1026 N CORSICA DR 90272

Certificate Information: 1026 N CORSICA DR 90272

Application / Permit
21047-10000-00647
Plan Check / Job No.
B21LA05332
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW POOL 34'-10" BY 19', 6' DEEP (SURFACE AREA 662 SQFT) NEW SPA (FLUSHED INSIDE POOL) 9' BY 9' STANDARD PLAN #268 WITH ADDITIONAL DETAIL PER ENGINEER.
Permit Issued
Issued on 5/25/2021
Issuing Office
Current Status
CofO Issued on 6/15/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 3/29/2021 APPLICANT
Assigned to Plan Check Engineer 3/30/2021 CRISTINA SALAZAR
Plan Check Approved 5/17/2021 LUIS RINCON
Building Plans Picked Up 5/18/2021 APPLICANT
Issued 5/25/2021 APPLICANT
CofO in Progress 6/15/2023 KENNETH NAGLE
Permit Finaled 6/15/2023 DANIEL ORRANTE
Permit Finaled 6/15/2023 DANIEL ORRANTE
CofO Issued 6/15/2023 DANIEL ORRANTE

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Intex Design And Construction Inc; Lic. No.: 981718-C53 2646 DUPONT DR STE 60 #348      IRVINE, CA 92612
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 12/1/2021 Approved JOHN KIDWELL
Rough-Electrical 12/1/2021 Approved JOHN KIDWELL
Rough-Plumbing 12/1/2021 Approved JOHN KIDWELL
Deputy Other (see comments) 12/7/2021 Partial Approval JOHN KIDWELL
Deck 4/7/2022 Approved OGANES TARAKHCHYAN
Grounding or Bonding 4/7/2022 Approved OGANES TARAKHCHYAN
Pool Equipment Noise Test 10/14/2022 Approved AGUSTIN ALVAREZMORALES
SGSOV-Seismic Gas S/O Valve 4/14/2023 SGSOV Not Ready OGANES TARAKHCHYAN
Excavation/Setback/Form/Re-Bar 4/18/2023 Not Ready for Inspection OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 4/18/2023 SGSOV Not Ready OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 6/5/2023 SGSOV Not Ready OGANES TARAKHCHYAN
Pool Equipment Noise Test 6/6/2023 Approved JAMES VORHIS
Excavation/Setback/Form/Re-Bar 6/14/2023 Approved OGANES TARAKHCHYAN
Final 6/14/2023 OK to Issue CofO OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 6/14/2023 SGSOV Approved OGANES TARAKHCHYAN