2994 N DURAND DR 90068

Certificate Information: 2994 N DURAND DR 90068

Application / Permit
21016-20000-23095
Plan Check / Job No.
B21VN11757
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMOVE AND REPLACE TWO (E) BALCONIES AND REPLACE RAILING, ALL WORK PER ENGINEERING.
Permit Issued
Issued on 11/24/2021
Issuing Office
Current Status
Permit Finaled on 9/16/2025

Permit Application Status History

Submitted 8/30/2021 APPLICANT
Assigned to Plan Check Engineer 9/7/2021 LUISANGEL VALENZUELA
Corrections Issued 9/7/2021 LUISANGEL VALENZUELA
Plan Check Approved 10/19/2021 LUISANGEL VALENZUELA
Building Plans Picked Up 11/5/2021 APPLICANT
Issued 11/24/2021 APPLICANT
Permit Finaled 9/15/2025 CRAIG VAUGHAN

Permit Application Clearance Information

ZI Cleared 9/23/2021 LIKYELESH ABERA
Grading Pre-Inspection Cleared 10/8/2021 ROBERT HUGHES

Contact Information

Contractor Aguirre Rosales Construction Inc; Lic. No.: 1039164-B 19055 PARTHENIA STREET      NORTHRIDGE, CA 91324
Engineer Cox,, Steven Jeffrey; Lic. No.: C48940 130 MAGELLAN ST      THOUSAND OAKS, CA 91360

Inspector Information

CRAIG VAUGHAN, (213) 202-3250 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Final 3/8/2022 Corrections Issued BRIAN SULLIVAN
SGSOV-Seismic Gas S/O Valve 3/8/2022 SGSOV Not Ready BRIAN SULLIVAN
Smoke Detectors 3/8/2022 Not Ready for Inspection BRIAN SULLIVAN
Wood Frame 3/17/2022 Approved JOSEPH MCGARRY
SGSOV-Seismic Gas S/O Valve 5/25/2022 SGSOV Not Ready BRIAN SULLIVAN
Interior/Exterior Lathing 5/27/2022 Approved BRIAN SULLIVAN
Special/Order Compliance 6/13/2022 Corrections Issued BRIAN SULLIVAN
Special/Order Compliance 6/13/2022 Partial Inspection RUBEN SALAS
Final 3/15/2024 Partial Inspection ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 3/15/2024 SGSOV Not Ready ROY SPAULDING
Smoke Detectors 3/15/2024 Not Ready for Inspection ROY SPAULDING
Final 3/20/2024 Not Ready for Inspection ROY SPAULDING
SGSOV-Seismic Gas S/O Valve 3/20/2024 SGSOV Not Ready ROY SPAULDING
Smoke Detectors 3/20/2024 Corrections Issued ROY SPAULDING
Final 1/22/2025 Not Ready for Inspection CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 1/22/2025 SGSOV Not Ready CRAIG VAUGHAN
Smoke Detectors 1/22/2025 Not Ready for Inspection CRAIG VAUGHAN
Final 7/8/2025 Not Ready for Inspection CRAIG VAUGHAN
Pre-Inspection 7/8/2025 Approved CRAIG VAUGHAN
SGSOV-Seismic Gas S/O Valve 7/8/2025 SGSOV Approved CRAIG VAUGHAN
Smoke Detectors 7/8/2025 Not Ready for Inspection CRAIG VAUGHAN
Final 9/15/2025 Permit Finaled CRAIG VAUGHAN
Smoke Detectors 9/15/2025 Approved CRAIG VAUGHAN