116 N LORENA ST 49 90063
Certificate Information: 116 N LORENA ST 49 90063
- Application / Permit
- 21020-10001-01093
- Plan Check / Job No.
- B22LA09080
- Group
- Building
- Type
- Nonbldg-Alter/Repair
- Sub-Type
- Commercial
- Primary Use
- (23) Shoring (Temporary)
- Work Description
- Supplemental permit to 21020-10000-01093 to revise shoring piles design by using approved sloped cut method to reduce the effective retained soil heights.
- Permit Issued
- Issued on 6/8/2022
- Issuing Office
- Metro
- Current Status
- Permit Finaled on 2/20/2025
Permit Application Status History
| Submitted | 5/13/2022 | APPLICANT |
| Assigned to Plan Check Engineer | 5/19/2022 | KESETE HAREGOT |
| Corrections Issued | 5/24/2022 | KESETE HAREGOT |
| Quality Review Completed | 5/24/2022 | RODOLFO ARIAS |
| Building Plans Picked Up | 5/27/2022 | APPLICANT |
| Plan Check Approved | 6/7/2022 | RODOLFO ARIAS |
| Issued | 6/8/2022 | APPLICANT |
| Permit Finaled | 2/20/2025 | RAFAEL CORTES |
Permit Application Clearance Information
| Work Adjacent to Public Way | Cleared | 5/26/2022 | BOK GOH |
| Eng Process Fee Ord 176,300 | Cleared | 6/2/2022 | TREVOR QUAN |
Contact Information
| Architect | Barar,, Ali; Lic. No.: C25584 | 624 SOUTH ORANGE GROVE BLVD. PASADENA, CA 91105 |
| Architect | Drake,, Harry Roberts; Lic. No.: C14869 | 2697 WAYWARD COURT BREA, CA 92821 |
| Contractor | Portrait Construction Inc; Lic. No.: 977636-B | 265 N JOY STREET #200 CORONA, CA 92879 |
| Engineer | Aoanan,, Virgilio Cendana; Lic. No.: C36079 | 1041 S GARFIELD AVE STE #210 ALHAMBRA, CA 91801 |
| Engineer | Choi,, David; Lic. No.: S4784 | 1327 LOMA AVENUE LONG BEACH, CA 90804 |
| Engineer | Zen,, Petrina; Lic. No.: C87489 | 905 PIEDMONT IRVINE, CA 92620 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Grading Pre-Inspection | 6/14/2022 | Partial Inspection | RAFAEL ESPINOZA |
| Piling/Pier/Caisson | 6/14/2022 | Partial Approval | RAFAEL ESPINOZA |
| Pre-Inspection | 6/14/2022 | Approved | RAFAEL ESPINOZA |
| Deputy Grading | 10/13/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Piling/Pier/Caisson | 10/13/2022 | Partial Inspection | RAFAEL ESPINOZA |
| Deputy Grading | 10/14/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Steel/Welding | 10/14/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Steel/Welding | 10/18/2022 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Grading | 10/28/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Concrete | 10/28/2022 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Shotcrete | 2/10/2023 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 2/14/2023 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Concrete | 2/17/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Concrete | 2/21/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Concrete | 2/22/2023 | Conditional Approval | NICK DANERI |
| Deputy Reinf. Concrete | 2/23/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Shotcrete | 2/23/2023 | Conditional Approval | MICHAEL ROSENBERG |
| Deputy Reinf. Concrete | 10/12/2023 | Conditional Approval | RAFAEL ESPINOZA |
| Deputy Reinf. Masonry | 10/12/2023 | Conditional Approval | RAFAEL ESPINOZA |
| Final | 2/20/2025 | Permit Finaled | RAFAEL CORTES |