1690 N CRESCENT HEIGHTS BLVD 90069
Certificate Information: 1690 N CRESCENT HEIGHTS BLVD 90069
- Application / Permit
- 21016-20000-57295
- Plan Check / Job No.
- B21VN17041
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- INTERIOR REMODEL TO THE (E) TWO STORY SFD TO CONVERT (E) BATHROOM AND STUDY ROOM AT 2ND FLOOR INTO NEW KITCHEN AND PANTRY AND CONVERT (E) KITCHEN TO STUDY ROOM AND BATHROOM AND REMODEL BEDROOM AT 1ST FLOOR, ALL WORK PER ENGINEERING
- Permit Issued
- Issued on 3/17/2022
- Issuing Office
- West Los Angeles
- Current Status
- Permit Finaled on 8/23/2025
Permit Application Status History
| Submitted | 12/18/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 12/27/2021 | RARES BODEA |
| Corrections Issued | 1/3/2022 | RARES BODEA |
| Building Plans Picked Up | 1/4/2022 | APPLICANT |
| Applicant returned to address corrections | 1/24/2022 | RARES BODEA |
| Plan Check Approved | 2/3/2022 | RARES BODEA |
| Issued | 3/17/2022 | APPLICANT |
| Permit Finaled | 8/22/2025 | ROY SPAULDING |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Bowman Contracting Co; Lic. No.: 979781-B | 803 PORTESUELLO SANTA BARBARA, CA 93101 |
| Engineer | Hajdari,, Genti; Lic. No.: C88031 | 140 S MENTOR AVE APT #207 PASADENA, CA 91106 |
Inspector Information
| No Data Available. |
Pending Inspections
| No Data Available. |
Inspection Request History
| Deputy Drilled-In Anchors | 8/2/2022 | Conditional Approval | RAUL BARAJAS |
| PLUMBING-Rough | 8/11/2022 | Corrections Issued | RAUL BARAJAS |
| BUILDING-Rough-Frame | 8/18/2022 | Conditional Approval | RAUL BARAJAS |
| Pre-Inspection | 5/8/2025 | Corrections Issued | ROY SPAULDING |
| Pre-Inspection | 5/30/2025 | Corrections Issued | BRENDAN MORELLI |
| BUILDING-Rough-Frame | 8/5/2025 | Corrections Issued | ROY SPAULDING |
| SGSOV-Seismic Gas S/O Valve | 8/5/2025 | SGSOV Not Ready | ROY SPAULDING |
| Smoke Detectors | 8/5/2025 | Not Ready for Inspection | ROY SPAULDING |
| BUILDING-Rough-Frame | 8/7/2025 | Approved | ROY SPAULDING |
| Final | 8/22/2025 | Permit Finaled | ROY SPAULDING |
| SGSOV-Seismic Gas S/O Valve | 8/22/2025 | SGSOV Approved | ROY SPAULDING |
| Smoke Detectors | 8/22/2025 | Approved | ROY SPAULDING |