428 N GREENCRAIG ROAD 90049

Certificate Information: 428 N GREENCRAIG ROAD 90049

Application / Permit
21047-10000-00338
Plan Check / Job No.
B21LA02755
Group
Building
Type
Swimming-Pool/Spa
Sub-Type
1 or 2 Family Dwelling
Primary Use
(20) Pool/Spa - Private
Work Description
NEW IRR SHAPED POOL PER LA CITY STANDARD PLAN No. 268 AND ENG DETAIL No. 271-60
Permit Issued
Issued on 9/30/2021
Issuing Office
Current Status
CofO Issued on 5/26/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 2/18/2021 APPLICANT
Assigned to Plan Check Engineer 2/27/2021 SAMUEL GONZALEZ
Corrections Issued 2/27/2021 SAMUEL GONZALEZ
Applicant returned to address corrections 6/23/2021 LUISANGEL VALENZUELA
Applicant returned to address corrections 7/26/2021 LUISANGEL VALENZUELA
Applicant returned to address corrections 8/17/2021 LUISANGEL VALENZUELA
Issued 9/30/2021 APPLICANT
Building Plans Picked Up 10/1/2021 APPLICANT
CofO in Progress 5/26/2022 DANIEL ORRANTE
Permit Finaled 5/26/2022 DANIEL ORRANTE
CofO Issued 5/26/2022 DANIEL ORRANTE
Permit Finaled 5/26/2022 DANIEL ORRANTE

Permit Application Clearance Information

Construction near power lines Cleared 6/12/2021 RIDWAN HARDY
Grading Pre-Inspection Cleared 6/22/2021 SAMUEL GONZALEZ

Contact Information

Contractor Intex Design And Construction Inc; Lic. No.: 981718-C53 2646 DUPONT DR STE 60 #348      IRVINE, CA 92612
Engineer Lacher,, Todd Lee; Lic. No.: C67656 1201 N TUSTIN AVE      ANAHEIM, CA 92807

Inspector Information

No Data Available.

Pending Inspections

No Data Available.

Inspection Request History

FLOOD-Proofing Certificate 2/7/2022 Approved KENNETH NAGLE
Gas Piping or Gas Test 2/7/2022 Approved KENNETH NAGLE
Pre-Gunite 2/7/2022 Approved KENNETH NAGLE
Rough-Plumbing 2/7/2022 Approved KENNETH NAGLE
Deputy Shotcrete 2/10/2022 No Result Entered DANNY TOLENTINO
Grounding or Bonding 3/8/2022 Approved JUAN VALENZUELA
Enclosure/Fence 3/14/2022 Corrections Issued JUAN VALENZUELA
Pre-Inspection 3/14/2022 Partial Inspection JUAN VALENZUELA
Enclosure/Fence 4/6/2022 Approved JUAN VALENZUELA
Pool Equipment Noise Test 4/19/2022 Approved AGUSTIN ALVAREZMORALES
Excavation/Setback/Form/Re-Bar 5/2/2022 Approved JUAN VALENZUELA
FLOOD-Elevation Certificate 5/2/2022 Approved JUAN VALENZUELA
Final 5/2/2022 Corrections Issued JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 5/2/2022 SGSOV Approved JUAN VALENZUELA
Final 5/10/2022 Conditional Approval JUAN VALENZUELA