9101 W CRESTA DR 90035
Certificate Information: 9101 W CRESTA DR 90035
- Application / Permit
- 21016-30000-05151
- Plan Check / Job No.
- B21WL00884
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Remodel of existing kitchen and dining room in existing s.f.d. Resizing and relocation of 6 existing exterior doors and windows. Per engineering design.
- Permit Issued
- Issued on 7/1/2021
- Issuing Office
- Current Status
- Issued on 7/1/2021
Permit Application Status History
| Submitted | 3/1/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 3/4/2021 | KAVIAN REFAHI |
| Corrections Issued | 3/6/2021 | KAVIAN REFAHI |
| Applicant returned to address corrections | 3/24/2021 | JASON JANGADA |
| Applicant returned to address corrections | 4/8/2021 | ALFREDO JARA |
| Plan Check Approved | 6/3/2021 | JAHANSHAH POURHASSAN |
| Issued | 7/1/2021 | APPLICANT |
| Building Plans Picked Up | 11/2/2021 | APPLICANT |
Permit Application Clearance Information
| Grading Pre-Inspection | Cleared | 3/24/2021 | KIRK LINKLATER |
Contact Information
| Contractor | G V Construction Services; Lic. No.: 675938-B | 8067 MARTINGALE DRIVE RIVERSIDE, CA 92509 |
| Engineer | Erdelyi,, Peter Tibor; Lic. No.: C26962 | 1950 SAWTELLE BLVD STE 175 LOS ANGELES, CA 90025 |
Inspector Information
| ASHLEY THOMPSON, (310) 914-3897 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Drilled-In Anchors | 9/3/2021 | Conditional Approval | MORRIS JACKSON |
| BUILDING-Rough-Frame | 9/10/2021 | Not Ready for Inspection | KEVIN SARGSYAN |
| Footing/Foundation/Slab | 9/10/2021 | Corrections Issued | KEVIN SARGSYAN |
| PLUMBING-Rough | 9/10/2021 | Corrections Issued | KEVIN SARGSYAN |
| Deputy Drilled-In Anchors | 9/28/2021 | Conditional Approval | KEVIN SARGSYAN |
| Deputy Steel/Welding | 10/5/2021 | No Result Entered | RONALD WEBER |
| Deputy Drilled-In Anchors | 10/20/2021 | Conditional Approval | KEVIN SARGSYAN |
| Deputy Steel/Welding | 10/20/2021 | Conditional Approval | KEVIN SARGSYAN |
| Footing/Foundation/Slab | 10/21/2021 | No Access for Inspection | KEVIN SARGSYAN |
| Excavation/Setback/Form/Re-Bar | 10/22/2021 | Approved | KEVIN SARGSYAN |
| Deputy Drilled-In Anchors | 10/29/2021 | No Access for Inspection | KEVIN SARGSYAN |
| ELECTRICAL-Rough | 11/1/2021 | Corrections Issued | STEPHANIE SWANSON |
| Floor/Roof Diaphrgm/Shear Wall | 11/1/2021 | Approved | STEPHANIE SWANSON |
| PLUMBING-Rough | 11/1/2021 | Partial Approval | STEPHANIE SWANSON |
| ELECTRICAL-Rough | 11/4/2021 | Not Ready for Inspection | KEVIN SARGSYAN |
| Interior/Exterior Lathing | 11/4/2021 | Approved | KEVIN SARGSYAN |
| PLUMBING-Rough | 11/4/2021 | Not Ready for Inspection | KEVIN SARGSYAN |
| ELECTRICAL-Rough | 11/10/2021 | Approved | KEVIN SARGSYAN |
| Insulation | 11/10/2021 | Approved | KEVIN SARGSYAN |
| Interior/Exterior Lathing | 11/10/2021 | Approved | KEVIN SARGSYAN |
| PLUMBING-Rough | 11/10/2021 | Approved | KEVIN SARGSYAN |
| SGSOV-Seismic Gas S/O Valve | 5/16/2022 | SGSOV Not Ready | KEVIN SARGSYAN |