8229 S BILLOWVISTA DR 90293
Certificate Information: 8229 S BILLOWVISTA DR 90293
- Application / Permit
- 21016-30000-10206
- Plan Check / Job No.
- B21WL01718
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Interior remodel to remove walls between dining room, living room and kitchen, remodel kitchen, install new bifold door, two (N) windows and (N) mud room per engineer's drawings.
- Permit Issued
- Issued on 3/19/2022
- Issuing Office
- Current Status
- Permit Finaled on 4/4/2024
Permit Application Status History
| Submitted | 4/21/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 4/22/2021 | JAHANSHAH POURHASSAN |
| Corrections Issued | 4/22/2021 | JAHANSHAH POURHASSAN |
| Plan Check Approved | 3/1/2022 | JAHANSHAH POURHASSAN |
| Issued | 3/19/2022 | APPLICANT |
| Building Plans Picked Up | 6/15/2022 | APPLICANT |
| Permit Finaled | 4/4/2024 | BOBBY KEY |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 6/3/2021 | KAVIAN REFAHI |
Contact Information
| Contractor | Lasdc Inc; Lic. No.: 946721-B | 716 COLORADO CIR CARSON, CA 90745 |
| Engineer | Ramirez, Cid, Jose Carlos; Lic. No.: C91046 | 5164 N RATON CIR LONG BEACH, CA 90807 |
Inspector Information
| MICHAEL LEWIS, (310) 914-3979 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Footing/Foundation/Slab | 6/23/2022 | Corrections Issued | BOBBY KEY |
| Footing/Foundation/Slab | 6/27/2022 | Approved | BOBBY KEY |
| Wood Frame | 7/26/2022 | Partial Approval | DAVID FEILER |
| Insulation | 7/28/2022 | Corrections Issued | DAVID FEILER |
| Insulation | 8/1/2022 | Approved | BOBBY KEY |
| Drywall Nailing | 8/4/2022 | Approved | BOBBY KEY |
| Wood Frame | 8/4/2022 | Not Ready for Inspection | BOBBY KEY |
| Green Building Rough | 12/2/2022 | Approved | JESUS RODRIGUEZ |
| Interior/Exterior Lathing | 12/2/2022 | Approved | JESUS RODRIGUEZ |
| Final | 3/19/2024 | Not Ready for Inspection | BOBBY KEY |
| SGSOV-Seismic Gas S/O Valve | 3/19/2024 | SGSOV Approved | BOBBY KEY |
| Smoke Detectors | 3/19/2024 | Corrections Issued | BOBBY KEY |
| Final | 4/4/2024 | Permit Finaled | BOBBY KEY |
| Smoke Detectors | 4/4/2024 | Approved | BOBBY KEY |