811 S APPELBY ST 90291

Certificate Information: 811 S APPELBY ST 90291

Application / Permit
21016-20000-18771
Plan Check / Job No.
B21VN09451
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Dwelling - Single Family
Work Description
REMODEL (E) SFD FOR (N) BATHROOMS, KITCHEN, CLOSET AND DINING ROOM. VAULT CEILING AT LIVING ROOM AREA. NEW WINDOWS AND INFILL WINDOWS THROUHGOUT. ALL WORK PER ENGINEERING.
Permit Issued
Issued on 9/8/2021
Issuing Office
Current Status
Issued on 9/8/2021

Permit Application Status History

Submitted 7/20/2021 APPLICANT
Assigned to Plan Check Engineer 7/28/2021 RAPHAEL ROSAS
Corrections Issued 7/29/2021 RAPHAEL ROSAS
Plan Check Approved 8/16/2021 RAPHAEL ROSAS
Building Plans Picked Up 8/18/2021 APPLICANT
Issued 9/8/2021 APPLICANT

Permit Application Clearance Information

No Data Available.

Contact Information

Contractor Rosegold Builders Inc; Lic. No.: 1041947-B 12200 RIVERSIDE DRIVE UNIT 4      VALLEY VILLAGE, CA 91607
Engineer Melchor,, Oscar Elias; Lic. No.: C76828 21243 VENTURA BLVD SUITE 119      WOODLAND HILLS, CA 91364

Inspector Information

RUBEN RIVAS, (310) 914-3981 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Wood Frame 9/29/2021 Partial Approval JOHNNY MIRANDA
BUILDING-Rough-Frame 10/18/2021 Corrections Issued DAVID FEILER
ELECTRICAL-Rough 10/18/2021 Partial Inspection DAVID FEILER
HVAC-Rough 10/18/2021 Partial Inspection DAVID FEILER
PLUMBING-Rough 10/18/2021 Partial Inspection DAVID FEILER
BUILDING-Rough-Frame 11/3/2021 Not Ready for Inspection RICHARD STEINBACH
ELECTRICAL-Rough 11/3/2021 Approved RICHARD STEINBACH
PLUMBING-Rough 11/3/2021 Not Ready for Inspection RICHARD STEINBACH
Wood Frame 11/3/2021 Partial Approval RICHARD STEINBACH
BUILDING-Rough-Frame 11/17/2021 Approved RICHARD STEINBACH
HVAC-Rough 11/17/2021 Approved RICHARD STEINBACH
Interior/Exterior Lathing 11/17/2021 Partial Approval RICHARD STEINBACH
PLUMBING-Rough 11/17/2021 Approved RICHARD STEINBACH
Wood Frame 11/17/2021 Approved RICHARD STEINBACH
Insulation 12/1/2021 Approved BOBBY KEY
Drywall Nailing 12/14/2021 Approved BOBBY KEY
Floor/Roof Diaphrgm/Shear Wall 12/14/2021 Approved BOBBY KEY
Shower Pan 12/14/2021 Approved BOBBY KEY
Interior/Exterior Lathing 12/30/2021 Partial Approval JOHNNY MIRANDA
Final 5/23/2022 Corrections Issued JESUS RODRIGUEZ
SGSOV-Seismic Gas S/O Valve 5/23/2022 SGSOV Approved JESUS RODRIGUEZ
Smoke Detectors 5/23/2022 Approved JESUS RODRIGUEZ