
|
TIMOTHY POWELL
|
|
Insulation
|
10/15/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
10/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
10/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
10/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
10/16/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
10/16/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
10/21/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/25/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
10/25/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
10/30/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
10/30/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
11/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
11/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
11/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/6/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
11/7/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
11/7/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
11/7/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
11/7/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
12/12/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
12/12/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
12/13/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
12/13/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/13/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
12/18/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
12/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
12/18/2024
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
12/18/2024
|
Partial Inspection
|
JEFFREY FULTON
|
|
Green Building Rough
|
12/23/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
12/23/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Verify Sprinkler Sign Off
|
12/23/2024
|
Not Ready for Inspection
|
DAVID BURKHEAD
|
|
Wood Frame
|
12/23/2024
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Green Building Rough
|
1/2/2025
|
Approved
|
JEFFREY FULTON
|
|
METHANE-Rough
|
1/2/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
1/2/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/2/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/3/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
1/10/2025
|
Corrections Issued
|
JEFFREY FULTON
|
|
METHANE-Rough
|
1/10/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
1/10/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/10/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
1/16/2025
|
No Access for Inspection
|
RAMAZANALI ALMASI
|
|
Drywall Nailing
|
1/17/2025
|
Partial Approval
|
RAMAZANALI ALMASI
|
|
Insulation
|
1/22/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
1/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
1/22/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
1/22/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
1/27/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
1/27/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
1/27/2025
|
Partial Approval
|
JEFFREY FULTON
|
|
Wood Frame
|
1/27/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
1/29/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
2/3/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
2/3/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
2/4/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Insulation
|
2/4/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
METHANE-Rough
|
2/4/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Verify Sprinkler Sign Off
|
2/4/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Wood Frame
|
2/4/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
2/7/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Insulation
|
2/7/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
2/11/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/14/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
2/19/2025
|
Approved
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
2/25/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
T-Bar Ceiling
|
2/27/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
2/28/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
3/12/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Pre-Inspection
|
3/18/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
3/21/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/1/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Special/Order Compliance
|
4/2/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
4/9/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/16/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
5/23/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
6/6/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Interior/Exterior Lathing
|
6/17/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
7/1/2025
|
Not Ready for Inspection
|
JEFFREY FULTON
|
|
Light Gage Steel Frame
|
7/8/2025
|
Partial Inspection
|
DAVID BURKHEAD
|
|
Interior/Exterior Lathing
|
7/17/2025
|
Partial Approval
|
DAVID BURKHEAD
|
|
Special/Order Compliance
|
12/30/2025
|
Partial Inspection
|
JEFFREY FULTON
|
|
Drywall Nailing
|
2/18/2026
|
Partial Approval
|
DAVID BURKHEAD
|
|
Drywall Nailing
|
6/3/2026
|
Approved
|
DAVID BURKHEAD
|
|
Footing/Foundation/Slab
|
6/3/2026
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Final
|
6/3/2026
|
Approved
|
DAVID BURKHEAD
|
|
METHANE-Rough
|
6/3/2026
|
Approved
|
DAVID BURKHEAD
|
|
Pre-Inspection
|
6/3/2026
|
Partial Inspection
|
DAVID BURKHEAD
|
|
SGSOV-Seismic Gas S/O Valve
|
6/3/2026
|
SGSOV Approved
|
DAVID BURKHEAD
|