588 N ENTRADA DR 90402

Certificate Information: 588 N ENTRADA DR 90402

Application / Permit
21016-20000-58824
Plan Check / Job No.
B21VN17759
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL (E) SFD TO RECONFIGURE (E) KITCHEN, BEDROOM, LAUNDRY AND FAMILY ROOM. REMODEL TWO BATHROOMS AND REPLACE DOORS AND WINDOWS. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 2/28/2022
Issuing Office
Current Status
Permit Finaled on 5/31/2023

Permit Application Status History

Submitted 12/21/2021 APPLICANT
Assigned to Plan Check Engineer 12/29/2021 RAPHAEL ROSAS
Corrections Issued 1/1/2022 RAPHAEL ROSAS
Plan Check Approved 2/9/2022 RAPHAEL ROSAS
Building Plans Picked Up 2/18/2022 APPLICANT
Issued 2/28/2022 APPLICANT
Permit Finaled 5/30/2023 OGANES TARAKHCHYAN

Permit Application Clearance Information

"D" conditions Cleared 1/6/2022 DANIEL CORONADO
Grading Pre-Inspection Cleared 1/26/2022 VASIL MIHALEV

Contact Information

Contractor Handy J Construction; Lic. No.: 742256-B 1823 19TH STREET #03      SANTA MONICA, CA 90404
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

HERBERT GIRON, (310) 914-3891 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 6/7/2022 Approved MICHAEL PELHAM
Footing/Foundation/Slab 6/7/2022 Approved MICHAEL PELHAM
Deputy Steel/Welding 7/7/2022 Conditional Approval MICHAEL PELHAM
ELECTRICAL-Rough 9/7/2022 Approved JOHN KIDWELL
HVAC-Rough 9/7/2022 Approved JOHN KIDWELL
PLUMBING-Rough 9/7/2022 Conditional Approval JOHN KIDWELL
PLUMBING-Rough 11/14/2022 No Access for Inspection KEVIN SARGSYAN
PLUMBING-Rough 11/15/2022 Approved KEVIN SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 12/6/2022 Approved KEVIN SARGSYAN
Interior/Exterior Lathing 12/20/2022 Partial Approval KEVIN SARGSYAN
BUILDING-Rough-Frame 1/17/2023 Corrections Issued KEVIN SARGSYAN
Interior/Exterior Lathing 1/17/2023 Partial Approval KEVIN SARGSYAN
Special/Order Compliance 1/17/2023 Not Ready for Inspection OGANES TARAKHCHYAN
Wood Frame 1/17/2023 Not Ready for Inspection KEVIN SARGSYAN
Wood Frame 1/20/2023 Approved OGANES TARAKHCHYAN
Insulation 1/26/2023 Approved OGANES TARAKHCHYAN
Underground Mechanical 1/26/2023 Partial Approval OGANES TARAKHCHYAN
Drywall Nailing 2/2/2023 Partial Approval OGANES TARAKHCHYAN
PLUMBING-Rough 2/21/2023 Corrections Issued OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 2/21/2023 SGSOV Not Ready OGANES TARAKHCHYAN
PLUMBING-Rough 3/6/2023 Partial Approval OGANES TARAKHCHYAN
Shower Pan 3/10/2023 Approved OGANES TARAKHCHYAN
Interior/Exterior Lathing 3/28/2023 Approved OGANES TARAKHCHYAN
Final 5/18/2023 Corrections Issued OGANES TARAKHCHYAN
SGSOV-Seismic Gas S/O Valve 5/18/2023 SGSOV Approved OGANES TARAKHCHYAN
Smoke Detectors 5/18/2023 Approved OGANES TARAKHCHYAN
ELECTRICAL-Final 5/24/2023 Approved OGANES TARAKHCHYAN
HVAC-Final 5/24/2023 Approved OGANES TARAKHCHYAN
PLUMBING-Final 5/24/2023 Approved OGANES TARAKHCHYAN
Final 5/30/2023 Permit Finaled OGANES TARAKHCHYAN