2154 S PATRICIA AVE 90025

Certificate Information: 2154 S PATRICIA AVE 90025

Application / Permit
22010-10000-00096
Plan Check / Job No.
B22LA00364
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 2 STORY ADU (793 SF) WITH GARAGE PER CA GOVT CODE 65852.2(E)(1)(B)
Permit Issued
Issued on 8/26/2024
Issuing Office
Metro
Current Status
CofO Issued on 4/28/2026
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 1/21/2022 APPLICANT
Assigned to Plan Check Engineer 2/17/2022 CRYSTEL MAALOUF
Corrections Issued 3/4/2022 STARR CHEN
Quality Review Completed 3/7/2022 EUGENE BARBEAU
Building Plans Picked Up 3/9/2022 APPLICANT
Applicant returned to address corrections 10/20/2022 STARR CHEN
Applicant returned to address corrections 3/1/2024 STARR CHEN
Applicant returned to address corrections 7/12/2024 STARR CHEN
Plan Check Approved 8/2/2024 STARR CHEN
Issued 8/26/2024 APPLICANT
CofO in Progress 4/28/2026 RYAN SALAZAR
Permit Finaled 4/28/2026 RICHARD STEINBACH
CofO Issued 4/28/2026 RICHARD STEINBACH
Permit Finaled 4/28/2026 RICHARD STEINBACH

Permit Application Clearance Information

Address approval Cleared 3/31/2022 JENSON LEE
Permit Cleared 3/31/2022 JENSON LEE
Construction near power lines Cleared 5/31/2022 RIDWAN HARDY
Hydrant and Access approval Cleared 10/29/2022 GILBERT URREA
Eng Process Fee Ord 176,300 Cleared 8/24/2023 DARIN LAM
Sewer availability Cleared 8/24/2023 DARIN LAM
Grading Pre-Inspection Cleared 10/24/2023 VASIL MIHALEV
Trees in Parkway Cleared 10/26/2023 ADALBERTO VERA
Miscellaneous Cleared 11/8/2023 JOSHUA JONES
Low Impact Development Cleared 12/26/2023 ROGELIO CORTES
Roof/Waste drainage to street Cleared 1/11/2024 DARIN LAM
GPI Written Notices Cleared 3/1/2024 STARR CHEN

Contact Information

Architect Mashihi,, Jacques; Lic. No.: C15922 10556 ASHTON AVENUE      LOS ANGELES, CA 90024
Contractor Owner-Builder       ,
Engineer Amoli,, Bahar Hosseini; Lic. No.: C94992 3221 CARTER AVE, APT 282      MARINA DEL REY, CA 90292
Engineer Berkoz,, Ertunga; Lic. No.: S2504 4665 ELLENITA AVE      TARZANA, CA 91356

