18537 W TARZANA DR 91356

Certificate Information: 18537 W TARZANA DR 91356

Application / Permit
21047-20000-01532
Plan Check / Job No.
B21VN08531
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW 18' X 35' SWIMMING POOL AND 9' X 13' SPA PER STANDARD PLAN #268 AND ENGINEER DETAIL
Permit Issued
Issued on 10/29/2021
Issuing Office
Current Status
CofO Issued on 11/29/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/7/2021 APPLICANT
Assigned to Plan Check Engineer 7/8/2021 JEROME MAGAT PALMA
Corrections Issued 7/8/2021 JEROME MAGAT PALMA
Applicant returned to address corrections 10/27/2021 JEROME MAGAT PALMA
Plan Check Approved 10/28/2021 JEROME MAGAT PALMA
Issued 10/29/2021 APPLICANT
Building Plans Picked Up 11/3/2021 APPLICANT
CofO in Progress 11/29/2025 MICHAEL PELHAM
Permit Finaled 11/29/2025 MICHAEL PELHAM
CofO Issued 11/29/2025 MICHAEL PELHAM
Permit Finaled 11/29/2025 MICHAEL PELHAM

Permit Application Clearance Information

Grading Pre-Inspection Cleared 7/8/2021 JEROME MAGAT PALMA
ZA Case Cleared 8/3/2021 LAUREN PADICK
Construction near power lines Cleared 10/5/2021 RIDWAN HARDY

Contact Information

Contractor Pure Energy Inc; Lic. No.: 1066018-B 3915 BUDLONG AVE      LOS ANGELES, CA 90037
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

JOHN KIDWELL, (818) 774-4314 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 11/5/2021 Not Ready for Inspection DAVID SANDOVAL
Pre-Gunite 11/5/2021 Corrections Issued DAVID SANDOVAL
Excavation/Setback/Form/Re-Bar 11/12/2021 Approved DAVID SANDOVAL
Gas Piping or Gas Test 11/12/2021 Approved DAVID SANDOVAL
Pool Piping 11/12/2021 Approved DAVID SANDOVAL
Pre-Gunite 11/12/2021 Approved DAVID SANDOVAL
Rough-Electrical 11/12/2021 Approved DAVID SANDOVAL
Deputy Shotcrete 11/16/2021 Conditional Approval DAVID SANDOVAL
ELECTRICAL-Final 6/29/2022 Not Ready for Inspection DAVID SANDOVAL
Final 6/29/2022 Corrections Issued DAVID SANDOVAL
PLUMBING-Final 6/29/2022 Not Ready for Inspection DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 6/29/2022 SGSOV Not Ready DAVID SANDOVAL
Deck 7/19/2022 Approved PETER FOLLING
SGSOV-Seismic Gas S/O Valve 7/19/2022 SGSOV Not Ready PETER FOLLING
Equipment Noise Level 10/13/2022 Approved ALFREDO FLORES
SGSOV-Seismic Gas S/O Valve 10/18/2022 SGSOV Not Ready DAVID SANDOVAL
Enclosure/Fence 11/7/2022 Corrections Issued DAVID SANDOVAL
SGSOV-Seismic Gas S/O Valve 11/7/2022 SGSOV Approved DAVID SANDOVAL
Enclosure/Fence 5/17/2023 Approved SEAN HAUPT
Final 5/17/2023 Corrections Issued SEAN HAUPT
Final 11/29/2025 OK to Issue CofO MICHAEL PELHAM