1284 N SUNSET PLAZA DR 90069
Certificate Information: 1284 N SUNSET PLAZA DR 90069
- Application / Permit
- 21016-30000-06311
- Plan Check / Job No.
- X21WL01430
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- (8)Window and (4)door change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 152(b) of Title 24. COMBINED WITH ELECTRICAL, PLUMBING, HVAC. Kitchen/bathroom remodel for residential buildings (no structural changes). Replace drywall (no new walls added) for single family dwellings and duplexes only. Replacement of damaged framing members (less than 10% of replacement cost of building) for houses and duplexes (not including decks). Repair of water, dry-rot or termite damaged stairs in residential buildings (less than 10% of replacement cost of stairs). Re-plaster existing swimming pool (a separate express mechanical permit for new skimmer(s) and a separate express electrical permit for new pool luminaire is required, when applicable, except for one and two family dwelling).
- Permit Issued
- Issued on 3/11/2021
- Issuing Office
- Current Status
- Permit Finaled on 8/29/2023
Permit Application Status History
| Issued | 3/11/2021 | APPLICANT |
| Permit Finaled | 8/28/2023 | STUART CHAPMAN |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| No Data Available. |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Drilled-In Anchors | 7/9/2021 | No Access for Inspection | ELMER BLAND |
| ELECTRICAL-Rough | 1/31/2022 | Not Ready for Inspection | RAUL BARAJAS |
| HVAC-Rough | 1/31/2022 | Not Ready for Inspection | RAUL BARAJAS |
| PLUMBING-Rough | 1/31/2022 | Not Ready for Inspection | RAUL BARAJAS |
| ELECTRICAL-Rough | 2/3/2022 | Approved | RAUL BARAJAS |
| PLUMBING-Rough | 2/3/2022 | Approved | RAUL BARAJAS |
| Interior/Exterior Lathing | 3/3/2022 | Approved | RAUL BARAJAS |
| PLUMBING-Rough | 3/3/2022 | Approved | RAUL BARAJAS |
| Shower Pan | 3/3/2022 | Approved | RAUL BARAJAS |
| Insulation | 6/29/2023 | Not Ready for Inspection | RAUL BARAJAS |
| Final | 7/22/2023 | Not Ready for Inspection | JOHN TCHANG |
| SGSOV-Seismic Gas S/O Valve | 7/22/2023 | SGSOV Not Ready | JOHN TCHANG |
| Smoke Detectors | 7/22/2023 | Not Ready for Inspection | JOHN TCHANG |
| Final | 7/27/2023 | Corrections Issued | RAUL BARAJAS |
| HVAC-Final | 7/27/2023 | Not Ready for Inspection | RAUL BARAJAS |
| HVAC-Rough | 7/27/2023 | Not Ready for Inspection | RAUL BARAJAS |
| Insulation | 7/27/2023 | Not Ready for Inspection | RAUL BARAJAS |
| SGSOV-Seismic Gas S/O Valve | 7/27/2023 | SGSOV Not Ready | RAUL BARAJAS |
| Smoke Detectors | 7/27/2023 | Not Ready for Inspection | RAUL BARAJAS |
| Final | 8/28/2023 | Permit Finaled | STUART CHAPMAN |
| SGSOV-Seismic Gas S/O Valve | 8/28/2023 | SGSOV Approved | STUART CHAPMAN |
| Smoke Detectors | 8/28/2023 | Approved | STUART CHAPMAN |