9108 S WADSWORTH AVE 90002
Certificate Information: 9108 S WADSWORTH AVE 90002
- Application / Permit
- 21016-20000-21613
- Plan Check / Job No.
- X21VN05459
- Group
- Building
- Type
- Bldg-Alter/Repair
- Sub-Type
- 1 or 2 Family Dwelling
- Primary Use
- (1) Dwelling - Single Family
- Work Description
- Kitchen/bathroom (1) remodel for residential buildings (no structural changes). Window (5 ) change-out (same size & type) for residential buildings. Dual glazing, labeled and certified by National Fenestration Rating Council (NFRC), is required for doors and windows replaced in all residential buildings, three stories or less, per Section 150.2(b) IB of Title 24. Re-roof with Class A or B roof covering material weighing less than 6 pounds per sq. ft. over existing solid sheathing (10) Squares. Class A roof covering is required within Very High Fire Hazard Severity Zone (VHFHSZ). For residential roof replacement > 50% of the total roof area, apply Cool Roof Product labeled and certified by Cool Roofing Rating Council (CRRC). Cool Roof may be required for non-residential buildings per Title 24, Part 6, Section 141.0(b)2B.
- Permit Issued
- Issued on 8/18/2021
- Issuing Office
- Current Status
- Permit Finaled on 5/26/2022
Permit Application Status History
| Issued | 8/18/2021 | APPLICANT |
| Permit Finaled | 5/25/2022 | ALEJANDRO DE ARTOLA |
Permit Application Clearance Information
| No Data Available. |
Contact Information
| Contractor | Habitat For Humanity Of Greater Los Angeles; Lic. No.: 907613-B | 8739 ARTESIA BLVD BELLFLOWER, CA 90706 |
Inspector Information
| JOHN QUINTANILLA, (213) 792-6055 | Office Hours: 7:00-8:00 AM MON-FRI |
Pending Inspections
| No Data Available. |
Inspection Request History
| ELECTRICAL-Rough | 9/22/2021 | Not Ready for Inspection | JOHN KLARIN |
| Floor/Roof Diaphrgm/Shear Wall | 9/22/2021 | Partial Approval | JOHN KLARIN |
| PLUMBING-Rough | 9/22/2021 | Partial Approval | JOHN KLARIN |
| ELECTRICAL-Rough | 9/24/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| Gas Test | 9/24/2021 | Partial Approval | ALEJANDRO DE ARTOLA |
| PLUMBING-Rough | 9/24/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| BUILDING-Rough-Frame | 9/28/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| ELECTRICAL-Rough | 10/5/2021 | Conditional Approval | ALEJANDRO DE ARTOLA |
| HVAC-Rough | 10/5/2021 | Approved | ALEJANDRO DE ARTOLA |
| PLUMBING-Rough | 10/5/2021 | Conditional Approval | ALEJANDRO DE ARTOLA |
| Wood Frame | 10/5/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| Insulation | 10/7/2021 | Partial Approval | ALEJANDRO DE ARTOLA |
| Drywall Nailing | 10/13/2021 | Partial Approval | ALEJANDRO DE ARTOLA |
| Wood Frame | 10/21/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| Wood Frame | 10/26/2021 | Approved | ALEJANDRO DE ARTOLA |
| ELECTRICAL-Final | 10/27/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| Drywall Nailing | 10/29/2021 | Approved | ALEJANDRO DE ARTOLA |
| Underground Mechanical | 12/7/2021 | Approved | ALEJANDRO DE ARTOLA |
| ELECTRICAL-Final | 12/13/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| Final | 12/13/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| Gas Test | 12/13/2021 | Approved | ALEJANDRO DE ARTOLA |
| HVAC-Final | 12/13/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| PLUMBING-Final | 12/13/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| ELECTRICAL-Final | 12/14/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| Gas Test | 12/14/2021 | Approved | ALEJANDRO DE ARTOLA |
| HVAC-Final | 12/14/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| PLUMBING-Final | 12/14/2021 | Corrections Issued | ALEJANDRO DE ARTOLA |
| ELECTRICAL-Final | 4/7/2022 | Approved | ALEJANDRO DE ARTOLA |
| Final | 4/7/2022 | Corrections Issued | ALEJANDRO DE ARTOLA |
| HVAC-Final | 4/7/2022 | Corrections Issued | ALEJANDRO DE ARTOLA |
| PLUMBING-Final | 4/7/2022 | Approved | ALEJANDRO DE ARTOLA |
| SGSOV-Seismic Gas S/O Valve | 4/7/2022 | SGSOV Not Ready | ALEJANDRO DE ARTOLA |
| Service/Power Release | 4/7/2022 | Corrections Issued | ALEJANDRO DE ARTOLA |
| Smoke Detectors | 4/7/2022 | Approved | ALEJANDRO DE ARTOLA |
| Final | 5/25/2022 | Permit Finaled | ALEJANDRO DE ARTOLA |
| SGSOV-Seismic Gas S/O Valve | 5/25/2022 | SGSOV Approved | ALEJANDRO DE ARTOLA |