13031 N DE GARMO AVE 91342

Certificate Information: 13031 N DE GARMO AVE 91342

Application / Permit
21016-20000-49679
Plan Check / Job No.
B21VN15003
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT THE (E) 20' X 20' (400 SQ. FT.) GARAGE INTO A (N) ACCESSORY DWELLING UNIT. PER GCS 65852.2(e)(1)(A)
Permit Issued
Issued on 2/15/2022
Issuing Office
Valley
Current Status
CofO Issued on 12/17/2022
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 11/5/2021 APPLICANT
Assigned to Plan Check Engineer 11/18/2021 LUISANGEL VALENZUELA
Corrections Issued 11/19/2021 LUISANGEL VALENZUELA
Applicant returned to address corrections 12/8/2021 LUISANGEL VALENZUELA
Issued 2/15/2022 APPLICANT
Building Plans Picked Up 2/15/2022 APPLICANT
CofO in Progress 10/5/2022 ARAM AVEDISIAN
Permit Finaled 12/17/2022 MICHAEL SMITH
CofO Issued 12/17/2022 MICHAEL SMITH
Permit Finaled 12/17/2022 MICHAEL SMITH

Permit Application Clearance Information

Address approval Cleared 11/23/2021 AMIR KASHFI
Eng Process Fee Ord 176,300 Cleared 11/23/2021 AMIR KASHFI
Sewer availability Cleared 11/23/2021 AMIR KASHFI
Construction near power lines Cleared 1/29/2022 WALTER RAMIREZ

Contact Information

Contractor Owner-Builder       ,
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

KEVIN BERBERYAN, (818) 374-9931 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Footing/Foundation/Slab 4/19/2022 Approved JOHN HAYES
PLUMBING-Rough 4/19/2022 Partial Approval JOHN HAYES
BUILDING-Rough-Frame 5/13/2022 Not Ready for Inspection JOHN HAYES
ELECTRICAL-Rough 5/13/2022 Not Ready for Inspection JOHN HAYES
Green Building Rough 5/13/2022 Not Ready for Inspection JOHN HAYES
PLUMBING-Rough 5/13/2022 Not Ready for Inspection JOHN HAYES
BUILDING-Rough-Frame 5/19/2022 Approved JOHN HAYES
Green Building Rough 5/19/2022 Approved JOHN HAYES
Rough-Elec/Plmb/HVAC 5/19/2022 Approved JOHN HAYES
Floor/Roof Diaphrgm/Shear Wall 5/25/2022 Partial Approval JOHN HAYES
Insulation 5/25/2022 Approved JOHN HAYES
Interior/Exterior Lathing 5/25/2022 Not Ready for Inspection JOHN HAYES
Drywall Nailing 6/2/2022 Approved JOHN HAYES
Interior/Exterior Lathing 6/2/2022 Approved JOHN HAYES
Final 9/16/2022 Corrections Issued ARAM AVEDISIAN
Green Building Final 9/16/2022 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 9/16/2022 SGSOV Not Ready ARAM AVEDISIAN
Smoke Detectors 9/16/2022 Approved ARAM AVEDISIAN
ELECTRICAL-Final 10/3/2022 Approved ARAM AVEDISIAN
Final 10/3/2022 Corrections Issued ARAM AVEDISIAN
PLUMBING-Final 10/3/2022 Approved ARAM AVEDISIAN
SGSOV-Seismic Gas S/O Valve 10/3/2022 SGSOV Approved ARAM AVEDISIAN
Final 10/5/2022 OK to Issue CofO ARAM AVEDISIAN