6214 S EILEEN AVE 90043
Certificate Information: 6214 S EILEEN AVE 90043
- Application / Permit
- 21016-90000-06010
- Plan Check / Job No.
- --
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Replace 11 window(s). Same size, location, number, type. Replace 8 door(s). Same size, location, number, type. Interior kitchen remodel/repair (no changes in walls or openings). Interior bathroom remodel/repair (no changes in walls or openings).
- Permit Issued
- Issued on 3/9/2021
- Issuing Office
- Current Status
- Issued on 3/9/2021
Permit Application Status History
| Issued | 3/9/2021 | INTERNET PERMIT |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | C C S Design And Construction Inc; Lic. No.: 781628-B | 4333 ADMIRALTY WAY MARINA DEL REY, CA 90292 |
Inspector Information
| SALVADOR MARTINEZ, (213) 202-3479 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| ELECTRICAL-Rough | 7/17/2021 | Corrections Issued | RICHARD ROBLES |
| HVAC-Rough | 7/17/2021 | Corrections Issued | RICHARD ROBLES |
| PLUMBING-Rough | 7/17/2021 | Corrections Issued | RICHARD ROBLES |
| ELECTRICAL-Rough | 8/5/2021 | Not Ready for Inspection | JOAQUIN GREENOUGH |
| Gas Test | 8/5/2021 | Corrections Issued | JOAQUIN GREENOUGH |
| Insulation | 8/5/2021 | Corrections Issued | JOAQUIN GREENOUGH |
| PLUMBING-Rough | 8/5/2021 | Not Ready for Inspection | JOAQUIN GREENOUGH |
| ELECTRICAL-Rough | 8/10/2021 | Approved | FREDDIE RIVERA |
| Insulation | 8/10/2021 | Not Ready for Inspection | FREDDIE RIVERA |
| PLUMBING-Rough | 8/10/2021 | Corrections Issued | FREDDIE RIVERA |
| HVAC-Rough | 8/13/2021 | Approved | FREDDIE RIVERA |
| Insulation | 8/13/2021 | Approved | FREDDIE RIVERA |
| PLUMBING-Rough | 8/13/2021 | Approved | FREDDIE RIVERA |
| Drywall Nailing | 8/24/2021 | Approved | FREDDIE RIVERA |
| Interior/Exterior Lathing | 8/24/2021 | Approved | FREDDIE RIVERA |
| Shower Pan | 8/24/2021 | Corrections Issued | FREDDIE RIVERA |
| Shower Pan | 8/26/2021 | Approved | JESUS PINEDA |
| ELECTRICAL-Final | 12/17/2021 | Approved | FREDDIE RIVERA |
| Final | 12/17/2021 | Not Ready for Inspection | FREDDIE RIVERA |
| HVAC-Final | 12/17/2021 | Corrections Issued | FREDDIE RIVERA |
| PLUMBING-Final | 12/17/2021 | Approved | FREDDIE RIVERA |