956 N CHANTILLY ROAD 90077

Certificate Information: 956 N CHANTILLY ROAD 90077

Application / Permit
21047-10000-00603
Plan Check / Job No.
B21LA04996
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
POOL REMODEL WITH SPLIT MAIN DRAIN. NEW POOL 14' X 36' (FLUSHED INSIDE EXISTING POOL SHELL) NEW SPA 7.5' BY 7.5' WITH THE (E) POOL SHELL (INSIDE EXISTING/NEW POOL) PER STANDARD PLAN, WITH DETAILS 551, 640, AND 672.
Permit Issued
Issued on 9/14/2021
Issuing Office
Current Status
Issued on 9/14/2021
Certificate of Occupancy
Pending More Information

Permit Application Status History

Submitted 3/18/2021 APPLICANT
Assigned to Plan Check Engineer 3/19/2021 FERNANDO FLORES
Corrections Issued 3/20/2021 FERNANDO FLORES
Applicant returned to address corrections 6/1/2021 LUIS RINCON
Applicant returned to address corrections 7/1/2021 LUIS RINCON
Applicant returned to address corrections 8/20/2021 LUIS RINCON
Plan Check Approved 8/23/2021 LUIS RINCON
Plan Check Approved 8/25/2021 LUIS RINCON
Building Plans Picked Up 8/31/2021 APPLICANT
Issued 9/14/2021 APPLICANT

Permit Application Clearance Information

Grading Pre-Inspection Cleared 5/7/2021 KIRK LINKLATER

Contact Information

Contractor Intex Design And Construction Inc; Lic. No.: 981718-B 2646 DUPONT DR STE 60 #348      IRVINE, CA 92612
Engineer Biedenbach,, Christopher James; Lic. No.: C74003 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

RYAN SALAZAR, (310) 914-3862 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Gunite 11/15/2021 Corrections Issued CHRISTOPHER WILSON
Gas Piping or Gas Test 11/17/2021 Partial Approval CHRISTOPHER WILSON
Grounding or Bonding 11/17/2021 Partial Approval CHRISTOPHER WILSON
Pool Piping 11/17/2021 Approved CHRISTOPHER WILSON
Pre-Gunite 11/17/2021 Approved CHRISTOPHER WILSON
Rough-Electrical 11/17/2021 Partial Approval CHRISTOPHER WILSON
Rough-Plumbing 11/17/2021 Partial Approval CHRISTOPHER WILSON
Deputy Shotcrete 12/3/2021 Conditional Approval CHRISTOPHER WILSON
Excavation/Setback/Form/Re-Bar 1/25/2022 Corrections Issued GERMAN RODRIGUEZ MENDOZA
Grounding or Bonding 5/31/2022 Corrections Issued CHRISTOPHER WILSON
Deck 6/2/2022 Approved CHRISTOPHER WILSON
Grounding or Bonding 6/2/2022 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 7/22/2022 Partial Approval CHRISTOPHER WILSON
Enclosure/Fence 7/27/2022 No Access for Inspection CHRISTOPHER WILSON
Pre-Inspection 8/18/2022 Partial Approval CHRISTOPHER WILSON
Pre-Inspection 8/23/2022 Partial Approval CHRISTOPHER WILSON
Enclosure/Fence 9/13/2022 Not Ready for Inspection CHRISTOPHER WILSON
Enclosure/Fence 9/27/2022 Approved CHRISTOPHER WILSON
Equipment Noise Level 11/29/2022 Approved ZEYDI STEWART