9607 W CRESTA DR 90035

Certificate Information: 9607 W CRESTA DR 90035

Application / Permit
21047-10000-02702
Plan Check / Job No.
B21LA23151
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW SWIMMING POOL & SPA PER ENGINEER DESIGN AND STANDART PLAN #270 W/ CMU WALL ACTING AS A WATERFALL.
Permit Issued
Issued on 7/25/2022
Issuing Office
Metro
Current Status
CofO Issued on 8/3/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 12/10/2021 APPLICANT
Assigned to Plan Check Engineer 12/22/2021 SERGIO GUTIERREZ
Corrections Issued 12/28/2021 SERGIO GUTIERREZ
Quality Review Completed 12/30/2021 FARUK SEZER
Building Plans Picked Up 1/6/2022 APPLICANT
Plan Check Approved 7/25/2022 SERGIO GUTIERREZ
Issued 7/25/2022 APPLICANT
CofO in Progress 7/28/2023 DAVID FEILER
Permit Finaled 8/3/2023 DANIEL ORRANTE
CofO Issued 8/3/2023 DANIEL ORRANTE
Permit Finaled 8/3/2023 DANIEL ORRANTE

Permit Application Clearance Information

Construction within easement Cleared 3/15/2022 TINA MIRANDA
Grading Pre-Inspection Cleared 7/25/2022 SERGIO GUTIERREZ

Contact Information

Architect Rezvani,, Farbod; Lic. No.: C32315 9055 ALCOTT STREET #1      LOS ANGELES, CA 90035
Contractor Di Nalli Construction; Lic. No.: 942979-B 9055 ALCOTT STREET #1      LOS ANGELES, CA 90035
Engineer Cristescu,, Barbu D; Lic. No.: C72038 14401 SYLVAN STREET 209      VAN NUYS, CA 91401

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 10/14/2022 Not Ready for Inspection OGANES TARAKHCHYAN
Pre-Gunite 10/26/2022 Not Ready for Inspection OGANES TARAKHCHYAN
Pre-Gunite 11/10/2022 Approved OGANES TARAKHCHYAN
Deputy Shotcrete 11/17/2022 Partial Approval OGANES TARAKHCHYAN
Grounding or Bonding 2/21/2023 Corrections Issued ASHLEY THOMPSON
Deck 2/23/2023 Approved EVAN COOPER
Gas Piping or Gas Test 3/29/2023 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Gas Piping or Gas Test 5/2/2023 Corrections Issued CLAYTON GRAHAM
Grounding or Bonding 5/2/2023 Not Ready for Inspection CLAYTON GRAHAM
Gas Piping or Gas Test 5/5/2023 Approved CLAYTON GRAHAM
Grounding or Bonding 5/5/2023 Not Ready for Inspection CLAYTON GRAHAM
Deck 5/11/2023 Approved CLAYTON GRAHAM
Enclosure/Fence 5/30/2023 No Access for Inspection CLAYTON GRAHAM
Enclosure/Fence 5/31/2023 Approved JEREMY TODD
Pool Equipment Noise Test 6/27/2023 Not Ready for Inspection ZEYDI STEWART
Equipment Noise Level 7/14/2023 No Access for Inspection ANDEY CHAPARRO
Pool Equipment Noise Test 7/20/2023 Approved ZEYDI STEWART
SGSOV-Seismic Gas S/O Valve 7/25/2023 SGSOV Not Ready CLAYTON GRAHAM
Excavation/Setback/Form/Re-Bar 7/27/2023 Approved BRENDAN LOONEY
Final 7/27/2023 Conditional Approval BRENDAN LOONEY
SGSOV-Seismic Gas S/O Valve 7/27/2023 SGSOV Approved BRENDAN LOONEY