650 N LAUREL AVE 90048

Certificate Information: 650 N LAUREL AVE 90048

Application / Permit
21016-20000-13692
Plan Check / Job No.
B21VN06580
Group
Building
Type
Bldg-Alter/Repair
Sub-Type
1 or 2 Family Dwelling
Primary Use
(1) Accessory Dwelling Unit
Work Description
CONVERT (E) 18' X 24'-4" DETACHED REC ROOM AND 18' X 20'-2" CARPORT INTO A (N) ACCESSORY DWELLING UNIT PER LAMC 12.22 A.33(c) AND (d). ALL WORK PER ENGINEERING.
Permit Issued
Issued on 7/11/2021
Issuing Office
Current Status
CofO Issued on 3/15/2023
Certificate of Occupancy
CofO Issued More Information

Permit Application Status History

Submitted 6/1/2021 APPLICANT
Assigned to Plan Check Engineer 6/2/2021 RAPHAEL ROSAS
Corrections Issued 6/3/2021 RAPHAEL ROSAS
Issued 7/11/2021 APPLICANT
Building Plans Picked Up 7/14/2021 APPLICANT
CofO in Progress 3/1/2023 MICHAEL LEWIS
CofO Issued 3/15/2023 DEROLD HAUFF
Permit Finaled 3/15/2023 DEROLD HAUFF

Permit Application Clearance Information

Address approval Cleared 6/10/2021 RENZ SORIANO
Sewer availability Cleared 6/10/2021 RENZ SORIANO
Eng Process Fee Ord 176,300 Cleared 6/15/2021 RENZ SORIANO

Contact Information

Contractor La Green Development Inc; Lic. No.: 1061369-B 15260 VENTURA BLVD 840      SHERMAN OAKS, CA 91403
Engineer Manlangit,, Vicente Balingasa; Lic. No.: C75499 7919 SAUSALITO AVE      WEST HILLS, CA 91304

Inspector Information

JOSE MACIAS, (213) 202-3125 Office Hours: 7:00-8:00 AM MON-FRI

Pending Inspections

No Data Available.

Inspection Request History

Pre-Inspection 12/23/2021 Approved CHRIS CHRISTENSEN
Deputy Drilled-In Anchors 1/5/2022 Conditional Approval CHRIS CHRISTENSEN
Footing/Foundation/Slab 1/5/2022 Not Ready for Inspection CHRIS CHRISTENSEN
Footing/Foundation/Slab 1/7/2022 Conditional Approval CHRIS CHRISTENSEN
Footing/Foundation/Slab 1/11/2022 Approved CHRIS CHRISTENSEN
PLUMBING-Rough 1/27/2022 Corrections Issued CRAIG DAVIS
PLUMBING-Rough 2/4/2022 Partial Approval CHRIS CHRISTENSEN
Gas Test 2/25/2022 Not Ready for Inspection CHRIS CHRISTENSEN
HVAC-Rough 2/25/2022 Corrections Issued CHRIS CHRISTENSEN
PLUMBING-Rough 2/25/2022 Approved CHRIS CHRISTENSEN
Underground Mechanical 2/25/2022 Partial Approval CHRIS CHRISTENSEN
ELECTRICAL-Rough 2/28/2022 Approved CHRIS CHRISTENSEN
HVAC-Rough 2/28/2022 Approved CHRIS CHRISTENSEN
Underground Mechanical 2/28/2022 Partial Approval CHRIS CHRISTENSEN
Floor/Roof Diaphrgm/Shear Wall 3/4/2022 Conditional Approval CHRIS CHRISTENSEN
Underground Mechanical 3/4/2022 Approved CHRIS CHRISTENSEN
Deputy Wood Construction 3/8/2022 Conditional Approval CHRIS CHRISTENSEN
Interior/Exterior Lathing 3/10/2022 Corrections Issued CHRIS CHRISTENSEN
Insulation 3/14/2022 Approved ARTHUR SARGSYAN
Interior/Exterior Lathing 3/14/2022 Approved ARTHUR SARGSYAN
BUILDING-Rough-Frame 3/16/2022 Corrections Issued ALIZAH MAYAGOITIA
Floor/Roof Diaphrgm/Shear Wall 3/16/2022 Not Ready for Inspection ALIZAH MAYAGOITIA
Green Building Rough 3/16/2022 Approved ALIZAH MAYAGOITIA
METHANE-Rough 3/16/2022 Not Ready for Inspection ALIZAH MAYAGOITIA
BUILDING-Rough-Frame 3/18/2022 Approved ARTHUR SARGSYAN
Floor/Roof Diaphrgm/Shear Wall 3/18/2022 Approved ARTHUR SARGSYAN
METHANE-Rough 3/18/2022 Approved ARTHUR SARGSYAN
Drywall Nailing 4/5/2022 Approved ADAM ESCOTO
Interior/Exterior Lathing 4/5/2022 Conditional Approval ADAM ESCOTO
Shower Pan 4/5/2022 Approved ADAM ESCOTO
Final 1/17/2023 Corrections Issued MICHAEL LEWIS
Green Building Final 1/17/2023 Approved MICHAEL LEWIS
SGSOV-Seismic Gas S/O Valve 1/17/2023 SGSOV Not Ready MICHAEL LEWIS
Smoke Detectors 1/17/2023 Approved MICHAEL LEWIS
Final 1/27/2023 Partial Inspection MICHAEL LEWIS
SGSOV-Seismic Gas S/O Valve 1/27/2023 SGSOV Approved MICHAEL LEWIS
Final 2/14/2023 Conditional Approval RUBEN SALAS
Final 3/1/2023 OK to Issue CofO MICHAEL LEWIS