5601 N DE SOTO AVE 91367

Certificate Information: 5601 N DE SOTO AVE 91367

Application / Permit
21016-20000-54324
Plan Check / Job No.
B21VN15710
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
Commercial
Primary Use
(12) Electric Generator or Motor Manufacturing
Work Description
INTERIOR REMODEL TO EMERGENCY GENERATOR ROOM TO REPLACE THE EMERGENCY GENERATOR WITH A NEW GENERATOR ON THE (E) CONCRETE SLAB. ALL WORK DONE PER ENGINEERING.
Permit Issued
Issued on 10/5/2022
Issuing Office
Valley
Current Status
Permit Finaled on 7/18/2025

Permit Application Status History

Submitted 11/15/2021 APPLICANT
Assigned to Plan Check Engineer 11/24/2021 GURUNATH NESARAJAH
Corrections Issued 11/26/2021 GURUNATH NESARAJAH
Applicant returned to address corrections 1/11/2022 RICHARD GARCIA
Applicant returned to address corrections 2/25/2022 GURUNATH NESARAJAH
Plan Check Approved 5/30/2022 GURUNATH NESARAJAH
Building Plans Picked Up 6/21/2022 APPLICANT
Issued 10/5/2022 APPLICANT
Permit Finaled 7/18/2025 BRIAN KELLY

Permit Application Clearance Information

Specific Plan Cleared 2/7/2022 SHEILA AHORAIAN

Contact Information

Contractor Fakouri Electrical Engineering Inc; Lic. No.: 481149-B 30001 COMERCIO      RANCHO SANTA MARGARITA, CA 92688
Engineer Welton,, Jeremy Cain; Lic. No.: S4614 26461 RANCHO PARKWAY SOUTH      LAKE FOREST, CA 92630

Inspector Information

BRIAN KELLY, (818) 374-1127 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Deputy Drilled-In Anchors 12/2/2022 Conditional Approval BRIAN KELLY
Deputy Drilled-In Anchors 12/5/2022 Conditional Approval BRIAN KELLY
Deputy Drilled-In Anchors 12/15/2022 Conditional Approval BRIAN KELLY
Final 12/20/2022 Not Ready for Inspection BRIAN KELLY
SGSOV-Seismic Gas S/O Valve 12/20/2022 SGSOV Not Ready BRIAN KELLY
Smoke Detectors 12/20/2022 Not Ready for Inspection BRIAN KELLY
Final 12/22/2022 Not Ready for Inspection BRIAN KELLY
SGSOV-Seismic Gas S/O Valve 12/22/2022 SGSOV Not Ready BRIAN KELLY
Smoke Detectors 12/22/2022 Not Ready for Inspection BRIAN KELLY
Deputy Drilled-In Anchors 1/23/2023 Conditional Approval BRIAN KELLY
Final 7/15/2025 Not Ready for Inspection BRIAN KELLY
SGSOV-Seismic Gas S/O Valve 7/15/2025 SGSOV Not Ready BRIAN KELLY
Smoke Detectors 7/15/2025 Approved BRIAN KELLY
Final 7/18/2025 Permit Finaled BRIAN KELLY
SGSOV-Seismic Gas S/O Valve 7/18/2025 SGSOV Approved BRIAN KELLY