3211 N OAKDELL ROAD 91604

Certificate Information: 3211 N OAKDELL ROAD 91604

Application / Permit
21016-30000-14828
Plan Check / Job No.
B21WL02531
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Supplemental to PCIS# 21016-30000-07352 interior remodel of existing 1 story 4 bedroom, 4 bath house with powder room: - new ceiling and baninets at kitchen - bedroom remodle - remodel existing powder room into wet bar - remodel existing pool bath into bath and new powder room - new tankless water heater
Permit Issued
Issued on 8/19/2021
Issuing Office
West Los Angeles
Current Status
Permit Finaled on 7/14/2022

Permit Application Status History

Submitted 6/8/2021 APPLICANT
Assigned to Plan Check Engineer 6/10/2021 KAVIAN REFAHI
Corrections Issued 6/12/2021 KAVIAN REFAHI
Plan Check Approved 7/28/2021 ALFREDO JARA
Issued 8/19/2021 APPLICANT
Permit Finaled 7/14/2022 CHRISTOPHE COCHRAN

Permit Application Clearance Information

No Data Available.

Contact Information

Architect Williams,, Samuel M; Lic. No.: C26806 17260 PRAIRIE STREET      NORTHRIDGE, CA 91325
Contractor Aspen General Contractors Inc; Lic. No.: 346680-B PO BOX 913      MANHATTAN BEACH, CA 90266
Engineer Tan,, Henreik Steven; Lic. No.: C65723 5100 LLANO DRIVE      WOODLAND HILLS, CA 91364

Inspector Information

CHRISTOPHE COCHRAN, (818) 374-1165 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 9/22/2021 Conditional Approval LILIANA PORTILLO
Sewer 9/22/2021 Approved LILIANA PORTILLO
HVAC-Rough 10/1/2021 Partial Approval ARAM AVEDISIAN
PLUMBING-Rough 10/1/2021 Approved ARAM AVEDISIAN
ELECTRICAL-Rough 10/20/2021 Approved ARAM AVEDISIAN
BUILDING-Rough-Frame 10/28/2021 Corrections Issued ARAM AVEDISIAN
Shower Pan 11/19/2021 Conditional Approval CALEB MEISTER
Insulation 11/24/2021 Approved THOMAS FINNILA
Interior/Exterior Lathing 11/24/2021 Partial Approval THOMAS FINNILA
BUILDING-Rough-Frame 12/1/2021 Approved ARAM AVEDISIAN
Drywall Nailing 12/22/2021 Approved ARAM AVEDISIAN
Interior/Exterior Lathing 1/19/2022 Partial Approval ARAM AVEDISIAN
HVAC-Final 3/22/2022 Partial Approval ARAM AVEDISIAN
Interior/Exterior Lathing 4/4/2022 Partial Approval ARAM AVEDISIAN
Gas Test 5/18/2022 Approved ARAM AVEDISIAN
ELECTRICAL-Final 6/14/2022 Approved CHRISTOPHE COCHRAN
HVAC-Final 6/14/2022 Approved CHRISTOPHE COCHRAN
Final 6/27/2022 Corrections Issued CHRISTOPHE COCHRAN
PLUMBING-Final 6/27/2022 Approved CHRISTOPHE COCHRAN
SGSOV-Seismic Gas S/O Valve 6/27/2022 SGSOV Approved CHRISTOPHE COCHRAN
Smoke Detectors 6/27/2022 Approved CHRISTOPHE COCHRAN
Final 7/11/2022 No Access for Inspection MATT KELLERMAN
Final 7/14/2022 Permit Finaled CHRISTOPHE COCHRAN
HVAC-Final 7/14/2022 Approved CHRISTOPHE COCHRAN