345 N ORANGE DR 90036

Certificate Information: 345 N ORANGE DR 90036

Application / Permit
21016-30000-05848
Plan Check / Job No.
B21WL01004
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
interior remodel Floor 1: reconfigure (E) Kitchen, uyility room, and laundry into 2 bedrooms and remodel/enlarge 1 bathroom (57.8sqft). Convert 1 closet into powder room/bathroom (32.8sqft)+. Floor 2: reconfigue (E) bathroom (93.5 sqft), and reconfigure 2 closets into one bathroom (46.5sqft).
Permit Issued
Issued on 4/22/2021
Issuing Office
Current Status
Permit Finaled on 8/6/2021

Permit Application Status History

Submitted 3/5/2021 APPLICANT
Assigned to Plan Check Engineer 3/8/2021 KHUONG TRUONG
Corrections Issued 3/8/2021 KHUONG TRUONG
Applicant returned to address corrections 3/16/2021 KHUONG TRUONG
Plan Check Approved 4/13/2021 KHUONG TRUONG
Issued 4/22/2021 APPLICANT
Permit Finaled 8/5/2021 ARTHUR SARGSYAN

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 3/19/2021 RENZ SORIANO
Roof/Waste drainage to street Cleared 3/19/2021 RENZ SORIANO
Sewer availability Cleared 3/25/2021 CECILIO NAVARRO

Contact Information

Contractor Rebah Maintenance Services Inc; Lic. No.: 1069019-B P O BOX 48088      LOS ANGELES, CA 90048

Inspector Information

RONNIE MINDANAO, (213) 202-3252 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

PLUMBING-Rough 5/6/2021 Approved CHRIS CHRISTENSEN
BUILDING-Rough-Frame 5/14/2021 Conditional Approval JOSEPH MCGARRY
Insulation 5/20/2021 Approved CHRISTOPHER DELLEFIELD
Shower Pan 5/20/2021 Approved CHRISTOPHER DELLEFIELD
Drywall Nailing 5/27/2021 Not Ready for Inspection WILLIAM WREN
Drywall Nailing 6/2/2021 Corrections Issued CHRISTOPHER DELLEFIELD
Interior/Exterior Lathing 6/2/2021 Approved CHRISTOPHER DELLEFIELD
Drywall Nailing 6/4/2021 Approved CHRIS CHRISTENSEN
Interior/Exterior Lathing 6/4/2021 Approved CHRIS CHRISTENSEN
Final 7/16/2021 Corrections Issued JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 7/16/2021 SGSOV Not Ready JOSEPH MCGARRY
Smoke Detectors 7/16/2021 Not Ready for Inspection JOSEPH MCGARRY
Final 7/20/2021 Not Ready for Inspection JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 7/20/2021 SGSOV Approved JOSEPH MCGARRY
Smoke Detectors 7/20/2021 Approved JOSEPH MCGARRY
Final 7/22/2021 Corrections Issued SCOTT FINNILA
Final 8/5/2021 Permit Finaled ARTHUR SARGSYAN