9101 W CRESTA DR 90035

Certificate Information: 9101 W CRESTA DR 90035

Application / Permit
21016-30000-05151
Plan Check / Job No.
B21WL00884
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Remodel of existing kitchen and dining room in existing s.f.d. Resizing and relocation of 6 existing exterior doors and windows. Per engineering design.
Permit Issued
Issued on 7/1/2021
Issuing Office
Current Status
Issued on 7/1/2021

Permit Application Status History

Submitted 3/1/2021 APPLICANT
Assigned to Plan Check Engineer 3/4/2021 KAVIAN REFAHI
Corrections Issued 3/6/2021 KAVIAN REFAHI
Applicant returned to address corrections 3/24/2021 JASON JANGADA
Applicant returned to address corrections 4/8/2021 ALFREDO JARA
Plan Check Approved 6/3/2021 JAHANSHAH POURHASSAN
Issued 7/1/2021 APPLICANT
Building Plans Picked Up 11/2/2021 APPLICANT

Permit Application Clearance Information

Grading Pre-Inspection Cleared 3/24/2021 KIRK LINKLATER

Contact Information

Contractor G V Construction Services; Lic. No.: 675938-B 8067 MARTINGALE DRIVE      RIVERSIDE, CA 92509
Engineer Erdelyi,, Peter Tibor; Lic. No.: C26962 1950 SAWTELLE BLVD STE 175      LOS ANGELES, CA 90025

Inspector Information

ASHLEY THOMPSON, (310) 914-3897 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 9/3/2021 Conditional Approval MORRIS JACKSON
BUILDING-Rough-Frame 9/10/2021 Not Ready for Inspection KEVIN SARGSYAN
Footing/Foundation/Slab 9/10/2021 Corrections Issued KEVIN SARGSYAN
PLUMBING-Rough 9/10/2021 Corrections Issued KEVIN SARGSYAN
Deputy Drilled-In Anchors 9/28/2021 Conditional Approval KEVIN SARGSYAN
Deputy Steel/Welding 10/5/2021 No Result Entered RONALD WEBER
Deputy Drilled-In Anchors 10/20/2021 Conditional Approval KEVIN SARGSYAN
Deputy Steel/Welding 10/20/2021 Conditional Approval KEVIN SARGSYAN
Footing/Foundation/Slab 10/21/2021 No Access for Inspection KEVIN SARGSYAN
Excavation/Setback/Form/Re-Bar 10/22/2021 Approved KEVIN SARGSYAN
Deputy Drilled-In Anchors 10/29/2021 No Access for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 11/1/2021 Corrections Issued STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 11/1/2021 Approved STEPHANIE SWANSON
PLUMBING-Rough 11/1/2021 Partial Approval STEPHANIE SWANSON
ELECTRICAL-Rough 11/4/2021 Not Ready for Inspection KEVIN SARGSYAN
Interior/Exterior Lathing 11/4/2021 Approved KEVIN SARGSYAN
PLUMBING-Rough 11/4/2021 Not Ready for Inspection KEVIN SARGSYAN
ELECTRICAL-Rough 11/10/2021 Approved KEVIN SARGSYAN
Insulation 11/10/2021 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 11/10/2021 Approved KEVIN SARGSYAN
PLUMBING-Rough 11/10/2021 Approved KEVIN SARGSYAN
SGSOV-Seismic Gas S/O Valve 5/16/2022 SGSOV Not Ready KEVIN SARGSYAN