319-321 E AVENUE 28 90031
Certificate Information: 319-321 E AVENUE 28 90031
- Application / Permit
- 21016-30000-06145
- Plan Check / Job No.
- X21WL01398
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (2) Duplex
- Work Description
- *( 2 ) KITCHEN ( 2 ) BATHROOM remodel for residential buildings (no structural changes combined with Elecrical/Plumbing/HVAC) *Replace drywall (no new walls added) for single family dwellings and duplexes only. *Re-roof with Class A or B material weighing less than 6 pounds per sq. ft. over EXISTING solid sheathing __25__ squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roof Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 149(b). *Replacement of damaged framing members (less than 10% of replacement cost of building) for houses and duplexes (not including decks). *Repair of water, dry-rot or termite damaged stairs in residential buildings (less than 10% of replacement cost of stairs).
- Permit Issued
- Issued on 4/1/2021
- Issuing Office
- Current Status
- Permit Finaled on 2/2/2022
Permit Application Status History
| No Progress | 3/12/2021 | GINA DELGADO |
| No Progress | 3/25/2021 | GINA DELGADO |
| Issued | 4/1/2021 | APPLICANT |
| Permit Finaled | 2/1/2022 | OSVALDO PARAMO |
Permit Application Clearance Information
| HPOZ | Cleared | 3/30/2021 | JONATHAN KAPLAN |
Contact Information
| Contractor | Reyes Electrical Contractor Inc; Lic. No.: 494277-B | 628 THOMPSON AVE GLENDALE, CA 91201 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Floor/Roof Diaphrgm/Shear Wall | 6/8/2021 | Partial Approval | OSVALDO PARAMO |
| BUILDING-Rough-Frame | 10/7/2021 | Not Ready for Inspection | COREY HUPP |
| ELECTRICAL-Rough | 10/7/2021 | Not Ready for Inspection | COREY HUPP |
| HVAC-Rough | 10/7/2021 | Not Ready for Inspection | COREY HUPP |
| PLUMBING-Rough | 10/7/2021 | Not Ready for Inspection | COREY HUPP |
| ELECTRICAL-Rough | 10/15/2021 | Approved | COREY HUPP |
| PLUMBING-Rough | 10/15/2021 | Approved | COREY HUPP |
| BUILDING-Rough-Frame | 10/21/2021 | Not Ready for Inspection | JOAQUIN GREENOUGH |
| Insulation | 10/21/2021 | Not Ready for Inspection | JOAQUIN GREENOUGH |
| BUILDING-Rough-Frame | 10/25/2021 | Approved | OSVALDO PARAMO |
| HVAC-Rough | 10/25/2021 | Approved | OSVALDO PARAMO |
| Insulation | 10/28/2021 | Approved | OSVALDO PARAMO |
| Drywall Nailing | 11/5/2021 | Partial Approval | COREY HUPP |
| Drywall Nailing | 11/10/2021 | Approved | OSVALDO PARAMO |
| ELECTRICAL-Final | 1/22/2022 | Corrections Issued | ALIZAH MAYAGOITIA |
| Final | 1/22/2022 | Not Ready for Inspection | ALIZAH MAYAGOITIA |
| HVAC-Final | 1/22/2022 | Approved | ALIZAH MAYAGOITIA |
| PLUMBING-Final | 1/22/2022 | Corrections Issued | ALIZAH MAYAGOITIA |
| SGSOV-Seismic Gas S/O Valve | 1/22/2022 | SGSOV Not Ready | ALIZAH MAYAGOITIA |
| Smoke Detectors | 1/22/2022 | Approved | ALIZAH MAYAGOITIA |
| Final | 1/26/2022 | Corrections Issued | OSVALDO PARAMO |
| SGSOV-Seismic Gas S/O Valve | 1/26/2022 | SGSOV Approved | OSVALDO PARAMO |
| Final | 2/1/2022 | Permit Finaled | OSVALDO PARAMO |
| HVAC-Final | 2/1/2022 | Approved | OSVALDO PARAMO |