3756 N WRIGHTWOOD DR 91604

Certificate Information: 3756 N WRIGHTWOOD DR 91604

Application / Permit
21016-30000-14525
Plan Check / Job No.
B21WL02489
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Interior kitchen remodel, remove load bearing wall, and replace windows at exterior for (e) s.f.d.
Permit Issued
Issued on 9/20/2021
Issuing Office
Current Status
Permit Finaled on 11/17/2022

Permit Application Status History

Submitted 6/4/2021 APPLICANT
Assigned to Plan Check Engineer 6/7/2021 ALFREDO JARA
Corrections Issued 6/11/2021 ALFREDO JARA
Applicant returned to address corrections 8/5/2021 KHUONG TRUONG
Applicant returned to address corrections 9/2/2021 JASON JANGADA
Plan Check Approved 9/16/2021 RICHARD GARCIA
Issued 9/20/2021 APPLICANT
Permit Finaled 11/16/2022 JOAQUIN GREENOUGH

Permit Application Clearance Information

Specific Plan Cleared 6/17/2021 MIGUEL GAMBOA
Grading Pre-Inspection Cleared 8/27/2021 PATRICK MISCHLICH

Contact Information

Contractor Build Method Construction Inc; Lic. No.: 1059684-B 12117 VALLEYHEART DRIVE   SUITE 305    STUDIO CITY, CA 91604
Engineer Puliyadi,, Senthilnath Surendran; Lic. No.: C71630 22320 FOOTHILL BLVD STE 600      HAYWARD, CA 94541

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 10/4/2021 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 10/8/2021 Partial Approval DANIEL GONZALEZ
ELECTRICAL-Rough 10/25/2021 Approved BRIAN SULLIVAN
HVAC-Rough 10/25/2021 Approved BRIAN SULLIVAN
PLUMBING-Rough 10/25/2021 Approved BRIAN SULLIVAN
BUILDING-Rough-Frame 10/26/2021 Approved BRIAN SULLIVAN
Interior/Exterior Lathing 10/26/2021 Approved BRIAN SULLIVAN
Insulation 10/27/2021 Approved BRIAN SULLIVAN
Drywall Nailing 11/1/2021 Approved BRIAN SULLIVAN
ELECTRICAL-Final 11/7/2022 Corrections Issued BRIAN SULLIVAN
Final 11/7/2022 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Final 11/7/2022 Not Ready for Inspection BRIAN SULLIVAN
PLUMBING-Final 11/7/2022 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 11/7/2022 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 11/7/2022 Approved BRIAN SULLIVAN
ELECTRICAL-Final 11/16/2022 Approved JOAQUIN GREENOUGH
Final 11/16/2022 Permit Finaled JOAQUIN GREENOUGH
HVAC-Final 11/16/2022 Approved JOAQUIN GREENOUGH
PLUMBING-Final 11/16/2022 Approved JOAQUIN GREENOUGH