978 N HYPERION AVE 90029
Certificate Information: 978 N HYPERION AVE 90029
- Application / Permit
- 21016-90000-32681
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- Reroof with 7 sqrs COMP SHINGLE roofing over new solid sheathing. Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). Replace 3 window(s). Same size, location, number, type. Interior kitchen remodel/repair (no changes in walls or openings). Interior bathroom remodel/repair (no changes in walls or openings).
- Permit Issued
- Issued on 9/30/2021
- Issuing Office
- Current Status
- Permit Finaled on 7/21/2022
Permit Application Status History
| Issued | 9/30/2021 | INTERNET PERMIT |
| Permit Finaled | 7/21/2022 | ALIZAH MAYAGOITIA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Pacific Construction Enterprises; Lic. No.: 791355-B | 3719 S ROBERTSON BLVD. CULVER CITY, CA 90232 |
Inspector Information
| FREDDIE RIVERA, (213) 202-3437 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 10/4/2021 | Approved | FREDDIE RIVERA |
| Floor/Roof Diaphrgm/Shear Wall | 11/15/2021 | Approved | ROBERT VORHIS |
| Shower Pan | 11/15/2021 | Corrections Issued | ROBERT VORHIS |
| Shower Pan | 11/15/2021 | Not Ready for Inspection | ROBERT VORHIS |
| PLUMBING-Rough | 11/23/2021 | Approved | ROBERT VORHIS |
| Shower Pan | 11/23/2021 | Approved | ROBERT VORHIS |
| ELECTRICAL-Rough | 12/6/2021 | Approved | STUART CHAPMAN |
| HVAC-Rough | 12/6/2021 | Approved | STUART CHAPMAN |
| Gas Test | 7/7/2022 | Not Ready for Inspection | ALIZAH MAYAGOITIA |
| PLUMBING-Final | 7/7/2022 | Approved | ALIZAH MAYAGOITIA |
| ELECTRICAL-Final | 7/11/2022 | Corrections Issued | FREDDIE RIVERA |
| HVAC-Final | 7/11/2022 | Corrections Issued | FREDDIE RIVERA |
| ELECTRICAL-Final | 7/19/2022 | Corrections Issued | FREDDIE RIVERA |
| ELECTRICAL-Final | 7/21/2022 | Approved | ALIZAH MAYAGOITIA |
| Final | 7/21/2022 | Permit Finaled | ALIZAH MAYAGOITIA |
| HVAC-Final | 7/21/2022 | Approved | ALIZAH MAYAGOITIA |