2005 W 96TH ST 90047

Certificate Information: 2005 W 96TH ST 90047

Application / Permit
21016-30000-22719
Plan Check / Job No.
B21WL03805
Group
Building
Type
Bldg-Addition
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) 20'-2" X 20'-2" DETACHED GARAGE INTO A (N) ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). ADD 3' X 6'-4" FOR EXTERIOR LAUNDRY ROOM. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 7/5/2022
Issuing Office
Current Status
CofO Issued on 10/2/2025
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 8/28/2021 APPLICANT
Assigned to Plan Check Engineer 9/7/2021 RAPHAEL ROSAS
Corrections Issued 9/7/2021 RAPHAEL ROSAS
Applicant returned to address corrections 1/26/2022 RAPHAEL ROSAS
Applicant returned to address corrections 2/27/2022 RAPHAEL ROSAS
Plan Check Approved 3/28/2022 RAPHAEL ROSAS
Building Plans Picked Up 3/30/2022 APPLICANT
Issued 7/5/2022 APPLICANT
CofO in Progress 9/25/2025 SALVADOR MARTINEZ
Permit Finaled 10/2/2025 DEROLD HAUFF
CofO Issued 10/2/2025 DEROLD HAUFF
Permit Finaled 10/2/2025 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 12/10/2021 CHRISTOPHER ROCHA
Roof/Waste drainage to street Cleared 12/10/2021 CHRISTOPHER ROCHA
Sewer availability Cleared 12/10/2021 CHRISTOPHER ROCHA
Construction near power lines Cleared 3/15/2022 RIDWAN HARDY
Eng Process Fee Ord 176,300 Cleared 6/29/2022 CHRISTOPHER ROCHA

Contact Information

Contractor Owner-Builder       ,
Engineer Truong,, Phong; Lic. No.: C70784 20439 E CRESTLINE DRIVE      WALNUT, CA 91789

Inspector Information

SALVADOR MARTINEZ, (213) 202-3479 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 1/20/2023 Approved ENRIQUE MIRELES
Excavation/Setback/Form/Re-Bar 2/10/2023 Approved ENRIQUE MIRELES
ELECTRICAL-Rough 3/18/2024 Approved ALIZAH MAYAGOITIA
PLUMBING-Rough 3/18/2024 Approved ALIZAH MAYAGOITIA
Rough-Elec/Plmb/HVAC 4/18/2024 Corrections Issued JOSE MACIAS
Wood Frame 4/18/2024 Corrections Issued JOSE MACIAS
Interior/Exterior Lathing 3/20/2025 Corrections Issued JOSE MACIAS
Underground Mechanical 3/20/2025 Approved JOSE MACIAS
Floor/Roof Diaphrgm/Shear Wall 3/28/2025 Corrections Issued JOSE MACIAS
Interior/Exterior Lathing 4/9/2025 Conditional Approval WAYNE REGESTER
Insulation 4/16/2025 Approved WAYNE REGESTER
Shower Pan 4/16/2025 Approved WAYNE REGESTER
Drywall Nailing 5/2/2025 Approved ANTHONY RAMOS
Interior/Exterior Lathing 5/2/2025 Approved ANTHONY RAMOS
BUILDING-Rough-Frame 7/24/2025 Approved WAYNE REGESTER
Final 7/24/2025 Corrections Issued WAYNE REGESTER
Footing/Foundation/Slab 7/24/2025 Approved WAYNE REGESTER
Green Building Final 7/24/2025 Corrections Issued WAYNE REGESTER
Green Building Rough 7/24/2025 Approved WAYNE REGESTER
METHANE-Barrier 7/24/2025 Approved WAYNE REGESTER
METHANE-Final 7/24/2025 Approved WAYNE REGESTER
METHANE-Rough 7/24/2025 Approved WAYNE REGESTER
METHANE-Subgrade 7/24/2025 Approved WAYNE REGESTER
SGSOV-Seismic Gas S/O Valve 7/24/2025 SGSOV Not Ready WAYNE REGESTER
Smoke Detectors 7/24/2025 Approved WAYNE REGESTER
Final 8/29/2025 Corrections Issued SALVADOR MARTINEZ
Green Building Final 8/29/2025 Approved SALVADOR MARTINEZ
SGSOV-Seismic Gas S/O Valve 8/29/2025 SGSOV Not Ready SALVADOR MARTINEZ
Final 9/5/2025 Corrections Issued SALVADOR MARTINEZ
SGSOV-Seismic Gas S/O Valve 9/5/2025 SGSOV Approved SALVADOR MARTINEZ
Final 9/15/2025 Corrections Issued BARRY HACHE
Service/Power Release 9/15/2025 Not Ready for Inspection BARRY HACHE
Final 9/24/2025 OK to Issue CofO SALVADOR MARTINEZ
Service/Power Release 9/24/2025 Approved SALVADOR MARTINEZ