326 N ROBINSON ST 1-20 90026

Certificate Information: 326 N ROBINSON ST 1-20 90026

Application / Permit
22010-10000-00327
Plan Check / Job No.
B22LA01127
Group
Building
Type
Bldg-New
Sub-Type
Apartment
Primary Use
(5) Apartment
Work Description
ePLAN. NEW 5 STORY 20 UNITS (1 ELI AND 2 VLI) AFFORDABLE HOUSING APARTMENT TO INCLUDE 4 LEVELS OF TYPE VA APARTMENTS OVER 1 STORY TYPE IA APARTMENT / PARKING, TIER 1 TOC WITH ADDITIONAL INCENTIVE
Permit Issued
Issued on 11/9/2023
Issuing Office
Current Status
Issued on 11/9/2023
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 1/24/2022 APPLICANT
Assigned to Plan Check Engineer 2/3/2022 KEVIN MORALES
Corrections Issued 2/10/2022 KEVIN MORALES
Quality Review Completed 2/14/2022 EUGENE BARBEAU
Applicant returned to address corrections 3/8/2022 KEVIN MORALES
Plan Check Approved 4/4/2023 KEVIN MORALES
Issued 11/9/2023 APPLICANT

Permit Application Clearance Information

Address approval Cleared 5/3/2022 JEANIE LAM
Eng Process Fee Ord 176,300 Cleared 5/4/2022 JEANIE LAM
Hydrant and Access approval Cleared 5/20/2022 GILBERT URREA
Trees in Parkway Cleared 6/2/2022 ADALBERTO VERA
Highway dedication Cleared 6/23/2022 JEANIE LAM
Green Code Cleared 8/2/2022 AARON COSTA
Building over 36-ft Cleared 8/4/2022 CALOSHA APPROVED
Density Bonus 12.22.A.31 Cleared 8/23/2022 JAMES MCCARTHY
Miscellaneous Cleared 8/26/2022 STEVEN WECHSLER
Frnt yard landscape/Water mgmt Cleared 11/4/2022 NATHAN ROMINE
Miscellaneous Cleared 11/4/2022 NATHAN ROMINE
Opn space landscape/Water mgmt Cleared 11/4/2022 NATHAN ROMINE
Low Impact Development Cleared 11/15/2022 ANDRES COVARRUBIAS
Roof/Waste drainage to street Cleared 11/19/2022 ABEL CASILLAS
Bicycle Parking Cleared 11/28/2022 JEREMY CHOK
Fire Marshal Fire Life Safety Cleared 12/2/2022 MENOA AGHAJANI
GPI Written Notices Cleared 12/21/2022 KEVIN MORALES
Grading Pre-Inspection Cleared 12/21/2022 KEVIN MORALES
Sewer availability Cleared 3/20/2023 JEANIE LAM
Permit Cleared 3/22/2023 ABEL CASILLAS
DAS Clearance Cleared 3/24/2023 KEVIN MORALES

Contact Information

Contractor Mid Construction Group; Lic. No.: 1030925-B 5850 W 3RD STREET #160      LOS ANGELES, CA 90036
Engineer Babayan,, Raffi Samuel; Lic. No.: C72168 7718 DAY STREET      LOS ANGELES, CA 91042
Engineer Wang,, Guan; Lic. No.: C79702 135 N SAN GABRIEL BLVD      SAN GABRIEL, CA 91775
Engineer Zweigler,, Robert Ingraham; Lic. No.: GE2120 1461 E. CHEVY CHASE DR. #200      GLENDALE, CA 91206
Geologist Zweigler,, Robert Ingraham; Lic. No.: EG1210 196 DIRT ROAD      THOUSAND OAKS, CA 91361

