5100 N MELVIN AVE 91356
Certificate Information: 5100 N MELVIN AVE 91356
- Application / Permit
- 21016-20000-34763
- Plan Check / Job No.
- B21VN13549
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- INTERIOR ALTERATION TO REMOVE TWO LOAD BEARING WALLS BETWEEN THE KITCHEN AND THE DINING ROOM, AND TO REMODEL THE KITCHEN, AND TO ENLARGE A HALF BATHROOM.
- Permit Issued
- Issued on 10/6/2021
- Issuing Office
- Current Status
- Permit Finaled on 6/9/2022
Permit Application Status History
| Submitted | 10/5/2021 | APPLICANT |
| Assigned to Plan Check Engineer | 10/6/2021 | LUIS RINCON |
| Plan Check Approved | 10/6/2021 | LUIS RINCON |
| Issued | 10/6/2021 | APPLICANT |
| Building Plans Picked Up | 10/7/2021 | APPLICANT |
| Permit Finaled | 6/8/2022 | PETER FOLLING |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Hi-Tech Builders Inc; Lic. No.: 957111-B | 5435 BALBOA BLVD STE 200 ENCINO, CA 91316 |
| Engineer | Maalouf,, Sami; Lic. No.: C53210 | 15445 VENTURA BLVD STE 367 SHERMAN OAKS, CA 91403 |
Inspector Information
| JOHN KIDWELL, (818) 774-4314 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| BUILDING-Rough-Frame | 11/8/2021 | Not Ready for Inspection | DAVID SANDOVAL |
| Footing/Foundation/Slab | 11/8/2021 | Approved | DAVID SANDOVAL |
| BUILDING-Rough-Frame | 11/12/2021 | Corrections Issued | DAVID SANDOVAL |
| BUILDING-Rough-Frame | 11/16/2021 | Approved | DAVID SANDOVAL |
| PLUMBING-Rough | 11/16/2021 | Corrections Issued | DAVID SANDOVAL |
| ELECTRICAL-Rough | 11/30/2021 | Corrections Issued | DAVID SANDOVAL |
| PLUMBING-Rough | 11/30/2021 | Not Ready for Inspection | DAVID SANDOVAL |
| ELECTRICAL-Rough | 12/3/2021 | Not Ready for Inspection | DAVID SANDOVAL |
| ELECTRICAL-Rough | 12/8/2021 | Approved | DAVID SANDOVAL |
| Insulation | 12/8/2021 | Approved | DAVID SANDOVAL |
| PLUMBING-Rough | 12/8/2021 | Approved | DAVID SANDOVAL |
| Drywall Nailing | 12/15/2021 | Approved | JAVIER RAMOS JR |
| Interior/Exterior Lathing | 12/15/2021 | Not Ready for Inspection | JAVIER RAMOS JR |
| Final | 6/8/2022 | Permit Finaled | PETER FOLLING |
| SGSOV-Seismic Gas S/O Valve | 6/8/2022 | SGSOV Approved | PETER FOLLING |
| Smoke Detectors | 6/8/2022 | Approved | PETER FOLLING |