3680 N FREDONIA DR 90068

Certificate Information: 3680 N FREDONIA DR 90068

Application / Permit
21016-20000-56994
Plan Check / Job No.
X21VN07758
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
Kitchen/bathroom (2) remodel for residential buildings (no structural changes). Replace drywall (no new walls added) for single family dwellings and duplexes only. Replace existing pre-fabricated fireplace with the same size and in the same location. Installation shall be as per manufacturer's recommendations. An HVAC permit is required. Replacement of damaged framing members (less than 10% of replacement cost of building) for houses and duplexes (not including decks).
Permit Issued
Issued on 1/5/2022
Issuing Office
Current Status
Permit Finaled on 9/11/2025

Permit Application Status History

Issued 1/5/2022 APPLICANT
Permit Finaled 9/10/2025 CRAIG VAUGHAN

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Owner-Builder       ,

Inspector Information

ROY SPAULDING, (213) 202-3461 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Interior/Exterior Lathing 7/18/2022 Partial Approval ADAM ESCOTO
BUILDING-Rough-Frame 7/26/2022 Corrections Issued STUART CHAPMAN
ELECTRICAL-Rough 7/26/2022 Approved STUART CHAPMAN
HVAC-Rough 7/26/2022 Not Ready for Inspection STUART CHAPMAN
Interior/Exterior Lathing 7/26/2022 Partial Approval STUART CHAPMAN
PLUMBING-Rough 7/26/2022 Corrections Issued STUART CHAPMAN
Rough-Elec/Plmb/HVAC 7/26/2022 Not Ready for Inspection STUART CHAPMAN
Underground Mechanical 7/26/2022 Partial Approval STUART CHAPMAN
ELECTRICAL-Rough 8/9/2022 Approved ALIZAH MAYAGOITIA
HVAC-Rough 8/9/2022 Approved ALIZAH MAYAGOITIA
Insulation 8/9/2022 Partial Approval ALIZAH MAYAGOITIA
PLUMBING-Rough 8/9/2022 Corrections Issued ALIZAH MAYAGOITIA
Shower Pan 10/6/2022 Corrections Issued BRIAN SULLIVAN
PLUMBING-Final 12/31/2022 Partial Inspection RAUL BARAJAS
Gas Test 1/4/2023 Approved RAUL BARAJAS
BUILDING-Rough-Frame 6/2/2023 Not Ready for Inspection BRIAN SULLIVAN
ELECTRICAL-Final 6/2/2023 Not Ready for Inspection BRIAN SULLIVAN
Final 6/2/2023 Not Ready for Inspection BRIAN SULLIVAN
HVAC-Final 6/2/2023 Not Ready for Inspection BRIAN SULLIVAN
MERV13>=Final 6/2/2023 Not Ready for Inspection BRIAN SULLIVAN
MERV13>=Rough 6/2/2023 Approved BRIAN SULLIVAN
PLUMBING-Final 6/2/2023 Not Ready for Inspection BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 6/2/2023 SGSOV Approved BRIAN SULLIVAN
Smoke Detectors 6/2/2023 Not Ready for Inspection BRIAN SULLIVAN
BUILDING-Rough-Frame 7/23/2025 Approved ROY SPAULDING
ELECTRICAL-Final 7/23/2025 Approved ROY SPAULDING
Final 7/23/2025 Corrections Issued ROY SPAULDING
HVAC-Final 7/23/2025 Approved ROY SPAULDING
MERV13>=Final 7/23/2025 Approved ROY SPAULDING
PLUMBING-Final 7/23/2025 Approved ROY SPAULDING
Smoke Detectors 7/23/2025 Approved ROY SPAULDING
Final 9/10/2025 Permit Finaled CRAIG VAUGHAN