Inspector Information

DAVID BURKHEAD, (213) 482-7294 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 11/14/2023 Corrections Issued DAVID BURKHEAD
Deputy Grading 11/16/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Grading 11/17/2023 Conditional Approval MICHAEL ROSENBERG
Pre-Inspection 11/20/2023 Approved DAVID BURKHEAD
Deputy Grading 11/29/2023 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 11/29/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 11/30/2023 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Concrete 12/1/2023 Conditional Approval RAFAEL ESPINOZA
Excavation/Setback/Form/Re-Bar 12/1/2023 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Concrete 12/18/2023 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 12/18/2023 Not Ready for Inspection DAVID BURKHEAD
Footing/Foundation/Slab 12/19/2023 Partial Approval DAVID BURKHEAD
METHANE-Barrier 12/19/2023 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 12/19/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 12/29/2023 Approved DAVID BURKHEAD
Footing/Foundation/Slab 12/29/2023 Partial Approval DAVID BURKHEAD
METHANE-Barrier 12/29/2023 Not Ready for Inspection DAVID BURKHEAD
METHANE-Subgrade 12/29/2023 Not Ready for Inspection DAVID BURKHEAD
Deputy Reinf. Concrete 1/3/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 1/8/2024 Conditional Approval DAVID BURKHEAD
Masonry Wall/Backfill 1/8/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Masonry Frame 1/8/2024 Not Ready for Inspection DAVID BURKHEAD
Deputy Shotcrete 1/10/2024 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 1/11/2024 Partial Approval GREGORY POMISH
Reinforced Masonry Frame 1/11/2024 Partial Approval GREGORY POMISH
Deputy Shotcrete 1/12/2024 Conditional Approval DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/12/2024 Not Ready for Inspection DAVID BURKHEAD
Green Building Rough 1/12/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 1/12/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 1/12/2024 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 1/12/2024 Not Ready for Inspection DAVID BURKHEAD
Excavation/Setback/Form/Re-Bar 1/15/2024 Off-Hour Fees Due
Excavation/Setback/Form/Re-Bar 1/15/2024 Partial Approval JAMES POWERS
Deputy Reinf. Concrete 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Shotcrete 1/16/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 1/19/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Drilled-In Anchors 1/30/2024 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 1/31/2024 Conditional Approval RAFAEL ESPINOZA
METHANE-Barrier 1/31/2024 Not Ready for Inspection RAFAEL ESPINOZA
METHANE-Subgrade 1/31/2024 Not Ready for Inspection RAFAEL ESPINOZA
Masonry Wall/Backfill 1/31/2024 Partial Approval RAFAEL ESPINOZA
Deputy Reinf. Masonry 2/9/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 2/13/2024 Conditional Approval MICHAEL ROSENBERG
Deputy Reinf. Masonry 2/14/2024 Conditional Approval MICHAEL ROSENBERG
Excavation/Setback/Form/Re-Bar 2/16/2024 Partial Approval GREGORY POMISH
Green Building Rough 2/16/2024 Not Ready for Inspection GREGORY POMISH
METHANE-Rough 2/16/2024 Partial Inspection GREGORY POMISH
Reinforced Concrete Frame 2/16/2024 Partial Inspection GREGORY POMISH
Verify Sprinkler Sign Off 2/16/2024 Not Ready for Inspection GREGORY POMISH
Deputy Reinf. Concrete 2/21/2024 Conditional Approval MICHAEL ROSENBERG
Masonry Wall/Backfill 2/29/2024 Partial Inspection JEFFREY FULTON
Deputy Reinf. Concrete 3/13/2024 Conditional Approval JEFFREY FULTON
Footing/Foundation/Slab 3/13/2024 Partial Inspection JEFFREY FULTON
METHANE-Barrier 3/13/2024 Approved JEFFREY FULTON
METHANE-Subgrade 3/13/2024 Approved JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 3/14/2024 Not Ready for Inspection JEFFREY FULTON
Footing/Foundation/Slab 3/20/2024 Not Ready for Inspection JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 3/21/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 3/22/2024 Partial Approval JAMES POWERS
Deputy Drilled-In Anchors 3/26/2024 Conditional Approval MICHAEL ROSENBERG
Footing/Foundation/Slab 3/29/2024 Partial Approval DAVID BURKHEAD
Deputy Reinf. Concrete 4/16/2024 Conditional Approval JEFFREY FULTON
Excavation/Setback/Form/Re-Bar 4/17/2024 Partial Inspection JEFFREY FULTON
Footing/Foundation/Slab 4/25/2024 Partial Approval DAVID BURKHEAD
Green Building Rough 4/25/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 4/25/2024 Not Ready for Inspection DAVID BURKHEAD
Reinforced Concrete Frame 4/25/2024 Partial Approval DAVID BURKHEAD
Verify Sprinkler Sign Off 4/25/2024 Not Ready for Inspection DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 5/31/2024 Partial Inspection JEFFREY FULTON
