679 W AVENUE 28 90065
Certificate Information: 679 W AVENUE 28 90065
- Application / Permit
- 21016-90000-56345
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Reroof with 22 sqrs COMP SHINGLE roofing over new solid sheathing. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). Replace 3 window(s). Same size, location, number, type. Sandblast/restucco over existing stucco to remain. Area = 216 sqft. Interior bathroom remodel/repair (no changes in walls or openings).
- Permit Issued
- Issued on 12/2/2021
- Issuing Office
- Current Status
- Permit Finaled on 6/10/2022
Permit Application Status History
| Issued | 12/2/2021 | INTERNET PERMIT |
| Permit Finaled | 6/9/2022 | OSVALDO PARAMO |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Vicsinc.Com; Lic. No.: 1002544-B | P O BOX 950931 MISSION HILLS, CA 91395 |
Inspector Information
| OSVALDO PARAMO, (213) 202-9854 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| ELECTRICAL-Rough | 12/9/2021 | Corrections Issued | OSVALDO PARAMO |
| Floor/Roof Diaphrgm/Shear Wall | 12/9/2021 | No Access for Inspection | OSVALDO PARAMO |
| PLUMBING-Rough | 12/9/2021 | Not Ready for Inspection | OSVALDO PARAMO |
| BUILDING-Rough-Frame | 12/14/2021 | Not Ready for Inspection | OSVALDO PARAMO |
| Floor/Roof Diaphrgm/Shear Wall | 12/17/2021 | Approved | OSVALDO PARAMO |
| PLUMBING-Rough | 12/21/2021 | No Access for Inspection | OSVALDO PARAMO |
| ELECTRICAL-Rough | 12/29/2021 | Not Ready for Inspection | CHRIS CHRISTENSEN |
| Interior/Exterior Lathing | 12/29/2021 | Partial Approval | CHRIS CHRISTENSEN |
| PLUMBING-Rough | 12/29/2021 | Not Ready for Inspection | CHRIS CHRISTENSEN |
| BUILDING-Rough-Frame | 1/3/2022 | Approved | STUART CHAPMAN |
| ELECTRICAL-Rough | 1/3/2022 | Approved | STUART CHAPMAN |
| HVAC-Rough | 1/3/2022 | Approved | STUART CHAPMAN |
| PLUMBING-Rough | 1/3/2022 | Approved | STUART CHAPMAN |
| Drywall Nailing | 1/5/2022 | Corrections Issued | AMY COLIN |
| Pre-Inspection | 4/9/2022 | Approved | STUART CHAPMAN |
| Final | 6/9/2022 | Permit Finaled | OSVALDO PARAMO |