5932 N VESPER AVE 91411

Certificate Information: 5932 N VESPER AVE 91411

Application / Permit
21016-20000-16942
Plan Check / Job No.
B21VN08434
Group
Building
Type
Bldg-New
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
NEW 15'-11" X 24'-5" 2-STORY DETACHED ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). ALL WORK PER ENGINEERING.
Permit Issued
Issued on 9/12/2022
Issuing Office
Valley
Current Status
CofO Issued on 4/1/2024
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 7/1/2021 APPLICANT
Assigned to Plan Check Engineer 7/2/2021 RAPHAEL ROSAS
Corrections Issued 7/4/2021 RAPHAEL ROSAS
Applicant returned to address corrections 9/7/2021 RAPHAEL ROSAS
Plan Check Approved 10/22/2021 RAPHAEL ROSAS
Building Plans Picked Up 3/22/2022 APPLICANT
Issued 9/12/2022 APPLICANT
CofO in Progress 2/8/2024 RYAN SALAZAR
Permit Finaled 4/1/2024 DANIEL ORRANTE
CofO Issued 4/1/2024 DANIEL ORRANTE
Permit Finaled 4/1/2024 DANIEL ORRANTE

Permit Application Clearance Information

Address approval Cleared 8/5/2021 GABRIEL ROBLES
Roof/Waste drainage to street Cleared 8/5/2021 GABRIEL ROBLES
Eng Process Fee Ord 176,300 Cleared 8/12/2021 GABRIEL ROBLES
Sewer availability Cleared 8/12/2021 GABRIEL ROBLES
Construction near power lines Cleared 9/28/2021 JOHN BACON
Hydrant and Access approval Cleared 10/9/2021 GILBERT URREA
Public Works-Highway Ded. Cleared 7/5/2022 MEGAN GODINEZ
Public Works-Open Permits Cleared 7/5/2022 MEGAN GODINEZ
Public Works-Sewers Cleared 7/5/2022 MEGAN GODINEZ

Contact Information

Architect Chang,, Monica K; Lic. No.: C37524 2214 1/2 W 239TH STREET      TORRANCE, CA 90501
Contractor Koam Construction Inc; Lic. No.: 690788-B 4329 BRIGGS AVENUE      MONTROSE, CA 91020
Engineer Posadas,, John Garcia; Lic. No.: C30786 2063 PASEO LUCINDA      SAN DIMAS, CA 91773

Inspector Information

JOSE AVILA, (818) 374-1173 Office Hours: 7:00-8:00 AM MON-FRI
VINCENT HANLEY, (818) 374-1173 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Excavation/Setback/Form/Re-Bar 9/28/2022 Corrections Issued MICHEL ABAJAN
Footing/Foundation/Slab 10/4/2022 No Access for Inspection MICHEL ABAJAN
Underground Mechanical 10/4/2022 No Access for Inspection MICHEL ABAJAN
Excavation/Setback/Form/Re-Bar 10/5/2022 Corrections Issued MICHEL ABAJAN
PLUMBING-Rough 10/5/2022 Partial Approval MICHEL ABAJAN
Footing/Foundation/Slab 10/11/2022 Approved MICHEL ABAJAN
Floor/Roof Diaphrgm/Shear Wall 12/8/2022 Partial Approval RYAN SALAZAR
Deputy Drilled-In Anchors 12/14/2022 Conditional Approval ROBERT GOLD
Floor/Roof Diaphrgm/Shear Wall 12/19/2022 Partial Approval RYAN SALAZAR
BUILDING-Rough-Frame 2/3/2023 Approved RYAN SALAZAR
Green Building Rough 2/3/2023 Partial Approval RYAN SALAZAR
Interior/Exterior Lathing 2/3/2023 Partial Approval RYAN SALAZAR
Verify Sprinkler Sign Off 2/3/2023 Approved RYAN SALAZAR
BUILDING-Rough-Frame 2/17/2023 Corrections Issued MISAEL ESPARZA
ELECTRICAL-Rough 2/17/2023 Corrections Issued MISAEL ESPARZA
Green Building Rough 2/17/2023 Approved MISAEL ESPARZA
PLUMBING-Rough 2/17/2023 Corrections Issued MISAEL ESPARZA
ELECTRICAL-Rough 2/28/2023 Conditional Approval THOMAS FINNILA
PLUMBING-Rough 2/28/2023 Conditional Approval THOMAS FINNILA
Rough-Elec/Plmb/HVAC 4/3/2023 Approved RYAN SALAZAR
Wood Frame 4/3/2023 Approved RYAN SALAZAR
Insulation 4/12/2023 Conditional Approval JOHN COLEMAN
Drywall Nailing 5/1/2023 Approved RYAN SALAZAR
Shower Pan 6/1/2023 Approved RYAN SALAZAR
Interior/Exterior Lathing 6/9/2023 Approved RYAN SALAZAR
BUILDING-Rough-Frame 11/1/2023 Approved JUAN VALENZUELA
Final 11/1/2023 Corrections Issued JUAN VALENZUELA
Green Building Final 11/1/2023 Approved JUAN VALENZUELA
SGSOV-Seismic Gas S/O Valve 11/1/2023 SGSOV Approved JUAN VALENZUELA
Service/Power Release 11/1/2023 Not Required JUAN VALENZUELA
Smoke Detectors 11/1/2023 Approved JUAN VALENZUELA
Final 2/7/2024 OK to Issue CofO RYAN SALAZAR