Deputy Wood Construction 6/17/2024 Conditional Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 6/17/2024 Corrections Issued LARRY ARNICK
Deputy Wood Construction 6/18/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 6/18/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/1/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Wood Construction 7/2/2024 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/2/2024 Corrections Issued JEFFREY FULTON
Deputy Wood Construction 7/17/2024 Conditional Approval JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 7/17/2024 Not Ready for Inspection JEFFREY FULTON
Deputy Wood Construction 7/19/2024 Partial Approval EDWIN GREGORYONA
Floor/Roof Diaphrgm/Shear Wall 7/19/2024 Partial Approval EDWIN GREGORYONA
Deputy Wood Construction 7/25/2024 Conditional Approval MICHAEL ROSENBERG
Floor/Roof Diaphrgm/Shear Wall 7/30/2024 Partial Approval EDWIN GREGORYONA
Insulation 8/21/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 8/23/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 8/23/2024 Not Ready for Inspection JEFFREY FULTON
Special/Order Compliance 8/23/2024 Corrections Issued JEFFREY FULTON
Verify Sprinkler Sign Off 8/23/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 8/23/2024 Partial Inspection JEFFREY FULTON
Insulation 9/5/2024 Partial Approval DAVID BURKHEAD
Wood Frame 9/5/2024 Corrections Issued DAVID BURKHEAD
Green Building Rough 9/6/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 9/6/2024 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/6/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 9/6/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 9/9/2024 Partial Approval DAVID BURKHEAD
Floor/Roof Diaphrgm/Shear Wall 9/10/2024 Partial Inspection TIMOTHY POWELL
Floor/Roof Diaphrgm/Shear Wall 9/13/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 9/16/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 9/16/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 9/16/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 9/16/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 9/17/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 9/19/2024 Partial Approval TIMOTHY POWELL
Green Building Rough 9/19/2024 Not Ready for Inspection TIMOTHY POWELL
Special/Order Compliance 9/19/2024 Partial Inspection TIMOTHY POWELL
METHANE-Rough 9/23/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 9/23/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 9/23/2024 Partial Inspection JEFFREY FULTON
Wood Frame 9/24/2024 Partial Inspection JEFFREY FULTON
Floor/Roof Diaphrgm/Shear Wall 9/25/2024 Partial Inspection JEFFREY FULTON
Insulation 9/25/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 9/27/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 9/30/2024 Not Ready for Inspection DAVID BURKHEAD
Insulation 9/30/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 9/30/2024 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 9/30/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 9/30/2024 Not Ready for Inspection DAVID BURKHEAD
Insulation 10/1/2024 Partial Inspection JEFFREY FULTON
Wood Frame 10/1/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 10/2/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 10/2/2024 Partial Inspection JEFFREY FULTON
METHANE-Rough 10/2/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 10/2/2024 Not Ready for Inspection JEFFREY FULTON
Wall Anchors 10/2/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 10/2/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 10/4/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 10/4/2024 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 10/4/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 10/4/2024 Partial Approval DAVID BURKHEAD
Drywall Nailing 10/9/2024 Partial Approval LARRY ARNICK
Floor/Roof Diaphrgm/Shear Wall 10/9/2024 Partial Approval LARRY ARNICK
Green Building Rough 10/9/2024 Not Ready for Inspection LARRY ARNICK
Wood Frame 10/10/2024 Partial Approval TIMOTHY POWELL
Floor/Roof Diaphrgm/Shear Wall 10/11/2024 Partial Approval TIMOTHY POWELL
Insulation 10/15/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 10/16/2024 Not Ready for Inspection JEFFREY FULTON
Insulation 10/16/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 10/16/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 10/16/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 10/16/2024 Partial Inspection JEFFREY FULTON
Insulation 10/21/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 10/25/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 10/25/2024 Not Ready for Inspection JEFFREY FULTON