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 2/19/2025 Partial Inspection STEPHANIE SWANSON
METHANE-Subgrade 7/10/2025 Partial Approval DANIEL VERA
Underground Mechanical 7/10/2025 Partial Approval DANIEL VERA
Deputy Methane Barrier 7/16/2025 Conditional Approval HAMIK HARTOUNIAN
Deputy Methane Barrier 7/17/2025 Conditional Approval MICHAEL PELHAM
Deputy Methane Barrier 7/22/2025 Conditional Approval DANIEL VERA
Footing/Foundation/Slab 7/30/2025 Partial Approval DANIEL VERA
METHANE-Barrier 7/30/2025 Not Ready for Inspection DANIEL VERA
METHANE-Subgrade 7/30/2025 Partial Approval DANIEL VERA
Deputy Steel/Welding 8/11/2025 Partial Approval DANIEL VERA
Footing/Foundation/Slab 8/12/2025 Approved MICHAEL ALLEN
METHANE-Barrier 8/12/2025 Approved MICHAEL ALLEN
METHANE-Subgrade 8/12/2025 Approved MICHAEL ALLEN
Deputy Reinf. Concrete 8/14/2025 Conditional Approval MICHAEL PELHAM
Floor/Roof Diaphrgm/Shear Wall 8/22/2025 Corrections Issued DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 8/26/2025 Partial Approval DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 9/8/2025 Corrections Issued DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 9/9/2025 Partial Approval EVAN COOPER
Pre-Inspection 9/15/2025 Approved DANIEL VERA
ELECTRICAL-Rough 10/16/2025 Not Ready for Inspection DANIEL VERA
METHANE-Rough 10/16/2025 Approved DANIEL VERA
PLUMBING-Rough 10/16/2025 Approved DANIEL VERA
ELECTRICAL-Rough 10/22/2025 Corrections Issued DANIEL VERA
Green Building Rough 10/22/2025 Not Ready for Inspection DANIEL VERA
HVAC-Rough 10/22/2025 Approved DANIEL VERA
BUILDING-Rough-Frame 10/29/2025 Not Ready for Inspection DANIEL VERA
ELECTRICAL-Rough 10/29/2025 Partial Approval DANIEL VERA
Floor/Roof Diaphrgm/Shear Wall 10/29/2025 Approved DANIEL VERA
Green Building Rough 10/29/2025 Not Ready for Inspection DANIEL VERA
Verify Sprinkler Sign Off 10/29/2025 Partial Inspection DANIEL VERA
Wood Frame 10/29/2025 Not Ready for Inspection DANIEL VERA
BUILDING-Rough-Frame 11/5/2025 Conditional Approval DANIEL VERA
Final 11/5/2025 Corrections Issued DANIEL VERA
Green Building Rough 11/5/2025 Approved DANIEL VERA
Interior/Exterior Lathing 11/5/2025 Not Ready for Inspection DANIEL VERA
Verify Sprinkler Sign Off 11/5/2025 Approved DANIEL VERA
Interior/Exterior Lathing 11/6/2025 Partial Approval DANIEL VERA
Insulation 11/26/2025 Approved DANIEL VERA
Drywall Nailing 12/9/2025 Approved SEAN HAUPT
Interior/Exterior Lathing 12/9/2025 Not Ready for Inspection SEAN HAUPT
Shower Pan 12/9/2025 Approved SEAN HAUPT
Interior/Exterior Lathing 12/30/2025 Approved DANIEL VERA
Underground Mechanical 1/16/2026 Approved DANIEL VERA
BUILDING-Rough-Frame 2/9/2026 Approved RYAN SALAZAR
ELECTRICAL-Final 2/9/2026 Corrections Issued RYAN SALAZAR
Final 2/9/2026 Corrections Issued RYAN SALAZAR
Green Building Final 2/9/2026 Not Ready for Inspection RYAN SALAZAR
HVAC-Final 2/9/2026 Corrections Issued RYAN SALAZAR
PLUMBING-Final 2/9/2026 Not Ready for Inspection RYAN SALAZAR
SGSOV-Seismic Gas S/O Valve 2/9/2026 SGSOV Not Ready RYAN SALAZAR
Service/Power Release 2/9/2026 Not Ready for Inspection RYAN SALAZAR
Smoke Detectors 2/9/2026 Approved RYAN SALAZAR
Structural Steel Frame 2/9/2026 Approved RYAN SALAZAR
Special/Order Compliance 2/13/2026 Corrections Issued RICHARD STEINBACH
Final 4/10/2026 Not Ready for Inspection RYAN SALAZAR
Green Building Final 4/10/2026 Not Ready for Inspection RYAN SALAZAR
SGSOV-Seismic Gas S/O Valve 4/10/2026 SGSOV Not Ready RYAN SALAZAR
Service/Power Release 4/10/2026 Not Ready for Inspection RYAN SALAZAR
Final 4/24/2026 OK to Issue CofO RYAN SALAZAR
Green Building Final 4/24/2026 Approved RYAN SALAZAR
SGSOV-Seismic Gas S/O Valve 4/24/2026 SGSOV Not Required RYAN SALAZAR
Service/Power Release 4/24/2026 Approved RYAN SALAZAR