462 S WARNER AVE 90024

Certificate Information: 462 S WARNER AVE 90024

Application / Permit
21016-20000-30436
Plan Check / Job No.
B21VN12696
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL, INTERIOR REMODEL TO THE (E) KITCHEN AND POWDER ROOM, REMOVE THE DEN ENTRYWAY WALL AND THE WALL THE DEN AND KITCHEN REMOVE THE FIRST FLOOR LAUNDRY ROOM AND THE REAR STAIRES AND CLOSE OFF THE FLOOR FRAMING AND ADD A HALLWAY ON THE SECOND FLOOR ALL WORK PER ENGINEERING NO ADDITONAL FLOOR AREA
Permit Issued
Issued on 1/3/2022
Issuing Office
Valley
Current Status
Permit Finaled on 4/25/2023

Permit Application Status History

Submitted 9/20/2021 APPLICANT
Assigned to Plan Check Engineer 9/23/2021 SEWADA ZADOORIAN MILAGARDI
Corrections Issued 9/25/2021 SEWADA ZADOORIAN MILAGARDI
Building Plans Picked Up 10/5/2021 APPLICANT
Applicant returned to address corrections 11/16/2021 SEWADA ZADOORIAN MILAGARDI
Plan Check Approved 11/17/2021 SEWADA ZADOORAN MILAGARDI
Issued 1/3/2022 APPLICANT
Permit Finaled 4/25/2023 STEPHANIE SWANSON

Permit Application Clearance Information

Eng Process Fee Ord 176,300 Cleared 10/15/2021 NIKTA MOUSAVI
Sewer availability Cleared 10/15/2021 NIKTA MOUSAVI
Grading Pre-Inspection Cleared 10/18/2021 JONATHAN HOM
Miscellaneous Cleared 10/18/2021 DANIEL CORONADO

Contact Information

Contractor Owner-Builder       ,
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

DAVID SCANTLIN, (310) 914-3863 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

BUILDING-Rough-Frame 8/12/2022 Not Ready for Inspection GERMAN RODRIGUEZ MENDOZA
Floor/Roof Diaphrgm/Shear Wall 8/16/2022 Not Ready for Inspection CARLOS MATAMOROS
Pre-Inspection 8/16/2022 Not Ready for Inspection CARLOS MATAMOROS
Shower Pan 8/16/2022 Approved CARLOS MATAMOROS
Wood Frame 8/16/2022 Not Ready for Inspection CARLOS MATAMOROS
Deputy Wood Construction 8/17/2022 Conditional Approval MICHAEL PELHAM
Interior/Exterior Lathing 8/23/2022 Partial Approval STEPHANIE SWANSON
BUILDING-Rough-Frame 9/9/2022 Corrections Issued STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 9/9/2022 Corrections Issued STEPHANIE SWANSON
BUILDING-Rough-Frame 9/13/2022 Corrections Issued STEPHANIE SWANSON
Floor/Roof Diaphrgm/Shear Wall 9/13/2022 Approved STEPHANIE SWANSON
Footing/Foundation/Slab 9/13/2022 Corrections Issued STEPHANIE SWANSON
BUILDING-Rough-Frame 10/28/2022 Approved CARLOS MATAMOROS
Footing/Foundation/Slab 10/28/2022 Approved CARLOS MATAMOROS
Insulation 11/15/2022 Approved STEPHANIE SWANSON
Interior/Exterior Lathing 11/15/2022 Approved STEPHANIE SWANSON
Drywall Nailing 12/2/2022 Approved CHRISTOPHER WILSON
Final 4/25/2023 Permit Finaled STEPHANIE SWANSON
SGSOV-Seismic Gas S/O Valve 4/25/2023 SGSOV Approved STEPHANIE SWANSON
Smoke Detectors 4/25/2023 Approved STEPHANIE SWANSON