Drywall Nailing 10/30/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 10/30/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 11/6/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 11/6/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 11/6/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 11/6/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 11/7/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 11/7/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 11/7/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 11/7/2024 Partial Inspection JEFFREY FULTON
Drywall Nailing 12/12/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 12/12/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 12/13/2024 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 12/13/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 12/13/2024 Not Ready for Inspection JEFFREY FULTON
Green Building Rough 12/18/2024 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 12/18/2024 Partial Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 12/18/2024 Not Ready for Inspection JEFFREY FULTON
Wood Frame 12/18/2024 Partial Inspection JEFFREY FULTON
Green Building Rough 12/23/2024 Not Ready for Inspection DAVID BURKHEAD
METHANE-Rough 12/23/2024 Not Ready for Inspection DAVID BURKHEAD
Verify Sprinkler Sign Off 12/23/2024 Not Ready for Inspection DAVID BURKHEAD
Wood Frame 12/23/2024 Partial Inspection DAVID BURKHEAD
Green Building Rough 1/2/2025 Approved JEFFREY FULTON
METHANE-Rough 1/2/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 1/2/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 1/2/2025 Partial Inspection JEFFREY FULTON
Wood Frame 1/3/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 1/10/2025 Corrections Issued JEFFREY FULTON
METHANE-Rough 1/10/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 1/10/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 1/10/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 1/16/2025 No Access for Inspection RAMAZANALI ALMASI
Drywall Nailing 1/17/2025 Partial Approval RAMAZANALI ALMASI
Insulation 1/22/2025 Partial Inspection JEFFREY FULTON
METHANE-Rough 1/22/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 1/22/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 1/22/2025 Partial Inspection JEFFREY FULTON
Insulation 1/27/2025 Partial Inspection JEFFREY FULTON
METHANE-Rough 1/27/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 1/27/2025 Partial Approval JEFFREY FULTON
Wood Frame 1/27/2025 Partial Inspection JEFFREY FULTON
Insulation 1/29/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/3/2025 Partial Inspection JEFFREY FULTON
Wood Frame 2/3/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/4/2025 Not Ready for Inspection JEFFREY FULTON
Insulation 2/4/2025 Not Ready for Inspection JEFFREY FULTON
METHANE-Rough 2/4/2025 Not Ready for Inspection JEFFREY FULTON
Verify Sprinkler Sign Off 2/4/2025 Not Ready for Inspection JEFFREY FULTON
Wood Frame 2/4/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/7/2025 Partial Inspection JEFFREY FULTON
Insulation 2/7/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/11/2025 Partial Approval DAVID BURKHEAD
Drywall Nailing 2/14/2025 Partial Approval DAVID BURKHEAD
Interior/Exterior Lathing 2/19/2025 Approved DAVID BURKHEAD
Drywall Nailing 2/25/2025 Partial Inspection JEFFREY FULTON
T-Bar Ceiling 2/27/2025 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 2/28/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/12/2025 Not Ready for Inspection JEFFREY FULTON
Pre-Inspection 3/18/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 3/21/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 4/1/2025 Partial Inspection JEFFREY FULTON
Special/Order Compliance 4/2/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 4/9/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 5/16/2025 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 5/23/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 6/6/2025 Partial Inspection JEFFREY FULTON
Interior/Exterior Lathing 6/17/2025 Partial Inspection JEFFREY FULTON
Light Gage Steel Frame 7/1/2025 Not Ready for Inspection JEFFREY FULTON
Light Gage Steel Frame 7/8/2025 Partial Inspection DAVID BURKHEAD
Interior/Exterior Lathing 7/17/2025 Partial Approval DAVID BURKHEAD
Special/Order Compliance 12/30/2025 Partial Inspection JEFFREY FULTON
Drywall Nailing 2/18/2026 Partial Approval DAVID BURKHEAD
Drywall Nailing 6/3/2026 Approved DAVID BURKHEAD
Footing/Foundation/Slab 6/3/2026 Approved DAVID BURKHEAD
METHANE-Final 6/3/2026 Approved DAVID BURKHEAD
METHANE-Rough 6/3/2026 Approved DAVID BURKHEAD
Pre-Inspection 6/3/2026 Partial Inspection DAVID BURKHEAD
SGSOV-Seismic Gas S/O Valve 6/3/2026 SGSOV Approved DAVID BURKHEAD